Loading...
HomeMy WebLinkAboutW-036726aC llp_ S-r47"6A' /"5 FL XF,) _A-- IA-V- V, MOIL -" S7yE 28 "I�okrN of cu F Cs 41 5. 3RD 5T WAT ------------ -------------------- ------ --------- IT A/"W /2 "D./ W, -5T --------------- 12 t2X— ' . 7-E '_VF: � l"7_ )cA-r!oN # AW REVISION ASBUILT 08-09-72 00J O.A.B. P1porz-cr 8 -1-102 (/8) CITY OF RENTON ENGINEERING DEPARTMENT W-36723 .CENTRAL BU51AIE55 D15TRICT 5. 3RD _5T FROM 5HATTUCK TO RAIMI-IR AVE- 5_ DESIGNED W- DATE 05­02-19 ;52 FILE NO- DRAWN __!�D G.D.W. CHECKED All..11ED sHEEr-�oFr" 7:Z ------------ 57.4. /'g'� 6"C Z r Zlla A9 7'le IN 70 E.N. IV97Z*179 Ilv -IF I A -5TA7-10,V 1t65 _1'l&_Ila. 111A*15 /kylw/yz�mm STYLE of 6" 67,97ZI JIAZ. I/,f (F LX S-r47"6A' /"5 FL XF,) _A-- IA-V- V, MOIL -" S7yE 28 "I�okrN of cu F Cs 41 5. 3RD 5T WAT ------------ -------------------- ------ --------- IT A/"W /2 "D./ W, -5T --------------- 12 t2X— ' . 7-E '_VF: � l"7_ )cA-r!oN # AW REVISION ASBUILT 08-09-72 00J O.A.B. P1porz-cr 8 -1-102 (/8) CITY OF RENTON ENGINEERING DEPARTMENT W-36723 .CENTRAL BU51AIE55 D15TRICT 5. 3RD _5T FROM 5HATTUCK TO RAIMI-IR AVE- 5_ DESIGNED W- DATE 05­02-19 ;52 FILE NO- DRAWN __!�D G.D.W. CHECKED All..11ED sHEEr-�oFr"