Loading...
HomeMy WebLinkAboutW-034802S G G P E OF �) lG R, K SCOPE OF WORK Check Lest of items to be Performed "Under This Contract This list shall refer the Contractor to the general locations of work to be performed and shall not be interpreted as a conplete and /or descriptive list of all work to be performed under this Contract. (Refer to the._...rlete sit of Drawings, Specifications, and General Notes, as well as the Base. Bid b Alternates for detailed informatloA and possible e`fect on this work). The letter designations below are keyed to the site plan at right- The number designations are either keyed to site plan or make general reference to Items of work to be performed. AREA I - ALONG MAPLE WAY " .A paved "Parking Lot" to include all parking and roadway-areas shown shaded (Base Bid). B. A paved ' "Walk' system to include all walks and related areas_ shown shaded and not specifically ireluded in the "Parking Lot ". (Alternate No. 7). C. Restroom Building" (Base Bid). D. 'Picnic Shelter flo. I" (.Include in Base Bid - See Alternate No,: -13)• E. Access to new paved parking lot. , F. Cosuct a drainage Swale. - Sannitatrry sewer system servicing restroom building and picnic shelter No 1. (include in Base Bid -See Alternate N13)• N. Water service to restroom bui- lding, picnic shelter No. 1 and Landscaping irrigation system... (include in Base Did - See Alternate #13)• I. "Landscaping and Irrigation" as shown on L l and L-2. (Base Bid) d.. Strip all remaining existing sod material from within limits of work area and remove from site; prepare existing topsoil per specifications. (Base Bid) (Verify extent of sod material at site). K. Accomplish all clearing and earthwork required to complete the work described and /or indicated In the drawings and specifications. (Base Bid), L. Site lighting - shown on E -Z (.Base Bid). AREA II - ALONG CEDAR ROVER (INCLUDING PICNIC SHELTER NO. 2) AA. A " - Paved Walk" system to include a_- wal s- -and related areas shown shaded, (Include in Base See Alternate k7). BB. "Carco Theatre" without Lobby. (Base Bid) CC. "Carco Theatre Lobby ", (Alternate No. l) (See sheetsA-il, A-12 and related mechanical and electrical) DD. 'Picnic Shelter No. 2" (located approximately 200 feet west of Area No. Id) (Alternate No. 3). . EE. An "Observation Area" at top of river bank (Alternate No. 14). FF. Two "benches' along walk at rivers edge. (Alternate No. 14) -. GG. Sanitary sewer service to Carco Theatre (Base Bid). -- 1H. Water service cyst - to Ca :rco Theatre landseape L i-t and flre Contrnl= (Base Bid) i1. Water service to Picnic Shelter No. 2 from Carco Theatre (Alternate No. 3) J3- Storn sewer system in vicinity of Carco Theatre and contributing site (Area iI:) drainage. (Base Bid -See Drawing A -4. Kt:. Removal ofexisting manhole casting and cover, contri- buting catch basin, and altering of system, LL.. P ewer - 'servr a to Carco Theatre, Picnic Shelter No. 2, and new site lighting (Refer to drawings E -1, E-2, Base Bid o Alternates No, 11 No. 3 and No. 10) MM,. "Landscaping and irrigation" as shown on -L -I and L -2.. (Base Bid - See Alternates No. 8 and 9). NN. Accomplish all grading and flill ng necessary to complete the work described and /or indicated In the drawings and specifications. (Base Bid) - GENERAL NOTES _ 7.; Base line for improvement layout. 2. Provide a Pluss -h trensF tion between: new paved walks at north side of "Area it develoonent and the existing parking dot paving. The intent is to have the top of the paved walk Base Course nearly flush with the existing finish grade the walk shall be constructed, however, in a straight and uniform manner, (Verify any problems in this e and with architect). 9 )• 3: Brea out the exist, nd concrete sidewalk and curb at eas *. entrance; to new parkins lot in Area f Adjust grades for 'smooth transition from new to existing work. ;Install riew concrete curb on radii shown (match existing) and patch concrete walks. .Provide asphalt paving for a complete installation (noted as "E" on Plan). ❑ u paved areas) fo 4 ra�ide aemooth arddr drivable surface of Course material as -. :s deified for a eas ,.,r temporary ar ( P R ) P r Y access from west end of new paved parking lot; "Area 1". to existing parking to west. 5, Picnic Shelter No. 2 has the following differences from,, that of Picnic Shelter No. l: No sanitary sewer service required, no drinking fountain, concrete stepping block, or sink will to provided in "concrete cooktop table ". The block out for dr1 nking fountain and sink shall not be made. In lieu of this deletion, there shall be provided at this shelter, the metered hose bib - drinking fountain combination shown in Detail 13, Sheet A -2 -d its related metal grate and sump. - .,. T he are rage w a le called for in Item 'F" above shall be constructed with max. 10:1 site slopes and 0.755 min. slope. Start at center of paved driveway at west end of parking lot and extend outside boundaries of project as shown All v.aik, shall be 6­0` side with min. 5 ft. radii at all intersecting walks, unless noted othe- •,.ise. Construct walkswith no dips, mounds or sharp breaks. All walks to be crowned for positive drainage to edges. v A 1 light poles for walkway lighting shall be placed by approved direct burial 'means to min. depth of 3' -6" for mounting ht. pole. c Refer to detail 4!" 1 `or construction of benches along river noted in Item "FF" shove. 10. Provide a gradual transition of finish grades In all areas from those existing to those indicated by the drawings, unless specifically shown or noted otherwise then verify with Architect. f Lect Y if. 'The Contractor. shill take spec iaicace in the final finish grading and contouring. of all areas within 20 ft, of the outside edge of the caved walks which encompass the "Carco Theatre ". The intent is to have a very uniform "sculptured and terraced" land shapiay Cna:fges in elevation in these areas shall be very uniform and almost abrupt as depicted, partially in the elevations on Sheet 6 r ny clarification, the contractor p p p y _ e A For any c t shall contact the architect prior to �amencing with this portion of ^rk. 12. All lawn areas shall slope away from building or other im.,rovements - unless specifically noted otherwise on drawings, then verify with architect. Finish .ode the park to and "Areas i and 11' %.s required n i win i >. grade p g t q to. ac wplish elevations io s hai,n on drawings. SITE UT!1_111ES - AREA I 117�-Provide six b", inch concrete sewer to restroom building from existing sanitary sewer. (Connection per 'City o` Rentc•n standards). See.plan .Sheet A -3 for connection to Restroom Building (noted as "G" on plan). 15. Provide or (4 ") inch concrete sewer to Picnic Shelter No, 1 (provide 4" C.I. under all slabs). 16. Provide fzur (4') inch C.I. water main to Restroom Building, (See plan Sheet A-3 for ccnnection, noted as H" on pis n). - 17. Provide 6' x6'x4' cut -in tee with 4" gate valve, valve box and 21" meter box and meter yoke (meter furnished and - installed ry City of Renton). 18. Provide 3/4" gals. steel pipe water service to picnic shelter No. 1, with, 3/4" gate valve,valve box and 4'x4 "x3/4" tee at new 4'' C.i. service to restroom building. - - 15. Provide 21" gate valve, valve box and 4'x,4'x21" tee to 4" C. I. service to Restroom Sul (ding. (For irrigation supply). 20. Existing local sanitary sewer. SITE UTILITIES - AREA If 21.. Provide four 47 inch sewer service from 4" C.i at yarco Theatre Extend service to existing Metro 42" trunk sewer northeasterly as sham (connection per Section 8-8 Sheet M-1) (Noted as 'KK" or. plan) 22. Provide six (6") inch CJ. water service from existing 6" main to easterly side of Carco Theatre complete with o gale vale valve box and b cut -in tee at connect ionto main, (See plan Shee. ,: -�.4 for cenrect ion to Carco Theatre). (N zo ec as `HP" on plan.) 23, axi 42' Metro sewer (see Sheet A-14 for connection to Carco'Theatre). 24. Provide eight (8'') inch concrete pipe storm sewer (with gasketed joints) relocated m:;nhole at north boundary of protect to daylight out all at Cedar River. (Noted as "l1M' on plan). 25. Provide 48" sq. ft. x b deep manhole - Olympic foundry #'5814 with grate. 26. Provide six (6'') inch concrete pipe from existing catch basin to new catch basin. 27. 'rovide graystone gi5 catch basin +with C.I. cover and extens ionrind as required. Ccnnect to new 8" concrete storm sewer, to river. 2t�, Provide one(! ") inch aaly. steel pipe water service from valve box at west side of Carco Theatre basement to Picnic Shelter No. 2 (Noted as il" on plan). 29. See Plan Sheet A-4 for storm drainage system in vicinity of Carco Theatre. Provide connection to 8" sewer at manhole, as shown. 10.. Remove and salvage casting and cover fro. existing manhole (remove manhole and fill v;ith compacted pit -run or fill manhole. with pea gravel), Plug existing sewers from 'contributing catch basins. (Noted as "KK" on plan). 31. All metal casting grates and catch basin covers are to be asphalt coated 32, For ail intent and purposes, each c +f the four (4) individual building_= o, structures involved in this "Stage i Oeielop.-.ient" cf t`,;, project has been layed out about its oirr centerline. in most cases, only one-half of the s *true �u res have been dimens ior.ed. The contractor shall assume that all :pork is syrrr.-.trical about this center- line an-' only 'eviates where specific'1 ly shown. The contractor shall ask for a clam[ «; -ation of any deviation h c,F, `a, c -,c_r prior to .,xroencind oio.,, involved ,ith this item. - _ �, i- � /� 1 � � - ✓ -_ � rat - / / \ -Y -1 eg��^ I / 2 swaLc 0 PICNIC SHELTER No. 2 DD 0 9 CF �a \ P- oA OBSERVATIDstd AREA no. I \ FL,AC -E. 6LYMPIG -,-1, C.. Vo is1z �N'te M.^„1117C FLAr' V/ LVE ON Ca" LIQS 0- 1r0 . - - - - FF AREA U I 57MIll Se.A OVTFAa L ELEV, 25.4 O O. \ CALICO THTR n v's a ,K11.E. �l. AA �GEN ErLAL .IM ITS OF CQH ?RRC.T - '.L'7F'2&.i LINE DE�!ELO Cit'IECiT of N CON r2ACiTS r C -I 2 - � rp 1 \ _ RESTR09A. i 1 I Q3 BUILDING a 4111 6 1T /7 + AREA I J v 4 0 i 000, G m. PICNIC a P� {` o SHELTER I iI 23 \/ C\ l sT< mac/ a 1�b 1TF_ F L �, ~' I: ?LA 0 CAT TF?c -"A2 CO T ,r AME .V iT- r i H i QI O ; r ° i d o I Yi � I i �\ IJ r u cl �I 4 \ I ®2 - --- 5l�`'dg�DO�'Ni ?¢OVGr-rY Llt�'c E'J DRAWN BY DATE I SITE PLAN CHECKED BY PAVING PLAN, PROJECT CHECKLIST AJtICRO APPROVED BY CEDAR RIVER PARK °Y CIF RElii °7!17 ?Ai3!t A N C'.�CRFiTtCi :'b 0E?'t1RTAENr a X ti. m: v I O I � I s! �I f ho �i off; r Ci I IE �� r 9 Tr I