HomeMy WebLinkAboutD-205729IN
ACCUMULATED SEDIMENT
STARTING TO BLOCK CHANNEL
TH VEGETATION FOR ACCESS
REMOVE ACCUMULATED SEDIME
IF NE ED, ONLY AS DIRECTED
BY HAND LABOR, VACTOR, OR ALL EXCAVATOR
BY ENG ER
WORKING FROM TOP OF BA .
ORDINARY HIGH
ISOLATE K AREA WITH
WATER LINE
TEMPO RY FILTER FABRIC,
(TYPICAL)
PLAS SHEETING, AND
E S BAGS, AS NEEDED
TOP OF BA
Ii
- -� --"_ __
TO8F
ioal
BOULDER
wm
ICAL CHANNEL CLEANING DETAIL
NTS
DETAILS NOT USED THIS YEAR
TREES AND
TOP OF
BANK
THIN VEGETATION,
AS DIRECTED BY
ENGINEER
REMOVE ACC'
SEDIMENT
Typically 3 to 5
TYPICAL SECTION E -E
(LOOKING UPSTREAM)
EX. TREES AND
SHRUBS
TEMPORARY BERM
APPROX. 1 TO 1.5 FT HIGH
FROM SANDBAGS, PLASTIC
6HEETING, FILTER FABRIC,
WAT DEPTH VAF
�' 6" (TYPICAL)
- �•�'� --,__ OH OBI
WIDTH VARIES
6' TO 6 TYPICAL
D
1 ft deep
ADJUST BOULDER
LOCATIONS. IF NEEDED
HANNEL CLEANING CROSS — SECTION
NTS
RECOMMENDED
FOR APPROVAL
BY Daniel Carey 6/30/11
BY
REMOVE GRASS AND SEDIMENT
BY HAND LABOR IN AREA IDENTIFIED BY
ENGINEER
-4'
0
GRAVELCHANNEL
BOTTOM
PLACE TEMPORARY
STAKES AND FILTER FABRIC
FENCE AROUND WORK AREA
GOLF COURSE
FAIRWAY
PROVIDE TEMP NET OR SHIELD
TO PROTECT WORKERS FROM
GOLF BALLS. MIN 5' HIGH
R2 — SEDIMENT AND GRASS REMOVAL (TYP)
NTS
NOTES
CITY MAY ADJUST, ADD OR REMOVE, SEDIMENT AND VEGETATION
CLEANING AREAS 1S U '__D_.Ill
NO.
REVISION
oNAwx
DC
BY I DATE I APPR I -PR—R
RS
WEST ACCESS ROAD
APPX EL 115.17
I V J . V _
108.0 —.. Q
107.0 —....
30 MIL PVC 8" PERF. -L
BASIN LINER DRAIN PIPE
TYPICAL SECTION THRU MIDDLE OF SEDIMENT BASIN WEST —EAST
(NTS, VERTICAL DISTORTED)
D- 205129
2011 Cleaning
9A�
Dt9eB CITY OF
HOW20MP1 NfD 1981/1901
AS NOTED �% �- MAPLEWOOD CREEK SEDIMENT BASIN nmDOM 09
` RENTON CLEANING & MAINTENANCE PROJECT
ONE INCH DATUM li ovAAwxc No
Rs ATWLLSC 0 Planning/Building/Public Works Dept. DETAILS 5
li NOi ONE INLX
SCA1£ ACCOHOINOLY
sHEEr: oP:5
x
�I 0 IDI-1210 171 1