HomeMy WebLinkAboutVideo Inspection Report Pacific Concrete Services PACIFIC
26220 79th Av S
„„,
Kent, WA 98032 P C
Phone: 253-856-2572 Fax: 253-859-
5087
CONCRE'T'E SERVICES
TV Inspection with Pipe-Run Graph
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH12 TO E.R. MH11 RENTON LYONS AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media F
Downstream 107.0 Dry
ER.MH12 O
• + ryAt0.Oft./.
A )if))START DS-Start Inspection Downstream
o
o n
r 0
o= At 52.310/. J 49
€E LAT-Lateral connection +�J L At 55.0 ft 91.
LAT-Lateral connection
•
At97.8ft3/. J L$
LAT-Lateral connection
WJ LAt101.6ft9/.
LAT-Lateral connection
y y At107.0ft./.
)»)>stop 8 save
MH11
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032P C
Phone: 253-856-2572 Fax: 253-859-5087
CONCRETE SERVICES
I
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH11 TO E.R. MH10 RENTON LYONS AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media*
Downstream 163.6 Dry
ER.MH11 0
y At0.0ft./.
START DS-Start Inspection Downstream
N/ J �`At 34.919/.
LAT-Lateral connection
At 45.6 It 3/. j L 7-.11
LAT-Lateral connection
CO CO
m m
E,S V
p
At 98.5 ft 3/. J L� v
LAT-Labral connection J L At 103.1*9/.
'} LAT-Lateral connection
v
N.,••
�J LAt138.1ft91.
LAT-Lateral connection
At154.1 R3/.J L9'r
LAT-Lateral connection
y y At 163.6 It./.
?>>}>stop 8 save
(DER.MH10
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032 P C S
Phone: 253-856-2572 Fax: 253-859-5087
CONCRETE SERVICES
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH10 TO E.R. MH9 RENTON LYONS AVE NE
ROSEMONTE
Date PipeWdth: PipeHeight: PipeType:Pe: surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media€
Downstream 114.6 Dry
ER.MH10 O
•
� ►„� At0.0ft.1.
A �� 'START DS-Start Inspection Downstream
v
v
v
v
At37.1 ft 3/. J L+
LAT-Lateral connection � — 'J LAt40.1ft97.
LAT-Lateral connection
em u
CDv
� v
yJ L.At72.1ft91.
LAT-Lateral connection
v
v
At95.3ft3/. J L+ ;Y
LAT-Lateral connection
v y At114.6ft./.
}>>>)stop&save
MH9
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032 P C S
Phone: 253-856-2572 Fax: 253-859-5087
CONCRETE SERVICES
TV Inspection with Pipe-Run-'Graph
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH9 TO E.R. MH8 RENTON LYONS AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Foo : Weather Tape/Medra#
Downstream 119.4 Dry
ER.MH9 0
• vyAt0.Oft./.
A )7)))START DS-Start Inspection Downstream
V
N./
—J J LAt17.9ft9t.
LAT-Lateral connection
V
e�
dm
0>
0 V
a
m +J LAt72.0ft9/.
LAT-Lateral connection
At119.4ft./
Q
>y))),stop 8 save
`O E.R.MH8
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services , PACIFIC
26220 79th Av S
Kent, WA 98032 P C S
Phone: 253-856-2572 Fax: 253-859-5087
CONCRETE SERVICES
I
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH8 TO E.R. MH2 RENTON LYONS AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media
Downstream 245.7 Dry
E.R.MH8
®)
-----
- b� S ./.
?»?)START DS-Start Inspection Downstream
LAt4.7ft9/.
;•ii/ LAT-Lateral connection
LAt56.5ft9/.
LAT-Lateral connection
At 77
LAT-Lateral connection
C
r u"
a
N
N
N
mr
� v
At186.01t3/.JL(
LAT-Lateral connection
y ! At 245.7 ft./.
?»>>STOP-Inspection Stopped
MH2
TV Inspection with Pipe-Run Graph Page 1 of
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032 P C
Phone: 253-856-2572 Fax: 253-859-5087
CONCRETE SERVICES
I
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH2 TO E.R. MH1 RENTON
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media
Downstream 160.9 Dry
ER.MH21I(E
O� y y At0.0ft/.
START DS-Start Inspection Downstream
V
•
y J LAt61.2R31.
LATCAPPED-LATERAL CAPPED
cn
arrn
Nti
f)
'1)
No/
v
RA.
INFILTRATION AT MN
At160.91t.1.
OE.R.MH1 )))))stop&save
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032P C S
Phone: 253-856-2572 Fax: 253-859-5087 5087
CONCRETE SERVICES
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH19 TO E.R. MH2O RENTON MT BAKER AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media i
Upstream 32.5 Dry
ER.MH2O!O
I }j7)?
v
� v
t
m
5 p
Q 3
M ST4RT �:.Start In.�-..:non UFr,.tretnn
O•
E.R.MH19
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032P C
Phone: 253-856-2572 Fax: 253-859-5087 5087
CONCRETE SERVICES
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH19 TO E.R. MH18 RENTON MT BAKER AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media#
Downstream 183.6 Dry
ER.MH19
• At0.Oft./.
A ;)))START DS-Start Inspection Downstream
YJ LAt26.8ft9/.
LAT-Lateral connection
At44.4ft3/. J L+
LAT-Lateral connection
v
r m
m0)
of'n
o)
N
YJ LAt103.9ft9l.
At107.9ft3l.J L� � LAT-Lateral connection
4.4
LAT-Lateral connection
YJ LAt134.3ft91.
LAT-Lateral connection
At165.5ft31.J Lir J[
LAT-Lateral connection
V +� At183.6ft./.
})>))stop 8 save
CDE.R.MH18
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032
Phone: 253-856-2572 Fax: 253-859-5087 5087
CONCRETE SERVICES
I
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH18 TO E.R. MH13 RENTON MT BAKER AVE NE
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media#r
Downstream 204.9 Dry
ER.MI-118 0
•
At0.0ft./.
A >»»START DS-Start Inspection Downstream
v
^.1 ♦JLAt19.41t91.
LAT-Lateral connection
At 44.9113/.
J.L�
LAT-Labral connection
4_11 At51.91t9l.
LAT-Lateral connection
e� v
°
Or" -
r"fi At101.61t31.J L�
6 ' LAT-Lateral connection CQ
m
16,4,71__
LAt119.6R9/.
LAT-Lateral connection
V
At159.8ft31.J LS
LAT-Lateral connection y L At164.8*91.
bJ LAT-Lateral connection
v
v
® At204.9ft./.
V »»>STOP-Inspection Stopped
CDE.R.MH13
TV Inspection with Pipe-Run Graph Page 1 of 1
Pacific Concrete Services PACIFIC
26220 79th Av S
Kent, WA 98032P C S
Phone: 253-856-2572 Fax: 253-859-5087
CONCRETE SERVICES
I
Project Name: Asset ID: City: Address:
EAST RENTON/ E.R. MH8 TO E.R. MH13 RENTON NE 8TH PL
ROSEMONTE
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
9/7/2012 8 8 PVC Un Paved
Direction: Surveyed Footage: Weather Tape/Media A
Upstream 255.6 Dry
E.R.MH13IC)
N/
at.•,° J L
LAT-Late,'
v
At 15S., J L
LAT-Lateral connear
em
(0(0
aa,
N N
11'
At', ,,it., JL'
LAT-Lateral connection
v
®E.R.MH8
TV Inspection with Pipe-Run Graph Page 1 of 1