HomeMy WebLinkAboutW-048903ROUND SOLID LOCKING LID
/ iGROUND ELEVATION = 392.0'
STANDARD GALV. C.B. LADDER STEPS �. ; . , OVERFLOW ELEVATION = 390.5'
CHAIN 200 LB. CAPACITY, + , �-
SLACK WHEN GATE IS DOWN. fI
WELD CHAIN TO C.B. FRAME
CLEANOUT G:-:TE
LIFT TYPE, SELF - LOCKING
CASCADE CULVERT INC. { f - GROUT
#C /C /1 -LG OR EQUAL
12"CMP OUT
I.E. 03865, I 1 �` I.E. = 386.5
NOTE: SEE PLAN VIEW FOR PROPER I" .� I, -_____--13A" ORIFICE DIA.
ORIENTATION OF 18" DETENTION PIPES
12" CUP (OUT)
DAYLIGHT PIPE AT
PROPERTY LINE FOR --
DISCHARGE INTO NATURAL
DRAINAGE CHANNEL
ELEVATION
PLAN
PIPE (IN)
IOVIDE SOLID LOCKING LID
:R KING COUNTY STANDARDS
,DDER
18" CMP DETENTION PIPE(IN)
CONTROL MANHOLE
NTS 4
WTK- 24- 0.89
gm
Engineedno
NO. I REVISIONS I BY I APPR. I DATE I PC I RLA I RHH I NTS I 11/15/84 1 4A
r �`
EROSION /SEDIMENTATION CONTROL NOTES
1. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRE-
10. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES,
SERVATION AS PRESCRIBED ON THE PLAN SHALL BE
WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK
CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING
TO A DEPTH OF ONE FOOT. ROCK AGGREGATE TO BE AS
CONSTRUCTION.
FOLLOWS:
2. ALL REQUIRED SEDIMENTATIONIEROSION CONTROL
'h'- 2"- 10% - 20%
FACILITIES MUST BE CONSTRUCTED AND IN OPERATION
2"- 4"- 201/6 - 401/6
PRIOR TO LAND CLEARING AND /OR OTHER CONSTRUCTION
4" - 8"- 40% - 701/6
TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER
11. STRUCTURES SHALL NOT BE PERMrTTED WITHIN 10' OF
THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND
THE SPRING LINE OF ANY STORM DRAINAGE PIPE(S), OR
SEDIMENT FACILITIES SHALL BE MAINTAINED INA SATISFAC-
15' FROM THE TOP OF ANY CHANNEL BANK.
TORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR
CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON-
92. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED
SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAIN-
ACCORDING TO THE APPROVED PLANS WHICH ARE ON FILE
TENANCE, REPLACEMENT AND ADDITIONS TO EROSION
IN THE DEPARTMENT OF PUBLIC WORKS CENTRAL RE-
SEDIMENTATION CONTROL SYSTEMS SHALL BE THE
CORDS. ANY DEVIATION FROM THE APPROVED PLANS WILL
RESPONSIBILITY OF THE PERMITTEE.
REQUIRE WRITTEN APPROVAL FROM THE PROPER
3. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS
AGENCY, CURRENTLY THE KING COUNTY DEPARTMENT OF
DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
PUBLIC WORKS.
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS.
13. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB
AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR
SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHOULD
14. PRIOR TO ANY CONSTRUCTION/DEVELOPMENT ACTIVITY
ANTICIPATE THAT MORE EROSION AND SEDIMENTATION
THE KING COUNTY DEPARTMENT OF PUBLIC WORKS
CONTROL FACILITIES WILL BE NECESSARY TO INSURE COM-
DEVELOPMENT INSPECTION SECTION MUST BE CON -
P'ZETE SILTATION CONTROL ON THE PROPOSED SITE.
TACT (PHONE NO. 255 -2531) FOR A PRE -CONSTRUCTION
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE
OBLIGATION AND RESPONSIBILITY OF THE PERMITTEE TO
MEETING.
ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED
15. IN ADDITION TO FULL INSTALLATION OF TEMPORARY ERO-
BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES,
SION AND SEDIMENTATION CONTROL FACILITIES, ALL R/D
OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
FACILITIES , ALL R/D FACILITIES WILL BE INSTALLED AND
NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER
IN OPERATION PRIORTOOR IN CONJUCTION WITHALLCON-
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
STRUCTION ACTIVITY WHENEVER THAT ACTIVITY EXCEEDS
4. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION
THE CAPACITY AND INTENT OF THE ERATION/SEDIMENTA-
CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL
TION CONTROL FACILITIES UNLESS OTHERWISE
OF STORM DRAINAGE DESIGN, SIZE OR LOCATION OF PIPES,
APPROVED BY THE SURFACE WATER MANAGEMENT DIVI-
RESTRICTORS, CHANNELS OR RETENTION FACILITIES.
SION.
S. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION
16. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10
AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A
FEET BELOW PAVEMENT LEVEL.
PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS MUST
17. PER KING COUNTY CODE 20.50.100 SECTION D., THE PER -
BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS
SON REQUIRED TO CONSTRUCT THE FACILITY PURSUANT
PLANTING OR OTHER APPROVED EROSION CONTROL
TO SECTION 20.50.050 SHALL MAINTAIN A LIABILITY POLICY
TREATMENT APPLICABLE TO THE TIME OF YEAR IN DUES-
IN THE AMOUNT OF ONE HUNDRED THOUSAND DOLLARS
TION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY
($100,000) PER INDIVIDUAL, THREE HUNDRED THOUSAND
DURING THE MONTHS OF APRIL THROUGH SEPTEMBER IN-
DOLLARS ($300,000) PER OCCURRENCE AND FIFTY
CLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER
THOUSAND DOLLARS ($50,000) PROPERTY DAMAGE, WHICH
IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST BE
SHALL NAME KING COUNTY AS AN ADDITIONAL INSURED,
AUGMENTED WITH MULCHING, NETTING, OR OTHER TREAT-
AND WHICH SHALL PROTECT KING COUNTY FROM ANY LIA-
MENT APPROVED BY KING COUNTY SURFACE WATER
BILITY UP TO THOSE AMOUNTS FOR ANY ACCIDENT, NEGLI-
MANAGEMENT, OUTSIDE THE SPECIFIED TIME PERIOD.
GENCE, FAILURE OF THE FACILITY, OR ANY OTHER LIABIL-
6. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS
ITY WHATSOEVER, RELATING TO THE CONSTRUCTION OR
WHERE THE DEAD STORAGE DEPTH EXCEEDS 6INCHES, A
MAINTENANCE OF THE FACILITY. PROOF OF SAID LIABILITY
FENCE, A MINIMUM OF 3 FEET HIGH, IS REQUIRED.
POLICY SHALL BE .PROVIDED TO THE DEVELOPMENT
INSPECTION SECTION, 155 MONROE AVE H.E., RENTON, WA
98055 (206 - 255 -2531, OR OPERATOR ASSISTED, ZENITH 5050,
TOLL FREE NUMBER) PRIOR TO SETTING UP A PRE -CON-
TORMWATER DRAINAGE PLAN NOTES
STRUCT10N MEETING, PROVIDED, THAT IN THE CASE OF
FACILITIES ASSUMED BY KING COUNTY FOR MAINTENANCE
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH KING
PURSUANT TO SECTION 20.50.110, SAID LIABILITY POLICY
COUNTY SPECIFICATIONS.
SHALL BE TERMINATED WHEN SAID COUNTY MAINTE-
2. DATUM SHALL BE K.C.A.S. UNLESS OTHERWISE APPROVED
NANCE RESPONSIBILITY COMMENCES.
BY KING COUNTY DEPARTMENT OF PUBLIC WORKS.
18. CATCH BASIN GRATES INSTALLED ON COUNTY RIGHT -0F -
3. ALL SEDIMENTATION/EROSION FACILITIES MUST BE W
WAY SHALL CONFORM TO STANDARD DRAWING NO. 39 OR
AIORTOC SARI
OPERATION PRIOR CLEARING AND BUILDING
NO. 44 WHICH INCLUDES THE STAMPING "OUTFALL TO
U MAINTAINED
TION, AND THEY MUST BE SATISFACTORILY MAINTAINED
STREAM, DUMP NO POLLUTANTS" AND "PROF ERTY OF
UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL
KING COUNTY."
FOR ONSITE EROSION HAS PASSED.
19. OPEN CUT ROAD CROSSING FOR UTILITY TRENCHES ON
4. GALVANIZED STEEL PIPE UTILIZED AS DETENTION
EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED
FACILITIES SHALL HAVE ASPHALT TREATMENT M1 OR
ONLY WITH PEA GRAVEL OR sib" MINUS CRUSHED ROCK
BETTER INSIDE AND OUTSIDE.
AND MECHANICALLY COMPACTED. CUTS INTO THE EXIST -
5. ALL DISTURBED AREAS SHALL BE SEEDED OR STABILIZED
ING ASPHALT SHALL BE NEAT LINE CUT WITH SAW OR
JACKHAMMER IN A CONTINUOUS LINE. A TEMPORARY
BY OTHER SURFACE WATER MANAGEMENT METHODS FOR
COLD MIX PATCH MUST BE PLACED IMMEDIATELY AFTER
THE PREVENTION OF ONSITE EROSION AFTER THE COMPLE-
BACKFILL AND COMPACTION. A PERMANENT HOT MIX
TION OF CONSTRUCTION.
PATCH SHALL BE PLACED WITHIN 30 DAYS AND SHALL BE
6. GRASS SEEDING WILL BE DONE USING AN APPROVED TYPE
THE THICKNESS OF THE ORIGINAL ASPHALT OR TWO
HYDRO - SEEDER, OR AS OTHERWISE APPROVED BY KING
INCHES, WHICHEVER IS GREATER.
COUNTY DEPARTMENT OF PUBLIC WORKS. THE PERFOR-
20. ALL METAL DRIVEWAY CULVERTS WITHIN COUNTY RIGHT -
MANCE BOND WILL NOT BE RELEASED UNTIL THE GRASS
OF -WAY MUST. HAVE CONCRETE OR MASONRY HEADWALLS
HAS BEEN ESTABLISHED, UNLESS OTHERWISE AF PROVED
OF ACCEPTABLE DESIGN.
BY THE KING COUNTY DEPARTMENT OF PUBLIC WORKS.
7. ALL PIPE SHALL BE LAID ON A PROPERLY PRE-
21. UTILITY INSTALLATION PLANS: PLANS SHOWING ALL UN-
PARED FOUNDATION ACCORDING TO WASHINGTON STATE
DERGROUND UTILVES MUST BE PROVIDED TO THE KING
SPEC. 7 -02.3(1). THIS SHALL INCLUDE NECESSARY LEVELING
COUNTY DEPARTMENT OF PUBLIC WORKS DEVELOPMENT
OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION
INSPECTION SECTION, 155 MONROE AVE. N,E., RENTON, WA
MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF
98055 (206 - 255 -2531, OR OPERATOR ASSISTED, TOLL FREE
REQUIRED BEDDING MATERIAL TO UNIFORM ', RADE SO
NUMBER - ZENITH 5050). PLANS FOR WATER AND SANI-
THATTHE ENTIRE LENGTH OFTHE PIPE WILL BESUPPORTED
TARY SEWERS MUST BE PROVIDED PRIOR TO THE PRE -
ON A UNIFORMLY DENSE UNYIELDING BASE. IF THE NATIVE
CONSTRUCTION MEETING. PLANS FOR ALL OTHER
MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE RE-
UTILITIES MUST BE PROVIDED PRIORTOTHE INSTALLATION
QUIREMENTS FOR "GRAVEL BACKFILL FOR PIPE BEDDING"
OF ROAD BASE COURSE MATERIALS. SAID PLANS SHALL
THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED PRO-
SHOW THE LOCATION OF THE MEASURES THAT WILL BE
VIDED THE MATERIAL IN THE BOTTOM OF THE TRENCH IS
TAKEN TO PREVENT SOIL EROSION AND SEDIMENTATION.
LOOSENED, REGRADED AND COMPACTED TO °ORM A
22. CONSTRUCTION OF DEWATERING SYSTEM SHALL BE IN
DENSE UNYIELDING BASE.
ACCORDANCE WITH SECTION 61.9.02 OF THE APWA STAN -
REVISEC TO CONFORM
8. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL
DARD SPECIFICATIONS.
TO C NSTRU ION RECORDS
BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS
OTHERWISE APPROVED THE THE DEPARTMENT OF PUBLIC
1Z 6- S
WORKS.
9. ALL DRAINAGE STRUCTURES NOT ON PUBLIC RIGHT -0F -
WAYS SHALL HAVE ROUND, SOLID LOCKING LIDS, UNLESS
DATE
OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
CITY OF RENTO`:V
WEST HILL RESERV SIR
I I DETAILS
gm
Engineedno
NO. I REVISIONS I BY I APPR. I DATE I PC I RLA I RHH I NTS I 11/15/84 1 4A
r �`