Loading...
HomeMy WebLinkAboutVideo Inspection Report Ventilation Power Cleaning Northwest Video Service Observations by Inspections SITE DATA Site ID City Address Upstream Node Downstream Node SMH#7 - 8 Renton SMH# 8 SMH# 7 Pipe Type Pipe Shape Pipe Height Pipe Width Plastic Circular 8 8 INSPECTION DATA Planned Date Start Date End Date 6/14/2007 3:12:18 PM 6/14/2007 3:15:27 PM 6/14/2007 3:25:20 PM Surveyed Footage Status Operator Work Order No. 201.3 Stopped Keith Reason Weather Condition Pre-Acceptance Dry Satisfactory Comments OBSERVATIONS Footage Rev. Length Clock From Clock To Code Modifiers/Severity Rating 5.0 Yes START US 65.3 Yes 0.0 9 LAT 201.3 Yes STOP Observations By Inspections Thursday,June 14,2007 3:26 PM Page 1 of 1 t i Ventilation Power Cleaning Northwest Video Service Observation Report with Still Images Main Asset ID: Project Name: Inspection Date: Weather: Operator: SMH#7 - 8 Ceccanti 6/14/2007 Dry Keith 3:15:27 PM Upstream Node: Downstream Node: Main Length: SMH# 8 SMH# 7 201.0 Comments: Observations Distance Len•th Code Reversed Clock Pos. Severit Comm.,---- .-11111r---'-11 5.0 START US Yes / 65.3 0.0 LAT Yes 9 / Left lateral 201.3 STOP Yes / Observations with Still Images Thursday,June 14,2007 3:25 PM Page 1 of 1 Ventilation Power Cleaning 4 Northwest Video Service TV Inspection with Pipe-Run Graph Project Name: Asset ID: City: Address: Ceccanti SMH#7 - 8 Renton Date Pipe Width: Pipe Height: Pipe Type: Surface Condition: 6/14/2007 8 8 Plastic Dirt Direction: Surveyed Footage: Weather Tape/Media# Upstream 201.3 Dry SMH# �• iS At201.3ft 1. -0.0ft A no)STOP-Inspection Stopped 0n oo oo O N N tao.oft At 653 ft 9/. j LAT-Lateral connection ►�At 5.0 ft J. ) START US-Start Inspection Upstream 200 Oft •SMHi7 TV Inspection with Pipe-Run Graph Thursday,June 14,2007 3:25 PM Page 1 of 1