Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutP_CIVIL_PLANS_HUYNH_SHORT_PLAT_190807.pdfWATER UTILITY
agafour 08/09/2019
WASTEWATER UTILITY
dchristen 04/09/2019
REGIONAL FIRE AUTHORITY
cthomas 04/09/2019
APPROVED
SURFACE WATER UTILITY
jfarah 04/12/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019
6" THICK
ETHAFOAM PAD
GATE
8" VERTICAL CROSS (MJxFL)
PER STD PLAN NO. 300.6
AND 8" CAP W/2" B.O. ASSEMBLY
AND THRUST BLOCK
WATER UTILITY
agafour 08/09/2019
WASTEWATER UTILITY
dchristen 04/09/2019
SURFACE WATER UTILITY
jfarah 04/12/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019
SURFACE WATER UTILITY
jfarah 04/12/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019
WATER UTILITY
agafour 08/09/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019
WASTEWATER UTILITY
dchristen 04/09/2019
WATER UTILITY
agafour 08/09/2019
DEVELOPMENT ENGINEERING
jchavez 08/12/2019