HomeMy WebLinkAboutS-045701VALLEY VILLA
CONVALESEN T CENT
CUT � CAP EXIST Si PE
sEWEIz vuP,!LV-, F-)0 SIT 5:�7 K ft #-7
9111 EL -- 14(,O *-
],a: _ 13i:1
AVJU5T F M TO 05W
S . PF WN-1 _ c4WE
QJ U WCTIOU EX� -
V - =
zo
.15
THE SWAT! ISON LAW OFFIC
8
o i EXIST WATERMETEK
AI E SERVILE ADJUST
.n TO SEW ~1kll5NEPG*k
R1M ELEV' Lgy_�j SIDE SF_WE K 9' 20
I.E, 14i a Q I 5TU E7 - FLu EP'
IJE FIE a(!I
ELF H- PRIG. -iS'OD
lHU
N
l
TALBOT ROAD
�6
-I-
MH #8,48 "d) 5SM�.
19, =
J 11 J U QCT101J 13aX G 5AC K
ChLAW ARou11D (iY 0
ZC4-00)F-\AdlY
-t7n
-WEW Co' COLIC, SIDEWALK,
CUK& y GUTTEK cv
I%z1140 SCHEV WG
RIff1EC7 COIIf7llIT.
W _
r
PLAN - SANITARY SEWERLI'NE EXTENSION
SCALE: 1"= 20'
m
I u. CIRAPE
PROPERTY'
LI IJ E °-
�! I16 =j�lr.
Co' e
"` 0 SIDE. SEWER
L —
S
rl-
r
8AG TEE
8'° !AU [ -IAI�Y sinE SEWER
z,EWER
DETAIL- SIDE SEWER CONN.
(SCALE: `O SCALE )
GENERAL NOTES
1) ALL WORK AND MATERIALS FURNISHED UNDER TFIIS CONTRACT SHALL BE
IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS.
2) SPECII'ICATIONS FOR ALL PIPING, MANHOLES AND INSTALLATION AND
INSPECTION SHALL MEET THE REQUIREMENTS OF THE CITY OF RENTON.
3) MANHOLE STEPS WHERE REQUIRED SHALL CONFORM WITH APWA SECT. 63
4) ALL STEEL PARTS AND SURFACES MUST BE GALVANIZED AND COATED
WITH ASPHALT TREATMENT 1 OR BETTER.
5) BEDDING TO BE PEA GRAVEL 6" UNDER TO 6" OVER THE PIPE.
BACKFILL TO BE APWA CLASS B. COMPACTIO14 TO BE IN ACCORDANCE
WITH APWA STANDARDS FOR MECHANICAL COMPACTION OF PIPE BACKFILL.
6) REFER TO THE CITY OF RENTON STANDARD SEWER DETAILS FOR TYPICAL
NOTES AND DETAILS AND TO THE "REGULATIONS AND STANDARDS FOR
CONSTRUCTION OF EXTENSIONS TO THE CITY WATER AND SANITARY
SEWER SYSTEM ".
7) THE CONTRACTOR SHALL OBTAIN A STREET BREAK PERMIT FOR THE WORK
REQUIRED IN THE ROAD RIGHT -OF -WAY.
8) THE CONTRACTOR SHALL CONTACT A LOCATOR SERVICE TO LOCATE AND
VERIFY ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
EXISTING UNDERGROUND UTILITIES EXIST, BUT EXACT LOCATIONS ARE
UNKNOWN, CARE IS TO BE TO AVOID DAMAGE OF UTILITIES
THAT ARE TO BE RETAINED THE CONTRACTOR SHALL BE RESPONSIBLE
FOR REPAIR OF ANY UTILITIES DAMAGED.
9) THE CONTRACTOR SHALL MAINTAIN A SET OF PLANS, RED MARKING ALL
EXISTING UTILITIES ENCOUNTERED AND CHANGES OF LOCATION OR
ELEVATION OF THE SYSTEM BEING INSTALLED. FORWARD THIS MARKED
UP SET TO THE ENGINEER UPON COMPLETION OF THE PROJECT.
10) CONTACT THE ENGINEER IN THE EVENT OF ANY DISCREPENCIES PRIOR
TO MAKING ANY CHANGES.
11) THE CONTRACTOR MAY BE REQUIRED TO TV INSPECT THE SEWER LINE
IF SO DIRECTED BY THE PUBLIC WORKS REPRESENTATIVE.
12) A PRECONSTRUCTION MEETING WITH PUBLIC WORKS IS REQUIRED.