Loading...
HomeMy WebLinkAboutD-205712Lid N r r N U) N C O a ,q D I N O m U 0 0 0 0 N 0 0 a 0 O N f r N z d I+- U Lil J LJ FLOW SPUTTER CLEANING H L WORK DRAWING NOTES 1. CONSTRUCTION SHALL NOT INTERFERE WITH GOLF COURSE AND PARKING LOT USE EXCEPT FOR CLEANING FLOW SPLITTER, AND AS NOTED. 2. ONLY SMALL SOFT TIRED VEHICLES MAY BE USED WEST OF THE FLOW SPLITTER. 3. DEBRIS AND BRUSH REMOVAL LOCATIONS MAY BE ADJUSTED BY THE CITY. 4. GRAVEL PLACEMENT LOCATIONS AND AMOUNTS MAY BE ADJUSTED BY THE CITY. RECOMMENDED FOR APPROVAL BY Daniel Carey 5/22/07 BY ORIGINAL PLANS STAMPED BY: RONALD J. STRAKA ON:5/23' PE #29727 EXPIRES: 10/16/07 I1w REVISION t 1 SURVEYED: DESIGNED: DC DRAWN: DC CHECKED: DC / RS APPROVED: RS SCALE: AS NOTED Ij --ONNEE INCH Al T FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY SEDIMENT BASIN CLEANING DRAINING A 007 b go N O J 9 b r r 0 0 d r� x d H td Y n O z a C n y c