HomeMy WebLinkAboutRC 20160120002063 11111113111111111111
20160120002063
PAGE 0F01ROFT007COV 79.00
01/20/2016 16:05
KING COUNTY, WA
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
CITY CLERK'S OFFICE
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98057
DECLARATION OF COVENANT
FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS
Grantor: Scott Donogh Homes, Inc t-1' Jp J(, Com 2iki )
Grantee: City of Renton
Legal Description:
HILLMANS LK WN GARDEN OF EDEN # 1 28 & E 40 FT OF
29 & POR VAC ALLEY ADJ
Additional Legal(s)on:
Assessor's Tax Parcel ID#:
3342210640
IN CONSIDERATION of the approved City of Renton(check one of the following) 0 residential
building permit, ❑ commercial building permit, ❑ clearing and grading permit, ❑ subdivision permit, or
❑ short subdivision permit for Application File No. LUA/SWP relating to the
real property("Property")described above,the Grantor(s),the owner(s) in fee of that Property, hereby
r
covenants(covenant)with City or Renton, a political subdivision of the state of Washington, that
he/she(they)will observe, consent to, and abide by the conditions and obligations set forth and described
in Paragraphs 1 through 8 below with regard to the Property. Grantor(s)hereby grants(grant),
covenants(covenant), and agrees(agree)as follows:
1. Grantor(s)or his/her(their) successors in interest and assigns("Owners")shall retain, uphold,
and protect the stormwater management devices, features,pathways, limits, and restrictions, known as
flow control best management practices("BMPs"), shown on the approved Flow Control BMP Site Plan
for the Property attached hereto and incorporated herein as Exhibit A.
2. The Owners shall at their own cost,operate,maintain, and keep in good repair,the Property's
BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and
incorporated herein as Exhibit B.
3. City or Renton shall provide at least 30 days written notice to the Owners that entry on the
Property is planned for the inspection of the BMPs. After the 30 days,the Owners shall allow the City of
Renton to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the City,the
Owners may elect to engage a licensed civil engineer registered in the state of Washington who has
expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the
engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen
days of receiving the City's notice of inspection. Within 30 days of giving this notice,the Owners,or the
engineer on behalf of the Owners, shall provide the engineer's report to the City of Renton. If the report
is not provided in a timely manner as specified above,the City of Renton may inspect the BMPs without
further notice.
4. If the City determines from its inspection, or from an engineer's report provided in accordance
with Paragraph 3,that maintenance,repair, restoration,and/or mitigation work is required for the BMPs,
The City shall notify the Owners of the specific maintenance, repair,restoration,and/or mitigation work
(Work)required under RMC 4-6-030. The City shall also set a reasonable deadline for completing the
Work or providing an engineer's report that verifies completion of the Work. After the deadline has
passed, the Owners shall allow the City access to re-inspect the BMPs unless an engineer's report has
been provided verifying completion of the Work. If the work is not completed properly within the time
frame set by the City,the City may initiate an enforcement action. Failure to properly maintain the BMPs
is a violation of RMC 4-6-030 and may subject the Owners to enforcement under the RMC 1-3, including
fines and penalties.
5. Apart from performing routine landscape maintenance,the Owners are hereby required to
obtain written approval from the City or Renton before performing any alterations or modifications to the
BMPs.
6. Any notice or approval required to be given by one party to the other under the provisions of
this Declaration of Covenant shall be effective upon personal delivery to the other party, or after three(3)
days from the date that the notice or approval is mailed with delivery confirmation to the current address
on record with each Party. The parties shall notify each other of any change to their addresses.
7. This Declaration of Covenant is intended to promote the efficient and effective management of
surface water drainage on the Property, and it shall inure to the benefit of all the citizens of the City of
Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be
binding upon Grantor(s), and Grantor's(s')successors in interest and assigns.
8. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City of Renton that is recorded by King County in its real property records.
IN WITNESS WHEREOF,this Declaration of Covenant for the Maintenance and Inspection of
Flow Control BMPs is e ecuted this /1 day of .0.C. r-, -. 20
-4-Pst--) .1.--r-- AUL— itAolt.-42-
4,
41-40gAJAT)- N)-
4/4 i i iir
cOrT TNo / H
' l M / 'GRA/I * 'roperty
jfo
>�
GRANTOR, owner of the Property
STATE OF WASHINGTON )
COUNTY OF KING )ss.
On this day personally appeared before me:
,to m- 'nown to be the individual(s)described in
and who executed the within and foregoing instrument . ,: acknowledged that they signed the same as
their free and voluntary act and deed, for the uses an• •urposes therein stated.
Given under my hand and official •al this day of ,20 .
Printed name
Notary Public in and for the State of Washington,
residing at
My appointment expires
ACKNOWLEDGEMENT
ATTACHED TO and made a part of
State of 4151// ' v
��// ) SS:
County of /II
On 03/ 02�15 , before me personally appeared Stanley Paul Monsef who
executed the within instrument as Attorney in Fact for Scott Donogh Homes, Inc. , and
acknowledged to me that he signed and sealed the same as his free and voluntary act and deed, for
the uses and purposes therein mentioned, and on oath stated that the Power of Attorney authorizing
the execution of this instrument has not been revoked and that the said principal is now living and is
not incompetent.
Given under my hand and official seal the day and year last above written.
/ _/f GENT N
Printed Name: / ffik - i %��� � QiREs`��,,,g�� �� 'I.
Notary Public i the tate ofi: 4 �,,� •
Residing in: � s '' •o �• ���' c2
My Commission Expires: //-7/5-/6. J%a 0 , m
DESIGNER: IMPERVIOUS COVERAGE: BUILDING COVERAGE: PROJECT ADDRESS:
MONSEP DONOGH DESIGN GROUP LLC LOT: 9,587 SF LOT: 9587 SF 1208 N 34th ST. No. Date
• RENO0 NE SUNSET TON, WA 98270 VD STE F WPROPOSED IMPER:PROPOSED ERV:5 2498 SF COVERAGE: 3469 Sr PARCELRENTON, WA#34 8 50 ka:02640 i X obi
CONTACT: PAUL MONSEF LEGAL DESCRIPTION:
• PHONE: (200) 0I 2-8647 yy�� COVERAGE: 45.3% COVERAGE: 36.2 % HILLMANS LK WN GARDEN OF EDEN
EMAIL: paul@monsefdesign.com 3(..MAX: 5,2755 SF • MAX: 50% # 128 E 40 FT OF 29 POR VAC
Ton pet-0 i o JS ALLEY ADJ
I 11
4" PERF PIPE FTG DRAIN
AROUND PERIMETER, TYP 4" D.S. CONNECTED TO pauI mou612-8647
e des,gn.com
4"SOLID PVC PIPE, TYP www.monsefdesign.com
as Cv
i ly
- a�`II"� -� _—>—7Fir1208 N 34TH
:?,, .,, w,zV, ys
\PROPOSED
/3730 SF . ;;.�.,:,
I
l, ,, RESIDENCE ;i ..
GARAGE ' FLOW
'J: 116, CONTROL BMP
.- I , k..2,11.,,..., ""--"11111r...._ �., �. I' SITE PLAN
6" PERF. PIPE WITHIN 2'x 10' I
INFILTRATION TRENCH t [1:— `..
DRIVEWAY
CONNECT ROOF DRAIN —� \<-1To SLOPE\,
SYSTEM TO TYPE I CATCH YARD — EXHIBIT A
—
BASIN, THRU INFILTRATION ,` DRAIN 'ht ,,I�'� �`a
7 %bt,, _
TRENCH, INTO STORM STUB ti* }; ,Z
0 T.o r en =k l ;, rK ,, 15016
EXISTING CATCH BASIN / VitIl 4-1,y
i '; , 1"=30'-0"
RIM:156.19 - - N
NOTE: N.34TH ST , :,:•
-4mrsta�."-
INFILTRATION TRENCHES MUST BE SETBACK AT LEAST 15 FEET FROM d; V :1.],4r ,. ,V4 t,:. ;?g
BUILDING WITH CRAWL SPACE OR BASEMENT ELEVATIONS THAT ARE Lq.-.. .1:;.S='. 2015/12/31
BELOW THE OVERFLOW POINT OF THE INFILTRATION SYSTEM
0' 15' 30' 90'
DECLARATION OF COVENANT
EXHIBIT B
RESTRICTIVE FOOTPRINT MAINTENANCE INSTRUCTIONS
Your property contains a stormwater management flow control BMP (best management practice)
known as"restricted footprint," the practice of restricting the amount of impervious surface that may be
added to a property so as to minimize the stormwater runoff impacts caused by impervious surface.The
total impervious surface on your property may not exceed 5,275 square feet without written approval
from the City of Renton.
PERFORATED PIPE CONNECTION MAINTENANCE INSTRUCTIONS
This lot contains stormwater management flow control BMP (best management practice) called a
"perforated pipe connection," which was installed to reduce the stormwater runoff impacts of some or
all of the impervious surface on your property. A perforated pipe connection is a length of drainage
conveyance pipe with holes in the bottom, designed to "leak" runoff, conveyed by the pipe, into a gravel
filled trench where it can be soaked into the surrounding soil. The connection is intended to provide
opportunity for infiltration of any runoff that is being conveyed from an impervious surface (usually a
roof) to a local drainage system such as a ditch or roadway pipe system.
The size and composition of the perforated pipe connection as depicted by the flow control BMP site
plan and design details must be maintained and may not be changed without written approval from the
City of Renton. The soil overtop of the perforated portion of the system must not be compacted or
covered with impervious materials.