Loading...
HomeMy WebLinkAboutS-051004PROVIDE SMOOTH PENETRATION WITH SLEEVE EXTENDING TO VALVE BOX AT SURFACE ADJUSTABLE STEM GUIDE AT MID - LENGTH STEM COUPLING PRESSURE SLIDE GATE, BOLT TO FLANGE, GROUT BETWEEN FLANGE & WALL FORM CHANNEL TO PROVIDE ROOM FOR SLIDE GATE TO EXISTING 8" DIA. SEWER PIPE FORM SMOOTH SLOPING SEMI - CIRCULAR CHANNEL BOTTOM (TYP.) SLOPE BENCH TO CHANNEL AT 5% MINIMUM .T,.w 11517.1 47L ETA [I 92TIT131i u FIR .s i PRESSURE SLIDE GATE WITH CIRCULAR OPENING, CIRCULAR FLANGE BACK FRAME FOR 125 LBS. DRILLING PATTERN, NON- RISING S.S. STEM, 2" SQUARE OPERATOR NUT AT SURFACE, S.S. RAILS, ASSEMBLY HARDWARE AND FASTENERS, MOUNT PIPE INVERT FLUSH WITH CHANNEL INVERT. EQUAL TO WATERMAN INDUSTRIES RED TOP MODEL P -30. VALVE BOX AT SURFACE, FLUSH WITH ASPHALT REPLACE ASPHALT PAVEMENT SEAT PROPERLY AND PREVENT //� `° '� 1 9 T; ",` /��I LADDER RUNGS ® 12" O.C. (TYP.) �' -III AND TO SAME THICKNESS. WITH 4" MIN. THICKNESS EXISTING 6' DIA. METRO MANHOLE R10 -16 SEWAGE FROM ACCUMULATING I Imo\' ':� �,. � `\ __ I '�^ i � ' - BOLT SLIDE GATE TO THREADED 125 LOS. FLANGE ON 8" DIA. PIPE, IN CHANNEL. I =I /� 4F' 10/09/92 - - -. —.�" ."" " .) CONCRETE RINGS, CAST WITH PROTECT THREADED END OF BOLT FROM BONDING TO GROUT. GROOVE SO THAT SAFETY STEP MORTAR 24" DIA. ACCESS HOLE AND COVER CAN BE FIELD INSTALLED PRECAST ECCENTRIC jo. CONE 48" TO 24" , /i IIIIII GROUT N AROUND PE10PENETRAI NSIO(� MANHOLE ) OR REDUCING SLAB ON STRUCTURAL FILL I —:` / \ 12 OC REMOVE EXISTING SEWER SHALLOW MANHOLE � PRECAST SECTION, PIPE FROMWIIHIN MANHOLE AND FILL END OF PIPE WITH GROUT PROPOSED 8" DIA. D.I. GRAVITY SEWER PIPE A 1 SLUICE GATE CO U01 IN MANHOLE /� III= TO LIFT STATION. SCALE:'" = 2' - 0" � 2',3 OR 4' TALL B SADDLE MANHOLE PROPOSED 8" DIA. D.I. SEWER PIPE Q PLAN VIEW CHANNEL BOTTOM THAT DIRECTS FORCE w W W � w m SCALE: 1" = 1' -0" 60 .. ..w.. w w w ` . _ ... w ............................ . TURBULENCE. Ip SLOPE o+ c n N� FORM SMOOTH SEMI- CIRCULAR CHANNEL 55 ..... ....... .... ..... lav/\O�Qn�M.� - .... .. ............... ..... STABILIZATION MATERIAL TYPICAL y, IF REQUIRED BY ENGINEER CO SCALE: 1" = 2' -0" 50 .F <� o p .............. ..... J� 36" BORE CASING PROVIDE SMOOTH FINISH IN ;s, SEWER CHANNEL. - 45 :.........:.....:.......... : . x_ w x D.I. DIA. ® TOP ELEV. 54.88' z - INV. ELEV. 47.10' (4" INLET) R'Q : ¢ - - EXISTING PAVEMENT SURFACE TOP ELEV.: 54.49' INV. ELEV. 47.02' (8" :OUTLET) 9 > N 73 rn 40 INV. ELEV. 45.04' (8" INLET) INV. ELEV. 43.29' (42" OUTLET) .I 35 ........... NMI r ° l RIVER . 6 SIDE SEWER - EXISTING 8" DIA. SEWER PIPE E T 30 " D1A DJ. 40 TOP ELEV. _ 42.20 TOP ELEV. 42.00' INV. � ELEV. 34.45' ....... .:.... .....: .. ............. ....... ...... ........ .....: - - � � - : - � INV. ELEV.: 341 (8" 1NLET)� .:..- ..:.........:...........EV. .: INV. ELEV.: 32.57' (8" OUTLET) - - DEPTH 10.0' (APPROX.) - - - - 25 SECONDARY CONTAINER � . . . - - TOP ELEV.:41.00' REPLACE ASPHALT PAVEMENT RESTORE PAVEMENT AND TO LIMITS OF DISTURBED AREA AND TO SAME THICKNESS. WITH 4" MIN. THICKNESS EXISTING 6' DIA. METRO MANHOLE R10 -16 e:, -.o0 0 00 -..0. o° �o� oho 24" CLEAR OPENING RING & COVER TOP COURSE, 4" MIN. FINISH GRADE - n In 1 I. I.I ..... I �c ICI I.ItS I T.11 8" MIN TO 20" MAX PRECAST 4F' 10/09/92 - - -. EXISTING 42" DIA. METRO SEWER PIPE CONCRETE RINGS, CAST WITH GROOVE SO THAT SAFETY STEP MORTAR CAN BE FIELD INSTALLED PRECAST ECCENTRIC CONE 48" TO 24" OR REDUCING SLAB ON STRUCTURAL FILL I —:` / \ 12 OC //' --III= SHALLOW MANHOLE � PRECAST SECTION, INSTALL KOR -N -SEAL BOOT AROUND PROPOSED 8" DIA. PIPE. I I Imo; \ /� III= PRECAST BASE 2',3 OR 4' TALL PROPOSED 8" DIA. D.I. SEWER PIPE FORM SMOOTH SLOPING SEMI - CIRCULAR CHANNEL BOTTOM THAT DIRECTS FORCE SPACER -SKID BANDED TO PIPE MAIN DISCHARGE TO GRAVITY PIPE SMOOTHLY AND WITHOUT CREATING = 3.5% TURBULENCE. Ip SLOPE FORM SMOOTH SEMI- CIRCULAR CHANNEL II BOTTOM WITH CLASS D" CONCRETE lav/\O�Qn�M.� FOOTING BEDDING MATERIAL, 6" MIN. STABILIZATION MATERIAL TYPICAL 48" DIA. MANHOLE IF REQUIRED BY ENGINEER CO SCALE: 1" = 2' -0" BOT. ELEV. 24.00 (STRUCTURE) - - DEPTH .17.0' (APPROX.) - - - - - CONNECTION TO INV. ELEV. 3°.95' (8" INLET) 20 D . - ...... .......:....................... . .... . ........:.........:...INV. ELEV. 26.00' (WET WELL) - - ... .........:... CO METRO MANHOLE INV. ELEV. 37.17' (4" OUTLET) 0 -40 0 +00 0 +40 0 +80 1 +20 1 +60 2 +00 2 +40 2 +80 3 +20 SCALE:'" = 2' -D" : REVISED TO CONFORM STATIONING NOTES TO CONSTRUCTION RECORDS ALL STATIONING USED IN THIS PROFILE INDICATE FEET ALONG THE ALIGNMENT OF THE SEWER PIPE. SEWER PROFILE ➢ H.p�� �,/�'� cz xasyrP RH2 ENGINEERING P.S. DATE THE STATIONS AND OFFSETS TO THE STRUCTURES SHOWN ON THE SITE PLAN ARE FOR THE SCALE HuRIZ 1" - 20' -0" RESTORE PAVEMENT AND SUBGRADE WITH SAME MATERIALS AND TO SAME THICKNESS. THE FINISH SURFACE ELEVATION DOES NOT DEVIATE FROM THE EXISTING SURFACE ELEVATION EXISTING 6' DIA. METRO MANHOLE R10 -16 e:, -.o0 0 00 -..0. o° �o� oho ALONG THE ALIGNMENT OF THE SEWER PIPE. SEE THE PROPOSED SITE PLAN FOR CHANGES IN GRADE AROUND THE LIFT STATION AND VAULT.Rec '°n° 6727 +sxx4£ } SIGNED. SIONAL - n In 1 I. I.I ..... I �c ICI I.ItS I T.11 4F' 10/09/92 - - -. EXISTING 42" DIA. METRO SEWER PIPE EXPIRES 8/2/94 FORM SMOOTH SLOPING SEMI - CIRCULAR CHANNEL IN BENCH. CORE DRILL HOLE THROUGH -' MANHOLE FOR KOR -N -SEAL BOOT. as "' � � INSTALL KOR -N -SEAL BOOT AROUND PROPOSED 8" DIA. PIPE. PROPOSED 8" DIA. D.I. SEWER PIPE SPACER -SKID BANDED TO PIPE = 3.5% SLOPE 36" CASING FILLED WITH CDF PLUG EXISTING FORCE MAIN PIPE WITH CONCRETE TO SEAL MANHOLE, PROVIDE SMOOTH FINISH IN SEWER CHANNEL. BOT. ELEV. 24.00 (STRUCTURE) - - DEPTH .17.0' (APPROX.) - - - - - CONNECTION TO INV. ELEV. 3°.95' (8" INLET) 20 D . - ...... .......:....................... . .... . ........:.........:...INV. ELEV. 26.00' (WET WELL) - - ... .........:... CO METRO MANHOLE INV. ELEV. 37.17' (4" OUTLET) 0 -40 0 +00 0 +40 0 +80 1 +20 1 +60 2 +00 2 +40 2 +80 3 +20 SCALE:'" = 2' -D" : REVISED TO CONFORM STATIONING NOTES TO CONSTRUCTION RECORDS ALL STATIONING USED IN THIS PROFILE INDICATE FEET ALONG THE ALIGNMENT OF THE SEWER PIPE. SEWER PROFILE ➢ H.p�� �,/�'� cz xasyrP RH2 ENGINEERING P.S. DATE THE STATIONS AND OFFSETS TO THE STRUCTURES SHOWN ON THE SITE PLAN ARE FOR THE SCALE HuRIZ 1" - 20' -0" j -.s /O SCHEDULE A ONLY IA I I i I I Al I 1 I i I I I Y I I _ — I _ s s I A I 1 IA i 1 I Ii I I I I I SURVEY LAYOUT OF THE STRUCTURES AND DO NOT CORRESPOND TO THE ALIGNMENT ABOVE. THE FINISH SURFACE ELEVATION DOES NOT DEVIATE FROM THE EXISTING SURFACE ELEVATION - ALONG THE ALIGNMENT OF THE SEWER PIPE. SEE THE PROPOSED SITE PLAN FOR CHANGES IN GRADE AROUND THE LIFT STATION AND VAULT.Rec '°n° 6727 +sxx4£ } SIGNED. SIONAL - n In 1 I. I.I ..... I �c ICI I.ItS I T.11 4F' 10/09/92 - - -. I I [ENI It1 I- 01) 1153 I Inn 11.;; \Ilti'I'.S 1 -11t,1 I.,.t 0- 11 EXPIRES 8/2/94 j -.s /O SCHEDULE A ONLY IA I I i I I Al I 1 I i I I I Y I I _ — I _ s s I A I 1 IA i 1 I Ii I I I I I