Loading...
HomeMy WebLinkAboutVideo Inspection Report t Ventilation Power Cleaning Northwest Video Service Observations by Inspections SITE DATA Site ID City Address Upstream Node Downstream Node MH#1 - #2 Renton N 8th St &Park Av N SSMH# 2 SSMH# 1 Pipe Type Pipe Shape Pipe Height Pipe Width Plastic Circular 8 8 INSPECTION DATA Planned Date Start Date End Date 6/20/2007 7:23:27 AM 6/20/2007 7:26:05 AM 6/20/2007 7:52:23 AM Surveyed Footage Status Operator Work Order No. 341.6 Stopped Keith Reason Weather Condition Pre-Acceptance Dry Satisfactory Comments OBSERVATIONS Footage Rev. Length Clock From Clock To Code Modifiers/Severity Rating 5.0 Yes START US 341.6 Yes STOP Observations By Inspections Wednesday,June 20,2007 7:53 AM Page 1 of 1 Ventilation Power Cleaning Northwest Video Service Observation Report with Still Images Main Asset ID: Project Name: Inspection Date: Weather: Operator: MH#1 - #2 Ceccanti 6/20/2007 Dry Keith 7:26:05 AM Upstream Node: Downstream Node: Main Length: SSMH# 2 SSMH# 1 341.0 Comments: Observations Distance Len•th Code Reversed Clock Pos. Severity Comment 5.0 START US Yes / 341.6 STOP Yes / Observations with Still Images Wednesday,June 20,2007 7:53 AM Page 1 of Ventilation Power Cleaning Northwest Video Service TV Inspection with Pipe-Run Graph Project Name: Asset ID: City: Address: Ceccanti MH#1 - #2 Renton N 8th St&Park Av N Date Pipe Width: Pipe Height: Pipe Type: Surface Condition: 6/20/2007 8 8 Plastic Dirt Direction: Surveyed Footage: Weather Tape/Media# Upstream 341.6 Dry SSMH# • At341.6tt/. oon »»)STOP-Tspecl`on Slopped 100.01 0 0 a PI ii 200.08 300.0 R ►�At5.ORl. (o`� - - >>>»START US-Start Inspection Upstream SSMHS 1 TV Inspection with Pipe-Run Graph Wednesday,June 20,2007 7:52 AM Page 1 of 1