Loading...
HomeMy WebLinkAboutW-048901CONTACT PERSONNEL MECHANICAL JOINT AGENCY NAME NUMBER CITY OF RENTON ENGINEERING RON OLSEN 235 -2631 RH2 ENGINEERING RICK HARBERT 453 -0241 CONCRETE IN SECTION RANDY ASPLUND LANDSCAPE DETAILS - RENTON BUILDING DEPARTMENT FOUNDATION PLAN 235 -2540 RENTON FIRE DEPARTMENT 235 -2643 FIRST AID RESERVOIR STRUCTURAL DETAILS 811 SEATTLE CITY LIGHT 11 625 -3000 PACIFIC NORTHWEST BELL TELEMETRY AND ELECTRICAL DETAILS 345-8972 W.rK- Z�- - 0489 GENERAL NOTES 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE APWA STANDARDS AND SPECIFICATIONS. 2. A PRECONSTRUCTION CONFERENCE AND TWENTY -FOUR HOUR NOTICE WILL BE RE- QUIRED PRIOR TO STARTING NEW CONSTRUCTION 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 4. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF THE DRAWINGS, SPECIFICATIONS, AW WA DIOO.79 INCLUDING APPENDICES A AND C, AND A.W.S. D5.2 -79. 5. INSPECTION: CONCRETE CONSTRUCTION AND STRUCTURALSTEEL ERECTION SHALL BE SUPERVISED IN ACCORDANCE WITH SECTION 306 OF THE UNIFORM BUILDING CODE AND THE PROJECT SPECIFICATIONS BY A QUALIFIED TESTING AGENCY DESIG- NATED BY THE ENGINEER. THE ENGINEER SHALL BE FURNISHED WITH COPIES OF ALL TEST RESULTS. 6. SHOP DRAWINGS FOR REINFORCING STEEL AND STRUCTURAL STEEL SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO FABRICAMON OFTHESE ITEMS. 7. CONCRETE PROTECTION( COVER) FOR REINFORCING STEELSHALL BEAS FOLLOWS: FOOTINGS AND OTHER UNIFORMED SURFACES, EARTH FACE .... 3- FORMED SURFACES EXPOSED TO EARTH (LE. WALLS BELOW GROUND) OR WEATHER (#6 BARS OR LARGER) .... 2' ( #5 BARS OR SMALLER) ....1 -1'h' MECHANICAL JOINT 1 �6 2 FLANGE COUPLING 3 .w 4 GATE VALVE LAKE WASHINGTON CONCRETE IN SECTION 6 LANDSCAPE DETAILS REINFORCING STEEL FOUNDATION PLAN PROJECT LOCATION 12" INLET /OUTLET, 12" OVERFLOW m � a 9 RESERVOIR STRUCTURAL DETAILS 10 RESERVOIR STRUCTURAL DETAILS 11 LADDER, STAIR AND LANDING DETAILS 12 TELEMETRY AND ELECTRICAL DETAILS cq VA LEY RENTON ix SOUTH 9 a TENTER £ 4 U 0 4 e < 5 Y m A VICINITY MAP W.rK- Z�- - 0489 GENERAL NOTES 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE APWA STANDARDS AND SPECIFICATIONS. 2. A PRECONSTRUCTION CONFERENCE AND TWENTY -FOUR HOUR NOTICE WILL BE RE- QUIRED PRIOR TO STARTING NEW CONSTRUCTION 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 4. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF THE DRAWINGS, SPECIFICATIONS, AW WA DIOO.79 INCLUDING APPENDICES A AND C, AND A.W.S. D5.2 -79. 5. INSPECTION: CONCRETE CONSTRUCTION AND STRUCTURALSTEEL ERECTION SHALL BE SUPERVISED IN ACCORDANCE WITH SECTION 306 OF THE UNIFORM BUILDING CODE AND THE PROJECT SPECIFICATIONS BY A QUALIFIED TESTING AGENCY DESIG- NATED BY THE ENGINEER. THE ENGINEER SHALL BE FURNISHED WITH COPIES OF ALL TEST RESULTS. 6. SHOP DRAWINGS FOR REINFORCING STEEL AND STRUCTURAL STEEL SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO FABRICAMON OFTHESE ITEMS. 7. CONCRETE PROTECTION( COVER) FOR REINFORCING STEELSHALL BEAS FOLLOWS: FOOTINGS AND OTHER UNIFORMED SURFACES, EARTH FACE .... 3- FORMED SURFACES EXPOSED TO EARTH (LE. WALLS BELOW GROUND) OR WEATHER (#6 BARS OR LARGER) .... 2' ( #5 BARS OR SMALLER) ....1 -1'h' STANDARD SYMBOLS S. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE WORK. 9. CONTRACTOR - INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT. 10. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE ARCHITECT AND THE STRUCTURAL ENGINEER. 11. DESIGN CRITERIA: ... ROOF LIVE LOAD .. ............................... 25 PSF ... WIND ....................................... 100 MPH ...EARTHQUAKE ................................... ZONE 3 ... x ALLOWABLE SOIL PRESSURE ............ 7,0W PSF NATURAL SOILS ...... ............................... OR COMPACTED FILL) xREFER TO "SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING DESIGN STUDY, PROPOSED WEST HILL RESERVOIR AND BOOSTER STATION, RENTON, WASHINGTON" DATED AUGUST 24, 1983 AND PREPARED BY HART CROWSER & ASSOCIATES, INC. REVISED TO C)DNFQRM TO STRUCMN RECORDS �s ATE i I DIMMITT MIDDLE W SCHOOL < > a z m CHURCH :o RESERVOIR S. 126TH ST. EASEMENT FRqM \) RENTON SCHOOL D RICT� I I L CATIO MAP DETAIL OR SECTION REFERENCE TAKEN FROM SHOWN ON SHEET SHEET DETAIL SHT. NO. MECHANICAL JOINT 1 FLANGE JOINT 2 FLANGE COUPLING 3 ADAPTER 4 GATE VALVE 5 CONCRETE IN SECTION 6 LANDSCAPE DETAILS REINFORCING STEEL FOUNDATION PLAN IN CONCRETE STANDARD SYMBOLS S. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE WORK. 9. CONTRACTOR - INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT. 10. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL BY THE ARCHITECT AND THE STRUCTURAL ENGINEER. 11. DESIGN CRITERIA: ... ROOF LIVE LOAD .. ............................... 25 PSF ... WIND ....................................... 100 MPH ...EARTHQUAKE ................................... ZONE 3 ... x ALLOWABLE SOIL PRESSURE ............ 7,0W PSF NATURAL SOILS ...... ............................... OR COMPACTED FILL) xREFER TO "SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING DESIGN STUDY, PROPOSED WEST HILL RESERVOIR AND BOOSTER STATION, RENTON, WASHINGTON" DATED AUGUST 24, 1983 AND PREPARED BY HART CROWSER & ASSOCIATES, INC. REVISED TO C)DNFQRM TO STRUCMN RECORDS �s ATE i I DIMMITT MIDDLE W SCHOOL < > a z m CHURCH :o RESERVOIR S. 126TH ST. EASEMENT FRqM \) RENTON SCHOOL D RICT� I I L CATIO MAP DETAIL OR SECTION REFERENCE TAKEN FROM SHOWN ON SHEET SHEET DETAIL SHT. NO. TITLE 1 COVER SHEET 2 INFORMATION SHEET 3 GRADING AND SITE PLAN 4 UTILITIES PLAN 5 LANDSCAPE PLAN 6 LANDSCAPE DETAILS 7 FOUNDATION PLAN 8 12" INLET /OUTLET, 12" OVERFLOW AND DRAIN DETAILS 9 RESERVOIR STRUCTURAL DETAILS 10 RESERVOIR STRUCTURAL DETAILS 11 LADDER, STAIR AND LANDING DETAILS 12 TELEMETRY AND ELECTRICAL DETAILS RK,— AWEENDED "COhwEsL,_-o REC PS�d t D FOR APPROVAL F;Aq APPROVAL FOR APPROVA_ Fok. AFIM VAL W- 489 2�ra ✓ear 4y 7,�iyecynraf}- uoi°c/�yfs ATE INDEX TO SHEETS