Loading...
HomeMy WebLinkAboutD-205719L0 C\I 18TH TEE 88:2 N 69.9 x x 67.1 71.1 x FLOW SPLI ER S R CTURE � x &2 Scale: 1 Inch = 40 Feet 72.0 n ACCESS TO CREEK _ ONLY FROM WEST SIDE a 74.7 U 68.9 x TA x �- c qT ZZ - - -- �qry ��- 6 x 70.6 71:1 68.9 F� 7 "1.9 0 12TH V9 REMOVE SEDIMENT AND 74.2 A u Z GREEN dry TALL GRASS. ABOUT 3 TO 5 �QQ��C 0 SF EACH LOCATION, 69.5 CITY MAY ADJUST, ADD OR REMOVE, SEDIMENT 9:1 AS DIRECTED BY ENGINEER a. cgRr AND VEGETATION CLEANING AREAS AS NEEDED. A { V9 _ '' �'� 'dry ! I0.7 �- V9 i \ 74.3 77.7 ( ao V9 %� FAIRWAY CROSSING 70.3 V4 REMOVE BRANCHES, ROOTS 71 x i 59,3 x .5 V3 REMOVE BRANCHES 0 / x x 7/ N x x V9 70 4y V9 REMOVE SEDIMENT AND V2 REMOVE BR CHES X 6 9. 6 /R� TALL GRASS. ABOUT 3 TO SF EACH LOCATION, 5 V2 DD GRAVEL ` '1 Cq�T i" . x AS DIRECTED BY ENGINEER V9 .j73,2 x p 2 x ti \, V3 REMOVE BRANCHES x 71.5 vs 7 7 7 72.. L x .6 x V9 % 5 X 0.1 x FAIRWAY CROSSING VEGETATION MAINTENANCE NOTES 2009 71.2 71.2 73.3 x MAPLEWOOD CREEK _ x 1. CITY MAY ADJUST GRAVEL PLACEMENT, MAIN CHANNEL LOCATIONS, AMOUNTS, AND VEGETATION 72,5 REMOVAL AND TRIMMING, AS NEEDED. 71.5 R Q V1 REMOVE ABOUT 2 FOOT SECTION x 7 M 5 6g 71 2 7 2.6 TH OF B -INCH DIA ROOTS IN CREEK. A4 E GREEN 7 77 0 V �<<�) V2 REMOVE ABOUT 6 TO 10 3" BRANCHES, 7� ADD ABOUT 1 CY GRAVEL. 705(q X V3 REMOVE SMALL BRANCHES, AS DIRECTED. 70.5 x 71.9 x 68' x 72. 72.4 V4 REMOVE ROOTS, BRANCHES, 77.7 x ABOUT 3'X2' SECTION. 71.6 V9 REMOVE SEDIMENT AND TALL GRASS, x EACH LOCATION. 73. 78.0 I NOTES LIMITED SEDIMENT AND SHRUB REMOVAL ALONG MAIN CHANNEL 1. CONSTRUCTION SHALL NOT INTERFERE WITH GOLF COURSE AND PARKING LOT USE EXCEPT FOR CLEANING FLOW SPUTTER, AND AS NOTED. 2. ONLY SMALL SOFT TIRED VEHICLES MAY BE USED WEST OF THE FLOW SPUTTER. 3. DEBRIS AND BRUSH REMOVAL LOCATIONS WILL BE ADJUSTED BY THE CITY. D= 205119 J.8 Q° �ofWASN," 2009 Cleaning RECOMMENDED FOR APPROVAL q� y q O 4,t¢ O.A..�7STEP 6�a�' �S IONALkN `9"" N49 a'� �,,,g AS NOTED '�OX1"" ""0 t89�188' DC Al N- CITY OF w 6/10/09 MAPLEWOOD GREEK SEDIMENT BASIN 4tyr�y i wi REN TON P By Daniel Carey. 6/11/09 - o�mES tMt &^�� °"""" Dc 0NERN DATUM 1 CLEANING & MAINTENANCE PROJECT �„w„ . BY DC / Rs m Plan nin Buildin Public Works Dept. 9/ e/ P • MAIN CHANNEL NO. REVISION BY DATE APPR � S sim: x 5 D -2057