HomeMy WebLinkAboutVideo Inspection Report t
Ventilation Power Cleaning
Northwest Video Service
Observations by Inspections
SITE DATA
Site ID City Address Upstream Node Downstream Node
MH#1 - #2 Renton N 8th St &Park Av N SSMH# 2 SSMH# 1
Pipe Type Pipe Shape Pipe Height Pipe Width
Plastic Circular 8 8
INSPECTION DATA
Planned Date Start Date End Date
6/20/2007 7:23:27 AM 6/20/2007 7:26:05 AM 6/20/2007 7:52:23 AM
Surveyed Footage Status Operator Work Order No.
341.6 Stopped Keith
Reason Weather Condition
Pre-Acceptance Dry Satisfactory
Comments
OBSERVATIONS
Footage Rev. Length Clock From Clock To Code Modifiers/Severity Rating
5.0 Yes START US
341.6 Yes STOP
Observations By Inspections Wednesday,June 20,2007 7:53 AM Page 1 of 1
Ventilation Power Cleaning
Northwest Video Service
Observation Report with Still Images
Main Asset ID: Project Name: Inspection Date: Weather: Operator:
MH#1 - #2 Ceccanti 6/20/2007 Dry Keith
7:26:05 AM
Upstream Node: Downstream Node: Main Length:
SSMH# 2 SSMH# 1 341.0
Comments:
Observations
Distance Len•th Code Reversed Clock Pos. Severity Comment
5.0 START US Yes /
341.6 STOP Yes /
Observations with Still Images Wednesday,June 20,2007 7:53 AM Page 1 of
Ventilation Power Cleaning
Northwest Video Service
TV Inspection with Pipe-Run Graph
Project Name: Asset ID: City: Address:
Ceccanti MH#1 - #2 Renton N 8th St&Park Av N
Date Pipe Width: Pipe Height: Pipe Type: Surface Condition:
6/20/2007 8 8 Plastic Dirt
Direction: Surveyed Footage: Weather Tape/Media#
Upstream 341.6 Dry
SSMH#
• At341.6tt/. oon
»»)STOP-Tspecl`on Slopped
100.01
0
0
a
PI
ii
200.08
300.0 R
►�At5.ORl.
(o`� - - >>>»START US-Start Inspection Upstream
SSMHS 1
TV Inspection with Pipe-Run Graph Wednesday,June 20,2007 7:52 AM Page 1 of 1