Loading...
HomeMy WebLinkAboutS-054705POWER BLOCK WALL MOUNT MCI 1 y MC2 3 KVA TRANSFORMER 120V LOAD CENTER LCN \ LCt 20) 20� 20 J 15� 15 20) M1 40 HP M2 40 HP O N 15 J 15 f 20 f 15 / f 20 I 15 / ) i o T PLR CR11 LIGHT SW - �---- °------ - - - - -- - - OTC------- ° - - - -- = -- - - - - -- N D.W. BLOWER - SWITCH 1 - DRY WELL BLOWER - o--- - - - - -- ---- �TC1 l � CRll TC1 W.W. BLOWER ;t z _(Y.E- - - W WEIR - - - - - - - - - - SWITCH � TC2 a o a c J TC2 w a PANEL HEATER a a w a THERMOSTAT w a w CR4 H CR1 0 rMC2 17 RI 13 MCI A I # CR8 3 O.L. _-- -_ - - -- - - --- - -_- -0 MANUAL PSR1 y PRIME 1 PROBES ALT ALTERNATOR SW CR3 0 OFF G -I ALT N ALT KEYSWITCH - INTERLOCK TO PREVENT SIMU'_TANECI,'S H 13 *RTM 20 FUM P OPERATON CR4 0 0 CR2 MC1 A CR 3 O.L. THESE ITEM; ®��a��e���.��e�e� - - - -- PCR3 -e - -�� CN SERVICE PANE' _ �` MANUAL PRIME 2 PROBES KTK15 /' -HESE ITEMS AT 151 CR3 N AU�LAR'( CONTROL PANEL J FU ISR1 ISR2 - cao- - - _"_ - - ALL PUMPS STOP 1ST PUMP ON it r4 KTK15 Ft—joSR4 O— — 3 39 4 iR5 N V±_!LRS 4J 4 �P.B.1 THERMAL RESET CR7 a TD1 4 CR� 4 CRS S N' i1 �rt� HIGH WATER ALARM do \ / R 41 CR6 LOW WATER ALARM 4 \ / R I CR7PJt 4F THERMOTECTOR -- 4 CR8 PUMP R /HIGH T 49 THERMOTECTOR t - * --*- I CR9 piiup 5, N MS R1 I TO PUMP #1 MSRtl 53 �a 4 N MSR2 STO PUMP #2 I MSR2 PSR1 :3 PRIME FAILURE - -� RESET/ 1 59 OF 1 g; P 2 ARY 2 I I P =°� ��e9 ------ ° - - - -- 1 e-- 1 - - - - - -- AUXILIARY CONTROL PANEL MCI MC2 CR5 CR6 CR11 TT 4j TT d d d d 63 64 65 66 67 68 69 70 71 72 62 SVI CR1 I I VACUUM PRIMING CR2 PUMP MOTORS P2 N CR4 L SV� CR4 ISRS Pa —ma! lXe Inc- constitalg angineers I wa E s 4 N 11300 west Emerson Fioce a ea c ; Suite 200 yip �r y 2ND PUMP ON Seattle, woeningtw 913199 (206) 284- 1181 ., s MOLL 180 FR 229, PUMP #1 " REVISIONS: N 1. PROVIDE AUXILIARY CONTROL PANEL TO HOUSE PSR1, PSR2, AR1 AND AR2 RELAYS. 2. INSTALL RELAYS PSR1 AND PSR2 FURNISHED WITH NEW PRIMING SYSTEM. 3. FURNISH AND INSTALL RELAYS AR1, AR2, MANUAL START PUSH BUTTONS, AND PRIME FAILURE RESET PUSHBUTTON IN AUXILIARY CONTROL PANEL 4. REMOVE EXISTING ALARM BELL TEST AND SILENCE PUSHBUTTONS AND N NAMEPLATES. 5. FURNISH & INSTALL THE FOLLOWING ITEMS IN THE EXISTING CONTROL PANEL PUMP #1 PRIME FAILURE LIGHT AND NAMEPLATE PUMP #2 PRIME FAILURE LIGHT AND NAMEPLATE 6. RECONNECT EXISTING RELAYS CR1 AND CR2. 7. MAKE ALL INTERCONNECTIONS BETWEEN EXISTING CONTROL PANEL & AUXILIARY " CONTROL PANEL 8. PROVIDE TERMINAL BLOCKS FOR ALL EXTERIOR CONNECTIONS. 9. REMOVE EXISTING REMOTE ALARM EIGHT AND BELL. 10, REMOVE ALL ABANDONED CONDUIT AND WRING. W PUMP #2 \ R / SEAL / \FAILURE CR1 PUMP #1 PRIME R FAILURE AR1 i Ct---i PUMP !2 PRIME FAILURE ABB REVIATIONS: AM AMMETER CR CONTROL RELAY CT CURRENT TRANSFORMER KVA KILOVOLT AMPERES MC MOTOR STARTER CONTACTOR M MOTOR PER PHASE LOSS RELAY TO TIMER RTM RUNNING TIME METER ALT ALTERNATOR PSR PRIME ISR INTRINSICALLY SAFE RELAY TO TIME DELAY RELAY CB CIRCUIT BREAKER AR ALARM RELAY R RED PILOT PB PUSHBUTTON O.L. OVERLOAD RELAY CONTACT AR1 PUMP 1 PRIME FAILURE ALARM RELAY AR2 PUMP 2 PRIME FAILURE ALARM RELAY SV1 VACUUM PUMP 1 SOLENOID VALVE SV2 VACUUM PUMP 2 SOLENOID VALVE DIAGRAM SYMBOLS: -J'Y THERMAL OVERLOAD UNIT hl O —00 HAND - OFF - AUTO SELECTOR SWITCH ODD 0. p�T ��oF .i SFi�NC�f �J CITY OF RENTON 388 O �Sg'1'IaTFFFpG��`c+ DF PARTM F_uT OF PUBLIC WOI21iS 0' NNA 1, DEVILS ELBOW LIFT BTA RE SCANNED MAR 2 8 2003 P-D BOQ<. PAW SHEET- 3 OF cj 0-