Loading...
HomeMy WebLinkAboutContract � Washington State Local Agency greement Supplement AI Department of Transportation Supplement Al&ber / Agency Federal Aid Project Number City of Renton �- P-STPUL-TA96(268) Date Agreement Number March 27,2000 LA 3894 The Local Agency of City of Renton desires to supplement the agreement entered into and executed on 03/17/98 as identified above. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Project Description Name East Valley Road Rehabilitation Length 1.01 miles Termini SW 41st Street to 43rd Avenue SW Description of Work Remove existing asphalt on portions of East Valley Road,and at intersection of SW 43rd Street;replace with concrete pavement panels,grind remaining asphalt pavement;overlay with two(2)and three(3)inch thick structural matrix asphalt(SMA). Reason for Supplement Additional funding of$200,000 received from Puget Sound Regional Council and an additional$149,711 of NHS funding for a total increase of$349,711. Estimate of Funding Type of Work (1) (2) (3) (4) (5) �/p Previous Supplement Estimated Total Estimated Agency Estimated Agreement/Suppl. Project Funds Funds Federal Funds PE a.Agency Work 8,942.00 11,058.00 20,000.00 11,015.00 8,985.00 6-.Other Consultant 0.00 60,000.00 60,000.00 33,045.00 26,955.00 c.State Services 1,000.00 0.00 1,000.00 551.00 449.00 d.Total PE Cost Estimate(a+b+c) 9,942.00 71,058.00 81,000.00 44,611.00 36,389.00 Right of Way e.Agency Work 0.00 0.00 0.00 0.00 f.Other 0.00 0.00 0.00 0.00 g.State Services 0.00 0.00 0.00 0.00 h.Total R/W Cost Estimate(e+f+g) Construction L Contract 175,431.00 844,569.00 1,020,000.00 561,759.00 458,241.00 j.Other 0.00 0.00 k.Other 0.00 0.00 I.Other 0.00 0.00 m.Total Contract Costs(i+j+k+l) 175,431.00 844,569.00 1,020,000.00 561,759.00 458,241.00 Construction Engineering n.Agency Work 17,000.00 41,000.00 58,000.00 31,943.00 26,057.00 o.Other Testing 0.00 10,000.00 10,000.00 5,507.00 4,493.00 p.State Forces 1,000.00 0.00 1,000.00 551.00 449.00 q.Total Construction Engineering(n+o+p) 18,000.00 51,000.00 69,000.00 38,001.00' 30,999.00 r.Total Construction Cost Estimate(m+q) 193,431.00 895,569.00 1,089,000.00 599,760.00 489,240.00 s.Total Project Cost Estimate (d+h+r) 203,373.00 966,627.00 1,170,000.00 644,371.00 525,629.00 Federal participation in Constrcution Engineering(line q)is limited to 15%of the Total Contract Costs(line m,column 5). The Local Agency further stipulates that pursuant to said Title 23,regulations and policies and procedures,and as a condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions. AGENCY OFFIC WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By Local Agency Official Title Jesse Tanner, Mayor By Assistant Secretary for vans Date Date APR 2 1 2000, DOT Form 140- EF Date Executed Revised 10/9 a Attest: Marll J n,City Cleric