HomeMy WebLinkAboutVideo Inspection Report Ventilation Power Cleaning
Northwest Video Service
Observations by Inspections
SITE DATA
Site ID City Address Upstream Node Downstream Node
SMH#7 - 8 Renton SMH# 8 SMH# 7
Pipe Type Pipe Shape Pipe Height Pipe Width
Plastic Circular 8 8
INSPECTION DATA
Planned Date Start Date End Date
6/14/2007 3:12:18 PM 6/14/2007 3:15:27 PM 6/14/2007 3:25:20 PM
Surveyed Footage Status Operator Work Order No.
201.3 Stopped Keith
Reason Weather Condition
Pre-Acceptance Dry Satisfactory
Comments
OBSERVATIONS
Footage Rev. Length Clock From Clock To Code Modifiers/Severity Rating
5.0 Yes START US
65.3 Yes 0.0 9 LAT
201.3 Yes STOP
Observations By Inspections Thursday,June 14,2007 3:26 PM Page 1 of 1
t
i
Ventilation Power Cleaning
Northwest Video Service
Observation Report with Still Images
Main Asset ID: Project Name: Inspection Date: Weather: Operator:
SMH#7 - 8 Ceccanti 6/14/2007 Dry Keith
3:15:27 PM
Upstream Node: Downstream Node: Main Length:
SMH# 8 SMH# 7 201.0
Comments:
Observations
Distance Len•th Code Reversed Clock Pos. Severit Comm.,---- .-11111r---'-11
5.0 START US Yes /
65.3 0.0 LAT Yes 9 / Left lateral
201.3 STOP Yes /
Observations with Still Images Thursday,June 14,2007 3:25 PM Page 1 of 1
Ventilation Power Cleaning
4 Northwest Video Service
TV Inspection with Pipe-Run Graph
Project Name: Asset ID: City: Address:
Ceccanti SMH#7 - 8 Renton
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
6/14/2007 8 8 Plastic Dirt
Direction: Surveyed Footage: Weather Tape/Media#
Upstream 201.3 Dry
SMH#
�• iS At201.3ft 1. -0.0ft
A no)STOP-Inspection Stopped
0n
oo
oo
O N
N
tao.oft
At 653 ft 9/. j
LAT-Lateral connection
►�At 5.0 ft J.
) START US-Start Inspection Upstream 200 Oft
•SMHi7
TV Inspection with Pipe-Run Graph Thursday,June 14,2007 3:25 PM Page 1 of 1