Loading...
HomeMy WebLinkAboutW-044501SOUTH SECTION CON 71PACTOR TO REM011F ,F '-,,5-i0BETWEEN 51TZcDl. Mn I (.j 5 , - X 12 7 MliD R F1,1v 5 TA_) /_ T I � - ; P, 1 P/l P, 77f t) 7- PV _F W 71E-YN 5 T14 0 F70 TEwp I?q` BLOW OF-, -2"TAP plaw Orr- w ut IRE RECD STA - Ottvlo PE-W 711L PIPE -21 LIP. ?'I" -To' )3ENZ) (M T) 29 `Dl PIPE - 20 L - F, 2'" BTFLY VALVE OITYI'117) 211" Di PIP., - 2r"­are tTH- 13(,asq IW EA . ........... ------- ------ --------- J�l SCALE 1 " =40' z STP 207 TfUSTALL 7rMP 2Y"b7CAD WJN 2 "TAP�Bioo 0FF EM) e 27 UPON C(_110�C77,-A) OF 1 6-,-T,1vL- lgr.6OVF PLUS- +BLOWOFF TIE-10 TH,5 CvvNLtTrJN „x io I-r- -2.v,' DI Pfpc- C/) r) ?q'Cr AT TIME C31P NEB`' CovNFCTldll REmove F-x VA-Cs , p1pr , ZEtjoS > A 3/4-6 .43I -rG2. So In 70 M t COUP4,1vo �rofz #T STA -045?, rn S IV. 0 UIVI-1,5-- ALL SPRINGBROOK RD. AQ307- U71L/71-`5 A 32-16 1 -00`, (045 7,5/-, EXIST. r2 RD Ek otoo (AB AND .) /4� '7Z? ­ , I Lj � EX. 11 g)A `SW c P 7-4 7= 1 L RIW I G ,q Pl 11VAT1_-,81V411V co In IAJ .n a ,,. — `i 0 - � _._� - -_.�� ,. ! �. 6� d, 'i.... �' V l % � � � L"�,.� / �Sfy> �."o'� -�. ;' M BEGIN pR ZrMT 5 Tq p -Z, TER P/pr- so > UZI m `I - -1 Da Q, .to IL >e, 1 -�{��b 0� O A 0 cz: STA. 024 NEW 2-/%, 12-" Trr (Mu x f-Z) 51� 1I Oil NFw jl,`G,V,(Fi_xMT) -,' NEk) 12"VAVLr A .3��50- CONNECT TO EX /2- DS, /Yhj/O � CONN l VIA wk) 12' PT. rjs A,�q'.b NEW 12' SOLID sl.rBv,5- (Auy_'A) )-v INSTALLATION NOTES OLD INT. STA.0+00 ey CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES NOW STA 6408.68 121_,��3 C11-Y A—EMW126 AVERAGE DEPTH OF COVER IS 4' ON 16 "& 24" AND FIRE HYDRANTS CONTRACTOR SHALL SUPPLY ALL TEMPORARY FITTINGS FOR TESTING AS BUILT PRESSURE TEST SHALL BE 200 PSI CITY OF R E N T O N CONTRACTOR WILL MAKE FINAL TIE-INS DEPARTMENT OF ENGINEERING _EX. METERS WILL BE RECONNECTED TO NEW MAIN AFTER TIE-INS THE EX. MAINS 8 SERVICES MUST REMAIN IN SERVICE W-445 -ALL THREE TIE-INS SHALL BE MADE AT SAME TIME SPRINGBROOK RD. TRUNK -ONLY ONE SHUT DOWN ALLOWED ON EACH SECTION FOR TIE -INS AS BUILT DRAWING RK 3-X-8o DATE DEC 1975 FfLE NO.-- DRAWN 372/403 CHECKED SCALE 1 40' -1. .—AG, N0. REVISION 9Y APPR.I DATE APPROVED SHEET -l-OF- 2- cl-�/i 0 NEW 1 342 LF -el"DX, CTIT) .-wD pRojEcr : 7b -Of52 (AB AND .) /4� '7Z? ­ , I Lj � EX. 11 g)A `SW c P 7-4 7= 1 L RIW I G ,q Pl 11VAT1_-,81V411V co In IAJ .n a ,,. — `i 0 - � _._� - -_.�� ,. ! �. 6� d, 'i.... �' V l % � � � L"�,.� / �Sfy> �."o'� -�. ;' M BEGIN pR ZrMT 5 Tq p -Z, TER P/pr- so > UZI m `I - -1 Da Q, .to IL >e, 1 -�{��b 0� O A 0 cz: STA. 024 NEW 2-/%, 12-" Trr (Mu x f-Z) 51� 1I Oil NFw jl,`G,V,(Fi_xMT) -,' NEk) 12"VAVLr A .3��50- CONNECT TO EX /2- DS, /Yhj/O � CONN l VIA wk) 12' PT. rjs A,�q'.b NEW 12' SOLID sl.rBv,5- (Auy_'A) )-v INSTALLATION NOTES OLD INT. STA.0+00 ey CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES NOW STA 6408.68 121_,��3 C11-Y A—EMW126 AVERAGE DEPTH OF COVER IS 4' ON 16 "& 24" AND FIRE HYDRANTS CONTRACTOR SHALL SUPPLY ALL TEMPORARY FITTINGS FOR TESTING AS BUILT PRESSURE TEST SHALL BE 200 PSI CITY OF R E N T O N CONTRACTOR WILL MAKE FINAL TIE-INS DEPARTMENT OF ENGINEERING _EX. METERS WILL BE RECONNECTED TO NEW MAIN AFTER TIE-INS THE EX. MAINS 8 SERVICES MUST REMAIN IN SERVICE W-445 -ALL THREE TIE-INS SHALL BE MADE AT SAME TIME SPRINGBROOK RD. TRUNK -ONLY ONE SHUT DOWN ALLOWED ON EACH SECTION FOR TIE -INS AS BUILT DRAWING RK 3-X-8o DATE DEC 1975 FfLE NO.-- DRAWN 372/403 CHECKED SCALE 1 40' -1. .—AG, N0. REVISION 9Y APPR.I DATE APPROVED SHEET -l-OF- 2-