Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutW-048502! � 3
Fi iii r 0
I .n RY
R y SP 7i= e
i
7NSlacL d -t,t tstr Ln
/N167 t* 13' -8' U 50L/D
6�� AFTS,4 W4T6K Md/N �' /ST //�/(T P.4RiSlNG
16 AFAM a -BY G7Y' OF
6t
3 i 4r I EXIS %/Neer 7 �EaS E'er TX�BLCY7
- GENERAL NOTES
1. All work materials shalt be in conformance with the standards and specifica-
tions of the City of Renton Utility Department and the latest edition of the --
APYA. Standards. and Specifications.
-2. All locations of existing utilities-shown am approximate and it shall be the ..... ........ - - - rl
contractor's responsibility to verify the true and correct location so as to
avoid damage or disturbance.
3. All water main pipe to be cement tined ductile iron pips conforming to ANSI °`C"
Spec's A -21 -51 -1976 or latest revision, thickness Class 62_ Cement mortar -' r E -� -.�
Lining and seal coating shall conform to PASS A -21 -4-74 or latest revision. .
Pipe joints to be Mush -or, or mechanical joint. Bedding to be Class C.
4. All fittings to be cast iron, cement lured. Class 250, unless otherwise
- specified on drawing conforming to ANSI Spec. A- 21- 104477, ANSI A -21 -11 -1977
or Iatest revision. All fitting joints to be mechanical joint or fianged. �ngp�gFA
Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be - -
f25 76. configuration, unless otherwise: specified on drawing. LiSPHL\LT
/�urvcT _
-
S. Inches be main nish grad and welter to maintain 12 in a stand l rger cover shall 36
Inches below finish grade. All rater main l2 fnebes and larger shall be at -.
a minimum of 48 inches below finish grade. Where utility conflicts occur,
water mains are to be lowered to clear. -
6. All water mains shall be pressure tested and disinfected in accordance with
the specifications of the City of Renton and the Washington State Health 1- lfi7O�!�iJ✓
..Department.. A11. pressure. testing .shall be done in the presence of a repre-
sentative of the City of Renton.
7. A preconstruction conference and twenty-four hour notice will be required
prior to starting new con struction.
8. Itshall be the contractor's responsibility to secure al' necessary permits 3
prior to starting construction.
9. Installation of corporate stops, water services. lines and meters to be i 4 16 +30
accomplished by the City of Renton. $ °G( 22Hz'86YD (MJxMJ) -f
10. All connection to existing mains to be accomplished by the City of Renton. '_ , �+! ._.. -- /NJT& B°G_1. CdP aQ
All necessary excavation and materials to be supplied by the contractor and '9- /a-/-?Z- ( MW OrP -O Z" Foci
be on -site prior to City ratification. 'j 8`C.f- 22� °C�YD(t�/ AfJ) Her 7a7JfP B'-IX�Y -A`F dSSY - -
574 /O+/6 it /
17. Inspection will be accomplished by a representative of the City of Renton. AWM777M& 8'- 6Y(3xF2j
It shall be the contractor's responsibility to notify the Utility Department "I -dL CV ft-.x�r`fJ L
24 hours in advance of backfilting all construction. 8`G -/- aSGUD r.7LL'Et'E MJi 1 D2ivE4t/AY
�Y,' 4W 2`Vl c�2a
12. Contractor to provide plugs a:rl tWrorary blow-off assemblies for testing
-. 4nd purity acceptance prior. to .final tie -in. f I26N !2W
E �k-SST /N6 /L"G /P
bT
J /AJ S7
'17
. RV NO S /OE BY
CLENT �✓� 2>,eo/Y i0iVSE1©- CigsrAi.&ASSOC. , INC. 5)Y6ZtT
DEVEtoPME PROJECT &T A/ af6VN ,tee ��
-
INFO LAND SURVEYORS
40cJSOUTH 3rd AVENUE
DRAWN BY scuE
RENT, WASHINGTON 98032
(208) 854 -2043 A ROVED R 46 GATE ",ydY /9�3 "loe