HomeMy WebLinkAboutD-349706rn
M
N
IS
°LATE COVERING UPPER
1ALF OF INLET
M4011
1I,
36" CMP INLET IN BASIN
NTS
BOX CULVERT OVERFLOW CROSS - SECTION
(As Measured) NTS
t. -------- - - - - -- `
LOG DROPS -
120_
PIPE E7 16 �\ REMOV
IE =121.1 est 3 OR TO 1 \ ��
HAND
DO NO
r
BOTTOM OF BASIN
\ APPX. EL 113 \ I r USE S
_ SEDIME
DOWN Tl ISN E \ j I ,` SEDIME
LY
` \ /
l =
24 "CMP BYPASS PIPE
LOCATION NOT VERIFIED
C �G N
120 0
rn 0
O
\ HYDR EED A D STRAW MULCH
ISTUR D SL E AND ACCESS ROAD
A ER B IN CL NING
12'x3' CONS. BOX CULVERT
OVERFLOW SPILLWAY
IF = 117.86 rr
\ /
/ r
24 "CMP BY ASS PIPE '
LOCATION OT VERIFIED t �� 36" CMP INLET
IE = 115.81
HYDROSEED AREA (approx) - REVIEW EXTENT WITH CITY BEFORE APPLYING
/I "
RECOMMENDED
FOR APPROVAL
By Daniel Carey 6/30/11
BY
7„
CROSS - SECTION A -A SEDIMENT BASIN (Typical)
NTS
OHW
DEPTH APPROX
2 TO 4 INCHES
FLOW
CHANNEL
BOTTOM
114 4' WO.iw • ..R u_. '_.
SANDBAGS
TO SEAL EDGES
AND ANCHOR PLASTIC
F -
PLASTIC SHEETING
TO SEAL DAM
EXISTING INLET —
AND BYPASS PIPE
(IN FOREGROUND)
—2'
1
—2' TO 3'
CONCRETE BLOCKS, MEDIA BAGS,
OR OTHER MATERIAL TO FORM
BYPASS DAM
SECTION - TEMPORARY BYPASS DAM (Typical)
NTS
D- 349106 2011 Cleaning
�Eancu: xsw �seO
MdiQOMN: tU9 1983I1!i91 1
oEE�GNEO: AS NOTED �p �= CITY OF
°° RENTON
OMWN:
DC L� ONE INCH DATUM
OEMEF,OC / RS Al �"�s�"` Panning /Building /Public Works Dept.
IF Nor ONE INCH
N0. REVISION BY DATE APPR -,EO O: N. ..F.ING11
RS
E IIf • -. 111
CLEANING PROJECT
DETAILS
momI
6/30/11
FlEl➢BOON:
PAGE:
oiuxvNG No:
2
SAM or: 2
x
7
EAST ACCESS ROAD
WEST SIDE
APPX EL 122
126 -
-126
124 —
ACCUMULATED SEDIMENT
—124
DEPTH VARIES
122 -
--
/
�1V
-122
120 -
2H Typ.
-120
118 -
-118
116 -
-116
114—
24" CMP �
..' .... ... _....
-.:. ; - ..
; -.
—114
112—
BYPASS PIPE
LOG UNK
.: ...
R IP RAP LAYER
— 1 1 2
I
ry1 —FOOT THICK
110-
—110
BASIN BOTTOM
APEX EL 113
CROSS - SECTION A -A SEDIMENT BASIN (Typical)
NTS
OHW
DEPTH APPROX
2 TO 4 INCHES
FLOW
CHANNEL
BOTTOM
114 4' WO.iw • ..R u_. '_.
SANDBAGS
TO SEAL EDGES
AND ANCHOR PLASTIC
F -
PLASTIC SHEETING
TO SEAL DAM
EXISTING INLET —
AND BYPASS PIPE
(IN FOREGROUND)
—2'
1
—2' TO 3'
CONCRETE BLOCKS, MEDIA BAGS,
OR OTHER MATERIAL TO FORM
BYPASS DAM
SECTION - TEMPORARY BYPASS DAM (Typical)
NTS
D- 349106 2011 Cleaning
�Eancu: xsw �seO
MdiQOMN: tU9 1983I1!i91 1
oEE�GNEO: AS NOTED �p �= CITY OF
°° RENTON
OMWN:
DC L� ONE INCH DATUM
OEMEF,OC / RS Al �"�s�"` Panning /Building /Public Works Dept.
IF Nor ONE INCH
N0. REVISION BY DATE APPR -,EO O: N. ..F.ING11
RS
E IIf • -. 111
CLEANING PROJECT
DETAILS
momI
6/30/11
FlEl➢BOON:
PAGE:
oiuxvNG No:
2
SAM or: 2
x
7