HomeMy WebLinkAboutVideo Inspection Report Pipeline Video and Cleaning Video Inspection Report
35849 Military Rd S,Aubum,WA 98001
800.TV.A.PIPE 253.661.0828
Assigned ID: PO or Job# Start Date 2/16/2005
Client: Covington Concrete , Legal description or orientation:-
Project Name: Rod Williams Project
Address: 12841 80th Ave. So.
City: Renton State: WA Technician: Dee Overman
Weather: Clear Truck Number: 0 Inspector: - None
;Staifing.Structure ....Depth Ending,.Structure: Depth , Direction VideoRef :LineLength :;'
MH-1 N/A CO N/A Upstream 0:00:19 326.6
Line Type:,:,`: f Pipe Type:-..- Size: Ref;,Ball ;A. Test Air Quality:: ;Ventilated -:Mandrell: Pass;
Sanitary PVC 8" 1" N/A N/A N/A No N/A
Date 'Cleaned:,_ Comments - - _. , tape
2/16/2005 , No 1
Footage Position Comments Severity Notes Photo Clip Vid Ref
1 0.0 j Start of inspection-center line of structure ❑ 0:00:19 '
2 61.5 Service lateral right- ❑
3 203.4 Service lateral right- ❑
-
4 I 249.2 I Service lateral right- ❑
5 315.4 1 Service lateral right- ❑
6 318.5 1 ' Service lateral right- ❑
7 321.4 I Service lateral right- ❑ —
8 324.0 1 ; See Notes:cleanout ❑ '
9 326.6 1 See Notes:Service Lateral Forward ❑
10 326.6 I i End of inspection-service lateral J ❑ 0:22:24 I
Page 1 of 1
Pipeline Video and Cleaning
35849 Military Rd S,Auburn,WA 98001 Video Inspection Summary
800.TV.A.PIPE 253.661.0828
PO or Job#: Date: 02/16/05
Company: Covington Concrete Truck number: 0
Project Name: Rod Williams Project Assigned job number:
Address: 12841 80th Ave. So. Inspector:
City, State: Renton WA Technician: Overman
Page Tape No. Starting MH Ending MH Type Size Material Direction Cleaned Length
1 1 MH-1 CO Sanitary 8" PVC Upstream No 326.6
Summary for Rod Williams Project(1 detail record) Total footage: 326.6