HomeMy WebLinkAboutR-405409LO
0
i
C)
0
w
r-)
z
J
r=
V
-17
17
U)
rr
Q
I)
w
U
63
w
Ld
z
L,
OP o
II
SDCB
RIM=436.35 1�
12"CPP=433.75(N,S)
SE 1/4 SECT/ON 14, TOWNSHIP 23 N, RANGE 5 E, W.M.
CAMA% A
fir-anqRS A T THE HIGHLANDS
O � 1
I
I. SEE SHEET C10 FOR
12"CPP=432.15(N) - . I
16'
PA VEMEN T oo
+ I
N
8'
LAN TER � �k
12"CPP=430.77
I I
TRANSFORMER(N)
I
� I
OP II
I
1 CB
12"CPP b 3(N)
12"CPP=429.78(E)
12"CMP=429.05(W) o I.
+ I
PA VEMENT RESTORA TION
LIMI IS FOR GAS, WA TER,
SEWER, AND STORM
CONNECTIONS TO BE
COORDINA TED WITH THE
CITY INSPECTOR.
SEE PA VEMENT 104 0
RESTORATION NOTE, THIS
SHEET.
wIKtS uuwlv�s� STOP
SIGN
� I
SDCB
0
RIM=429 85
12"CPP=427.27(S) a
N
c
SAWCUT LINE TYP.
;TR CHANNEL=421.:.
REMOVE & REPLACE EX. SPEED
LIMIT SIGN AND POST IF DAMAGED
OR LOST. REPLACE SIGN &
POST PER CITY STD. PLANS,
IKHIVJrUKMtK�IVJ
WIRES DOWN(S)
\
I
1
Op
�
o
N
REMOVE & REPLACE EX STREET
II
NAME SIGNS, SCHOOL WALK SIGN
AND POST IF DAMAGED OR LOST.
REPLACE SIGN & POST PER CITY
STD. PLANS.
FOUND 4"X4" CONCRETE
ONUMENT WITH PUNCHED
3" DOMED BRASS DISK
STAMPED "38992", DOWN
0.5' IN MONUMENT CASE.
r \�
Call 2 Working Days Before You Dig
811
Utilities Underground Location Center
(ID,MT,ND,OR,WA)
ASPHALT RAMP DETAIL \
& GRADING
FOUND 1/2" REBAR W/ CAP
+32.01(N) 611
'VBF IS 0.6'N. OF R STAMPED "DMP INC LS 22962 SSMH
6'VBF IS 1.4'N. OF i'L WATER VALVE 0.2'S. OF PROP LINE \ RIM=425.61
FOUND 1/2" REBAR W/ CAP m & BLOWOFF 6'VBF IS 0.2'N. OF i'L IE DROP=417.21
STAMPED "DMP INC LS 22962" 110 2' TALL CONIC\
8"PVC (N,E,S)
0.2'S. X 0. VW. OF P.C. x BLOCK WALL @ R 4'HWF IS CTR CHANNEL=4u-
;" ------ OF F'L \�
6'VBF 4'HWF IS TN. OF T 4'HWF IS 4'HWF CORNER IS
I "-----Iwr �HWF 0.1'N. OF R 0.2'S X 0.1'W. OF d:
\
TREE �'ETNTION 4'HWF IS_
5' SIDEWALK 0.2 S. OF x
FG 434.30
--- ---'
20 x30' PRI VA TE ` 1" I prm�r' i I`� \ II \' - - - x,
ACCESS EASEMENT : ; I \ \ II �� _ _ �r
15' WA TER AND I ` _T1 - - -
ACCESS EASEMENT �\ \\`Ti4'A` T`� --
�.. I
CRITICAL AREA x
ff \
p
FG 428.10 �0 I o B A IN a\\ \
FG 427.40 I I \ _ _ - -426 - I CARPO T �\ \` \ 5' X 24' PEDESTRIAN BRIDGE:
12 I _ - SEE STRUCTURAL PLANS SB1
FG 433.60 FOR MORE DETAILS
a 53' ROW 10' PRI VA TE JOINT B I _ _ - _ i x x
28' UTILITY EASEMENT
PA VEMENT I / / \
\--WIDTH --432_-- I \ \
---- ' 11
o I1,
ao - -
C _ - / W4
c
% 4' F I Q
n e a
11+00 NPAT 12+00-r-
��07' 15�00 SSMH
�P -f 13f00 a RIM=421.45
8"PVC (N,S)
i af CTR CHANNEL=40..
I
14+0 I al / ' ,G
5' SIDEWALK -- --- ------___
REDUCED 22'
PA VEMENT
WIDTH 10' PRIVATE JOINT
UTILITY EASEMENT
e I lb'
1 2 3 A
FG 430.40 FG 429.80 FG 427.00 `�
FG 426.30
: .:::.
. \
_ 6'VBF IS
4'H WF " / 0.8' 426
I �,
\ VBF 424 422
FOUND 3" XA _HEG01``` r--- I Imo.
BOLT 0.2'S. X 0.2'E. u1'r.u. L 4'HWF IS ONI FL' 6'VBF IS
0.1'N. 0 m I
4'HWF IS 1.0'S. OF FE
SDCB
RIM=427.56
1 7 ,(PP=474
SEE SHEET C10 FOR
ASPHALT RAMP DETAIL
& GRADING
L. PI EIj7S
O'C WAS�gl
� � w
53232 _
�SSIDNAL
b�p•lg
L
2
- - - - - - - - - - - - r
25' PUBLIC
STORM AND
PROVIDE 'MAINTENANCE SEWER
ACCESS" SIGNAGE; EASEMENT \
5 2 REMOVABLE AND 2 FIXED
FG 424.60 BOLLARDS PER STANDARD
DETAILS H021 AND H022,
SEE SHEET C21 7
5 FG 422.40 N
SITE VOLUME CALCULATIONS
CUT VOLUME FILL VOLUME NET VOLUME
(CU. YDS.) (CU. YDS.) (CU. YDS)
4,059 9,217 5,158 /MPOR T
(INCLUDES 2,900 CU.
YDS. OF VAUL T)
ALL VOLUMES ARE APPROXIMATE AND ARE PROVIDED FOR PERMITTING
PURPOSES AND REPRESENT FINISH GRADE TO EXISTING GRADE AS SHOWN.
CONTRACTOR SHALL RELY ON HIS/HER OWN ESTIMATES FOR DETERMINING
ACTUAL EARTHWORK QUANTITIES.
THE VOL LIMES INCL UDE THE AREA FOR VAUL T EXCA VA TION. THE VOL LIMES
DO NOT INCLUDE STRIPPING, EXPANSION/COMPACTION FACTOR OR ANY SOIL
TYPE RESTRICTIONS.
D.R. STRONG
CONSUL TING ENGINEERS
ENGINEERS PLANNERS SURVEYORS
620 - 7th AVENUE KIRKLAND, WA 98033
O 425 827 3063 F 425 827 2423
1 CITY COMMENTS 02.19.19
1 CITY COMMENTS 05.03.19
N0.
REVISION
PATH SHALL BE FLUSH WITH
-_ -- FG 423.80 - GRAVEL ACCESS ROAD
420 422
418-��
- -418
WALL 24"CPP=414.33
24"CPP=412.44
� II II \I I II
I II
0l1
I I ,
I I I I I 1�:•: ���::
Iv ::
...... 48" ULVERT=407.43(S,
419"CHI VFRT=4n7.33(N)
DRD 04.11.19 YLP SURVEYED:
JGR
CYW 06.20.19 YLP DESIGNED:
YLP
DRAWN:
GLB
CHECKED:
YLP
BY DATE APPR APPROVED
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
GEO TECH RECOMMENDA TIONS.•
THE FOLLOWING PERTAINS TO THE GENERAL SITE ONLY.
EAR TH SOL U TIONS NW L L C STA TES THA T BASED ON THE RESUL IS OF THE STUD Y PERFORMED,
THE PROPOSED RESIDENTIAL BUILDINGS CAN BE SUPPORTED ON CONVENTIONAL CONTINUOUS AND
SPREAD FOOTING FOUNDATIONS BEARING ON COMPETENT NATIVE SOILS, RE -COMPACTED NATIVE
SOILS, OR NEW STRUCTURAL FILL. SLAB -ON -GRADE FLOORS SHOULD BE SUPPORTED ON DENSE
NATIVE SOILS OR STRUCTURAL FILL. COMPETENT SOILS SUITABLE FOR SUPPORT OF FOUNDATIONS
SHOULD BE ENCOUNTERED AT DEPTHS OF ONE TO THREE FEET BELOW EXISTING GRADES EXCEPT
WHERE DEEPER EXISTING FILL IS LOCATED. WHERE LOOSE OR UNSUITABLE SOIL CONDITIONS ARE
EXPOSED AT FOUNDATION SUBGRADE ELEVATIONS, LIKE MAY EXIST THROUGHOUT THE WESTERN
PORTION OF THE SITE, COMPACTION OF THE SOILS TO THE SPECIFICATIONS OF STRUCTURAL FILL,
OR OVEREXCAVATION AND REPLACEMENT WITH A SUITABLE STRUCTURAL FILL WILL BE NECESSARY
IN -SITU SOILS
THE SOILS ENCOUNTERED THROUGHOUT THE MAJORITY OF THE TEST SITES HAVE A MODERATE TO
HIGH SENSITIVITY TO MOISTURE AND WERE GENERALLY IN A MOIST CONDITION AT THE TIME OF
EXPLORATION (JUNE 2016). IN THIS RESPECT, THE IN -SITU SOILS MAY NOT BE SUITABLE FOR USE
AS STRUCTURAL FILL IF THE SOIL MOISTURE CONTENT IS MORE THAN 3 PERCENT ABOVE THE
OPTIMUM LEVEL AT THE TIME OF CONSTRUCTION. IN GENERAL, SOILS ENCOUNTERED DURING THE
SITE EXCAVATIONS THAT ARE EXCESSIVELY OVER THE OPTIMUM MOISTURE CONTENT WILL REQUIRE
MOISTURE CONDITIONING PRIOR TO PLACEMENT AND COMPACTION. CONVERSELY, SOILS THAT ARE
BELOW THE OPTIMUM MOISTURE CONTENT WILL REQUIRE MOISTURE CONDITIONING THROUGH THE
ADDITION OF WATER PRIOR TO USE AS STRUCTURAL FILL. IF THE IN -SITU SOILS ARE DETERMINED
TO NOT BE SUITABLE FOR USE AS STRUCTURAL FILL, THEN USE OF A SUITABLE IMPORTED SOIL
MA Y BE NECESSAR Y.
STRUCTURAL FILL
STRUCTURAL FILL IS DEFINED AS COMPACTED SOIL PLACED IN FOUNDATION, SLAB -ON -GRADE,
AND ROADWAY AREAS. FILLS PLACED TO CONSTRUCT PERMANENT SLOPES AND THROUGHOUT
RETAINING WALL AND UTILITY TRENCH BACKFILL AREAS ARE ALSO CONSIDERED STRUCTURAL FILL.
SOILS PLACED IN STRUCTURAL AREAS SHOULD BE PLACED IN LOOSE LIFTS OF 12 INCHES OR
LESS AND COMPACTED TO A RELATIVE COMPACTION OF 95 PERCENT, BASED ON THE
LABORATORY MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR METHOD (ASTM
D-1557). SOIL PLACED IN UTILITY TRENCHES, PAVEMENT AREAS, AND IN SLAB -ON -GRADE AREAS
SHOULD BE COMPACTED TO A RELATIVE COMPACTION OF AT LEAST 95 PERCENT. ADDITIONALLY,
MORE STRINGENT COMPACTION SPECIFICATIONS MAY BE REQUIRED FOR UTILITY TRENCH BACKFILL
ZONES, DEPENDING ON THE RESPONSIBLE UTILITY DISTRICT OR JURISDICTION.
DRAINAGE
PERCHED SEEPAGE SHOULD BE ANTICIPATED IN SITE EXCAVATIONS ON THE SITE, PARTICULARLY
DURING WINTER, SPRING, AND EARLY SUMMER MONTHS. HEAVY SEEPAGE SHOULD BE EXPECTED
WHERE EXISTING FILL IS LOCATED. TEMPORARY MEASURES TO CONTROL SURFACE WATER RUNOFF
AND GROUNDWATER DURING CONSTRUCTION WOULD LIKELY INVOLVE INTERCEPTOR TRENCHES AND
SUMPS. EARTH SOLUTIONS NORTHWEST SHOULD BE CONSULTED DURING PRELIMINARY GRADING TO
IDENTIFY AREAS OF SEEPAGE AND TO PROVIDE RECOMMENDATIONS TO REDUCE THE POTENTIAL
FOR INSTABILITY RELATED TO SEEPAGE EFFECTS.
IN OUR OPINION, FOUNDATION DRAINS SHOULD BE INSTALLED ALONG BUILDING PERIMETER
FOOTINGS. A TYPICAL FOUNDATION DRAIN DETAIL IS PROVIDED AS PLATE 4.
WITHIN CITY LIMITS, PAVEMENT RESTORATION SHALL BE PER C.O.R. STREET RESTORATION AND STREET
OVERLAY STANDARDS AND/OR AS FIELD SPECIFIED BY THE CITY INSPECTOR. MINIMUM REQUIRED
RESTORATION FOR TRENCHES RUNNING PARALLEL TO THE STREET IS HALF STREET WIDTH GRIND &
OVERLAY. IF OUTSIDE OF THE PARALLEL TRENCHING IS WITHIN 3 FEET OF ANY ADJACENT LANE, THEN
THE ENTIRE STREET WIDTH WILL BE OVERLAID.
BACK OF SIDEWALK SLOPE NOTE
GROUND SLOPE BEHIND SIDEWALK SHALL NOT EXCEED 4: 1 FOR A DISTANCE OF THREE (3) FEET.
AFTER THREE (3) FEET, SLOPE MAY BE INCREASED TO A MAXIMUM OF 2: 1.
BUILDING PERM/ TS
VAULT TO BE APPROVED UNDER SEPARATE PERMIT.
SIGN NOTE.•
NPAT = NO PARKING ANY TIME
SEE SHEET C27 FOR DETAILS
ROAD WORK SCHEDULE.-
10 STA. 21+03.71, 15.00 R BEGIN FRONTAGE IMPROVEMENTS
BEGIN HALF STREET GRIND AND OVERLAY
Q STA. 24+33.44, 15.00 R END FRONTAGE IMPROVEMENTS
BEGIN 10: 1 EDGE OF PAVEMENT TAPER
30 STA. 24+91.80, 9.82 R END HALF STREET GRIND AND OVERLAY
END 10. 1 TAPER
UNDERGROUND/NG NO TE.•
POWER LINES TO BE UNDERGROUNDED FROM EXISTING POWER POLES. POWER PLANS TO BE PROVIDED
BY PUGET SOUND ENERGY. ALL EXISTING UTILITIES IN FRONTAGE AND WITHIN SITE ARE REQUIRED TO
BE UNDERGROUND.
PEDESTRIAN WALKWAY NOTE:
ASPHALT WALKWAY SHOULD BE FLUSH WITH THE ACCESS ROAD GRAVEL. WALKWAY TO AVOID STORM
AND SEWER MANHOLES OR PIPES WHERE FEASIBLE.
T
T
C)
C)
m
X�J
00
T
C)
C)
T
Q
J
C)
C)
T
R-4054090
G� z
IN COMPLIANCE WITH CITY OF RENTON STANDARDS J
mw 2
DEVELOPMENT ENGINEERING
N O FRTH bbannwarth 07/01/2019 _
GRAPHIC SCALE w
` 2 ' 40' 80' TRANSPORTATION OPERATION
1 INCH = 40 FT.
cbarnes 07/10/2019 ~
DATE:
C TY 0
CEDARS AT THE HIGHLANDS 01.29.19
1."RROAD AND GRADING PLAN FIELDBOOK:
RENT 0 N PAGE:
_<
DRAWING NO: Q
Planning/Building/Public Works Dept. 14120 160TH AVENUE SE C9 W
RENTON, WASHINGTON 98059 SHEET: 9 OF:28 U
DRS PROJECT NO. 16041