HomeMy WebLinkAboutW-035003J
2�:: L It ",_ __/ i / 11 1-- I_ V V
111150 L4t-JION AIX; NC—'
M V. ly�p
_7A 113,,.3 -
7 A, 5 f
T 7re_- 0v 7i
T P TA
7 7 7 T TV,17 r-
7AL "d
r 7-
T`r- c7'
45 61: r
4, V
1+
5'
K
- (FL I I — A� 1 1 L_
Fm
A Dffice, Lciian8r4 I
G Units
100,
2.1
CJ
CD _JtA V _,C0 Z 0
OD 4
0 4N
< ------
UD
C;
lz Uyl
12 Units
la unit!. a', metr 8 Units Meier _ Meter
Z" M.+., 2,
1 47
p", C
I E
7-
LP,6
NOTES I. Al I cons tr6c t "on on water main shalt
inset City-of Renton Standards:
2, Property subject to hook-on 4:1l,arges,
along Union Avenue. (Total chzlrgef,,
$726.97)
I+-_ ...F 3 ` dov water qo!A :frodl
ie
Finish road grade , e, (See apprbve.d Road
Profiles)
4. Contractor shEll varify all existing
- utilities in the field.
5. Contractor shall notify trigineer -a
minimum o{ 48 hours in advance of all
request a for staking, testing, or
F "! Spec t zon S�
6. City crews will make, all tie-ins to
existing mains.
7 A4;'7 7. Lines to be tested wi th temocri7�at �y
i tf
caps /plugs and approved by C , of
Renton before connecting to exi.Sthig
lines.
B. , Locations of hydrants and taps will
be veri , fled in'the field.
9. Sbadeu areas about pipeline re'0re66n t
P the watier,.easrements
7' L
F, ;,J
A D I\ r n r'-Q
ei
V A I- Iv ES CF,.
7z /A L
r
,x
jjj -5 7-A C, 7,--: :5 7-4, 7-1 f ( hF 11�k T
Ti�
7Fe:5 If A
6 TE7 VAi "VE r., I% TV 7 4'
T V 7-A TA
T" T Y;�'
If = NI
7 F
-3
46,
y 7 —�,-7--
T.
6— CONSULTING ENGINEERS
7"
'y
V �1( T1 r
v --rD
N(D
J M-11PHILIP M. BOTCH & ASSOMTES, INC.
2 k VP v, LO 71021 112th N.E. BELLEVUE, WASHINGTON 98004
�VAPUAPI_E LC11GTJ1?') :0
V.
DRING. NO_�;1-20 3 7
V</
2' S,z S Ic
RAWN;J T 1_11ZE._J
CITY OF RENTON
DEPARTMENT OF ENGINEERING
E TO 7 rF F�
ED
ML.
DAT�
DRAWN.
CHECKED_�____
NO. REVISION $Y A.,Pn. CATE A P P R 0 V E 0 — - -
SHEET OF