HomeMy WebLinkAboutVideo Report RPD
BECLAN
SEWER INSPECTION
255 JERICHO AVE NE
RENTON WASH
98059
11/29/2012
BY KEVIN KEOUGH
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD J I BECLAN PLACE J RENTON
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 4 1 MH 3 KEVIN DP 210 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed
SHEET 1 11/29/2012 10:09 AM Yes
Length Precipitation Ground Surface Weather
None Wet Unpaved Clear
MH 4 Ftg. Condition Category Comments
•0.0 Upstream Manhole Structure MH 4
V
•50.1 Service Connection Left Structure
•61.5 Service Connection Right Structure
•75.8 Service Connection Left Structure
•82.5 Service Connection Right Structure
, K.„. i.)- ice II ')---
172.0 Service Connection Left Structure 67^
192.1 Service Connection Left Structure '—!
}} •196.3 Service Connection Right Structure
y 215.3 Service Connection Right Structure
290.6 Service Connection Left Structure
332.3 Service Connection Left Structure
•346.7 Downstream Manhole Structure MH 3
MH 3
Page 1 of 7 Generated on 11/29/2012 at 10:23 AM by the PipeTech®TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD BECLAN PLACE RENTON I I
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 2 MH 3 KEVIN DP 210 8 PVC J
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed
SHEET 2 11/29/2012 10:25 AM Yes j
Length Precipitation Ground Surface Weather
None Wet Unpaved Clear
MH 2 Ftg. Condition Category Comments
•0.0 Downstream Manhole Structure MH 2
V
•48.7 Service Connection Right Structure e)"
1 11� /6' �I D-
sTp
V
131.1 Service Connection Left Structure
•145.6 Upstream Manhole Structure MH 3
MH 3
Page 1 of 4 Generated on 11/29/2012 at 10:43 AM by the PipeTect°TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD BECLAN PLACE RENTON
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 2 MH 6 KEVIN ] P DP 210 8 PVC
MH H Depth Segment ID Backup Tape Tape Counter Date Time Dyed
SHEET 3 11/29/2012 10:43 AM Yes
Length Precipitation Ground Surface Weather
Heavy Rain Wet Unpaved Clear
MH 2 Ftg. Condition Category Comments
•0.0 Downstream Manhole Structure MH 2
r
__, heiI '.- ---
SIP
}
V
•38.3 Service Connection Right Structure
•56.2 Upstream Manhole Structure MH 6
MH 6
Page 1 of 4 Generated on 11/29/2012 at 10:52 AM by the PipeTech®TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497 •
Customer Project City Street
RPD BECLAN PLACE ] L_ RENTON 7
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 5 MH 1 KEVIN DP 210 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed
SHEET 4 11/29/2012 10:53 AM Yes
Length Precipitation Ground Surface Weather
Heavy Rain Wet Unpaved Clear
MH 5 Ftg. Condition Category Comments
•0.0 Downstream Manhole Structure MH 5
r
•46.5 Service Connection Right Structure
I / �
S
•159.5 Service Connection Right Structure
•208.8 Upstream Manhole Structure
MH 1
Page 1 of 4 Generated on 11/29/2012 at 11:09 AM by the PipeTech''TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD BECLAN PLACE RENTON
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 5A i 1MH 5 KEVIN DP 210 J 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date TimeDyed
SHEET 5 1 I 11/29/2012I 11_:20AM I Yes
Length Precipitation _ Ground Surface Weather
I 1 Heavy Rain 1 I Wet 1 Unpaved Clear
MH 5A Ftg. Condition Category Comments
..___Lo0.0 Downstream Manhole Structure MH 5A
V
( 11 J1
'D-----
Sni)
81 4
131.8 Service Connection Right Structure
181.5 Upstream Manhole Structure MH 5
MH 5
Page 1 of 4 Generated on 11/29/2012 at 11:28 AM by the PipeTech®TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD BECLAN PLACE RENTON
Start MH End MH Crew Truck Plpe Size Pipe Type
MH 5A MH EX SSMH KEVIN DP 210. I 8 PVC
MH Depth S ment ID Backup Tape Tape Counter Date Time ed
I SHEET IF11/29/2012-1 I _ 11:38 AM I Yes
Length Precipitation Ground Surface Weather
11- Heavy Rain ] ( Wet Unpaved _ Clear
MH 5A Ftg. Condition Category Comments
0.0 Upstream Manhole Structure MH 5A
V
I
r �. / ( I
5-re
I
51.5 Downstream Manhole Structure MH EX SSMH
MH EX SSMH
Page 1 of 4 Generated on 11/29/2012 at 11:41 AM by the PipeTech®TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD BECLAN PLACE RENTON E
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 7 MH 8 KEVIN DP 210 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed
SHEET 7 11/29/2012 12:20 PM Yes
Length Precipitation Ground Surface Weather
None Wet Paved Clear
MH 7 Ftg. Condition Category Comments
•0.0 Downstream Manhole Structure MH 7
r
�1
ii 1 I
3Z
V
•232.7 Upstream Manhole Structure MH 8
MH 8
Page 1 of 4 Generated on 11/29/2012 at 12:35 PM by the PipeTech®TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD 77 BECLAN PLACE ] RENTON
Start MH End MH Crew Truck Pipe Size Pipe Type
L MH 7 MH EX SSMH KEVIN DP 210 I I 8 IF PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time _ Dyed
SHEET 8
11/29/2012 12:35 PM—I Yes
Length Precipitation Ground Surface Weather
None Wet Unpaved Clear
MH 7 Ftg. Condition Category Comments
•0.0 Upstream Manhole Structure MH 7
UPV
•56.2 Service Connection Right Structure
•138.8 Service Connection Right Structure V
•158.9 Service Connection Right Structure
( 1 1 I
C.C1)
III
V •261.1 Service Connection Right Structure
•293.2 Service Connection Right Structure
•378.1 Service Connection Right Structure
•402.7 Upstream Manhole Structure MH EX SSMH
MH EX SSMH
Page 1 of 5 Generated on 11/29/2012 at 12:55 PM by the PipeTech®TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD I 1 BECLAN PLACE RENTON i
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 6 1 L MH C/O#1 KEVIN DP 210 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed
SHEET 9 11/29/2012 1:24 PM Yes
Length Precipitation Ground Surface Weather
None Wet Unpaved Clear
MH 6 Ftg. Condition Category Comments
''0.0 Downstream Manhole Structure MH 6
NV
•22.3 Service Connection Right Structure
0 k.,,
L L 111 1 D___
s-rp
V
•78.2 Service Connection Right Structure
•84.8 Service Connection Left Structure
MH C/O#184.8 Upstream Manhole Structure C/O#1
Page 1 of 5 Generated on 11/29/2012 at 1:31 PM by the PipeTech TV inspection system.
Drain-Pro
2901 72nd Street E
Tacoma, WA 98411
Phone: 253-539-4498
Fax: 253-539-4497
Customer Project City Street
RPD BECLAN PLACE RENTON
Start MH End MH Crew Truck Pipe Size Pipe Type
MH 1 I I MH 2 KEVIN DP 210 8 PVC
MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed
----1 I SHEET 10 I ! 11/29/2012 1:39 PM Yes
Length Precipitation Ground Surface Weather
[ None I L_ _ Wet Unpaved Clear
MH 1 Ftg. Condition Category Comments
0.0 Downstream Manhole Structure MH 1
V
20.5 Ponding 3/8" Pipe
0
1 4 63 /1
%--S 7-2°
If;
V
•73.7 Service Connection Left Structure
• 98 2 Upstream Manhole Structure MH 2
MH 2
Page 1 of 4 Generated on 11/29/2012 at 1:45 PM by the PipeTech®TV inspection system.