Loading...
HomeMy WebLinkAboutD-2057210 N N I �l. o ww a > �o 'r a auOr o r7 BOULDER CLUS S °ICAL) A NOTE D , GRAVEL REPLACEMENT AREA (TYPICAL) PLACE APPROX. 1 TO 2 CY OF CLEAN GRAVEL SEE SECTION VIEW EX. ROOT LOG / f 0 u DETAIL 1 - GRAVEL PLACEMENT NOT USED FOR 2009 ,'it1,,f�:1R y �� WEST BANK GRAVEL REPLACEMENT .. 6' THICK ( APPROX.) 1 TO 2 CY OF CLEAN GRAVEL NTS WATER 2" TO 6" OHWL EX.TREES 0 O GRAI (TYPI PLAC OF C SEE; 0 EX. LOG DROP (TYPICAL) 'EL REPLACEMENT AREA DAL) E APPROX. 1 TO 2 CY .EAN GRAVEL ;ECT10N VIEW ,o ¢~ I DETAIL 2 - GRAVEL PLACEMENT NTS NOTE D - CONTRACTOR MAY NEED TO REMOVE AFFIX S to 4' WIDTH OF SHRUBS If BLACKBERRIES TO ACCESS CREEK AT EACH LOCATION. REVIEW ANY CLEARING WITH THE CITY BEFORE PROCEEDING. DO NOT CUT DOWN TREES. EAST BANK ORIGINAL GRAVEL LAYER APPROX. 12 "THICK VARIES ERODED GRAVEL LEVEL TYPICAL ( APPROX.) GRAVEL REPLACEMENT SPEC. GR EL PLACEMENT IN HIGH FLOW AREA FROM S IMENT 1. G VEL SHALL BE PLACED ABOVE THE BASIN TO FLOW SPUTTER WA Y LINE ON THE WEST BANK OF THE SIZE Percent Finer by ight CREE MACHINE. 12"- 9" 1100-700/16 2. GRAVEL HALL BE SPREAD BY HAND 9" -6 70-40% SHOVEL ER THE WIDTH OF THE CREEK. 6" - 3" 40-200 3. THE CITY Y REVIEW AND ADJUST <1" 2 /o GRAVEL PLA MENT AS NEEDED FOR 114" % EACH LOCATI DETAIL 1 TYPICAL SECTION A -A NTS 1 VjFW INCREASED HIGH FLOW GRAVEL SIZE 5/22/08 RECOMMENDED FOR APPROVAL By Daniel Carey 6/11/09 BY POOL 18"- 24" DEEP DO NOT FILL POOL WITH GRAVEL EX. LOG DROPS WITH FLOW NOTCH FLOW OHWL K4 Q i4 �v C9 to LENGTH VARIES WATER DEPTH VARIES S TO 6' TYPICAL /_4" TO 6" (TYPICAL) °� wnina: ruw ,em �rzarrtx: ""° var /,ee, ORIGINAL GRAVEL LAYER 6/10/09 12" THICK EX. LARGE 5' ERODED GRAVEL LEVEL RIP -RAP LONG ( APPROX.) GRAVEL REPLACEMENT 6" THICK ( APPROX) 1 TO 2 CY OF CLEAN GRAVEL GRAVEL REPLACEMENT SPEC. GRAVEL PLACEMENT IN LOW FLOW AREA 1. ONLY SMALL SOFT TIRED VEHICLES SHALL BELOW FLOW SPUTTER * DELIVER GRAVEL ON GOLF COURSE SIZE Percent Finer by Weight (SUCH AS BOBCATS, GOLF CARTS, WHEEL BARROWS) 4" 100-75% 2, GRAVEL SHALL BE PLACED AT TOP OF WEST BANK ONLY. 2" 75-30% 3. GRAVEL SHALL BE CARRIED DOWN BANK IN BUCKETS 1" 30- 0% AND SPREAD BY HAND SHOVEL OVER THE WIDTH #10 0% OF THE CREEK. 4. THE CITY MAY REVIEW AND ADJUST GRAVEL PLACEMENT AS NEEDED FOR EACH LOCATION. DETAIL 2 TYPICAL SECTION B -B NTS DC QC / RS NO. REVISION BY DATE APPR ^P""" _ 18TH TET IRRIG -_ _ Scale: 1 Inch = 10 Feet NO MACHINE ACCESS, ON THIS SIDE / �S •, S Qom/ CONSTRUCT TEMP SANDBAG AND PLASTIC BERM TO DIVERT FLOW AWAY FROM CLEANING AREA FILTER FABRIC AT ENTRANCE / IF NEEDED — \ ( MAPLEWOOD CREEK CHANNEL ALLOWABLE ACCESS TO SPLITTEF FOR SEDIMENT REMOVAL RESTORE BANK AFTER CLEANING i Lill ACCESS TO SPUTTER ON THIS {; h RESTORE BANK R CLEANING. i x REMOVE ACCUMULAT SEDIMENT APPROX 2 TO 3 FEET DEEP i SEE 1996 PLANS FOR FLOW SPUTTER I DETAILS AND CROSS- SECTION I OVERFLOW CHANNEL (DRY) DETAIL 3 - FLOW SPLITTER CLEANING (NTS) WEST ACCESS ROAD 30 MIL PVC- -/ 8" PERF.J BASIN LINER DRAIN PIPE TYPICAL SECTION THRU MIDDLE OF POND, WEST -EAST V M L V, I L (NTS, VERTICAL DISTORTED) 2009 C I ea n i n g AS NOTED wnina: ruw ,em �rzarrtx: ""° var /,ee, S� CITY 01 C 6/10/09 osww Fl L 9NE IF Atli MR scuE ♦owim y � R EN TON DATUM MAPLEWOOD CREEK SEDIMENT BASIN CLEANING &MAINTENANCE PROJECT P Planning /Building /Public Works Dept. DETAILS � x aF, 5