Loading...
HomeMy WebLinkAboutW-048502! � 3 Fi iii r 0 I .n RY R y SP 7i= e i 7NSlacL d -t,t tstr Ln /N167 t* 13' -8' U 50L/D 6�� AFTS,4 W4T6K Md/N �' /ST //�/(T P.4RiSlNG 16 AFAM a -BY G7Y' OF 6t 3 i 4r I EXIS %/Neer 7 �EaS E'er TX�BLCY7 - GENERAL NOTES 1. All work materials shalt be in conformance with the standards and specifica- tions of the City of Renton Utility Department and the latest edition of the -- APYA. Standards. and Specifications. -2. All locations of existing utilities-shown am approximate and it shall be the ..... ........ - - - rl contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 3. All water main pipe to be cement tined ductile iron pips conforming to ANSI °`C" Spec's A -21 -51 -1976 or latest revision, thickness Class 62_ Cement mortar -' r E -� -.� Lining and seal coating shall conform to PASS A -21 -4-74 or latest revision. . Pipe joints to be Mush -or, or mechanical joint. Bedding to be Class C. 4. All fittings to be cast iron, cement lured. Class 250, unless otherwise - specified on drawing conforming to ANSI Spec. A- 21- 104477, ANSI A -21 -11 -1977 or Iatest revision. All fitting joints to be mechanical joint or fianged. �ngp�gFA Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be - - f25 76. configuration, unless otherwise: specified on drawing. LiSPHL\LT /�urvcT _ - S. Inches be main nish grad and welter to maintain 12 in a stand l rger cover shall 36 Inches below finish grade. All rater main l2 fnebes and larger shall be at -. a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. - 6. All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washington State Health 1- lfi7O�!�iJ✓ ..Department.. A11. pressure. testing .shall be done in the presence of a repre- sentative of the City of Renton. 7. A preconstruction conference and twenty-four hour notice will be required prior to starting new con struction. 8. Itshall be the contractor's responsibility to secure al' necessary permits 3 prior to starting construction. 9. Installation of corporate stops, water services. lines and meters to be i 4 16 +30 accomplished by the City of Renton. $ °G( 22Hz'86YD (MJxMJ) -f 10. All connection to existing mains to be accomplished by the City of Renton. '_ , �+! ._.. -- /NJT& B°G_1. CdP aQ All necessary excavation and materials to be supplied by the contractor and '9- /a-/-?Z- ( MW OrP -O Z" Foci be on -site prior to City ratification. 'j 8`C.f- 22� °C�YD(t�/ AfJ) Her 7a7JfP B'-IX�Y -A`F dSSY - - 574 /O+/6 it / 17. Inspection will be accomplished by a representative of the City of Renton. AWM777M& 8'- 6Y(3xF2j It shall be the contractor's responsibility to notify the Utility Department "I -dL CV ft-.x�r`fJ L 24 hours in advance of backfilting all construction. 8`G -/- aSGUD r.7LL'Et'E MJi 1 D2ivE4t/AY �Y,' 4W 2`Vl c�2a 12. Contractor to provide plugs a:rl tWrorary blow-off assemblies for testing -. 4nd purity acceptance prior. to .final tie -in. f I26N !2W E �k-SST /N6 /L"G /P bT J /AJ S7 '17 . RV NO S /OE BY CLENT �✓� 2>,eo/Y i0iVSE1©- CigsrAi.&ASSOC. , INC. 5)Y6ZtT DEVEtoPME PROJECT &T A/ af6VN ,tee �� - INFO LAND SURVEYORS 40cJSOUTH 3rd AVENUE DRAWN BY scuE RENT, WASHINGTON 98032 (208) 854 -2043 A ROVED R 46 GATE ",ydY /9�3 "loe