Loading...
HomeMy WebLinkAboutS-055102.1. STA. 2 +00± 344.69 316.36 I QND CONSTRUCTION STA. 2 +40± t MH I , D Z 4 TVA III I ,I LI II G 1 iJ I1 NOTE:4 ELECT. .n �r It: CONDUITS UNDER THE SIDEWALK. MATCH LINE SEE LOWER LEFT j� MATCH LINE SEE UPPER RIGHT 1 NW 7TH STREET SEWER REPAIR - LINE A REFERENCE NOTES lO RECONNECT EXIST. SIDE SEWER AS SHOWN TO NEW 05 CONSTRUCT NEW MANHOLE, CONNECT TO EXISTING 8' HDPE SS, PROVIDE AND INSTALL ALL PIPE, FITTINGS MAIN SEWER WHERE SHOWN. CONNECTIONS ETC. REO'D FOR CONNECTION. O MAINTAIN 12' CLEARANCE AT 16' WATERLINE O CONSTRUCT NEW 8' HDPE SS, CURVED GRAVITY SEWER. OR PROVIDE ETHAFOAM SEPARATOR (6' THICKNESS). OCURVE SEWER PIPE AS REQUIRED TO MATCH GRADES SHOWN OR CLEAR OBSTACLES. 04 CONNECT TO EXISTING MANHOLE AS APPLICABLE, GROUT IN COR -N -SEAL CONNECTOR SIZED TO MATCH SS PIPE (TYPICAL). 0 +00 1 +00 2 +00 8. PROTECT THE EXISTING 16' WATERMAIN FROM DAMAGE DURING CONSTRUCTION. DISRUPTION TO SERVICE WILL NOT BE ALLOWED. SET NEW MANHOLE I o` ��. STA. I�Ilt ....108 .... "; ;% ": X I � ; .: : :. SE N_ SEWER 93 22 T. p ' �+ ...... ;a #:t.. .r ; '.. � .. y 8' HDPE RIPE coNC. ,. �':� ......... ............................:sl i B EG C0NSTF2:UCT`�N .......WALK`.' : ; :::? ) %' :.1N ;i \\ :: $T A', 000.. 10' HDPE PIPE 140 THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE TYPE I TRENCH DETAIL 5. CONTRACTOR SHALL PROVIDE EROSION /SEDIMENTATION CONTROLS TYPE 11 TRENCH DETAIL SCALE: : HOOP ? \ B tm TYPE I TRENCH 1 : CB PROTECTION AND OTHER APPROPRIATE MEASURES. .r.�R .:.. A+ r a ..:: 15 PERMANENT:.. TAM SP R c `._ 'EASEMENT ` • "\ I. 1 A`;: yo 'r; 1 • ` \ 6'4k (CITY OF RENIOId) <:.'. ..............:. FLL 3 \ob • a P \L ; o � DETA IL PROVIDE I' COVER Ln SHEET NOTES BACKLOT SEWER EXTENSION - LINE B MIN. (TY .) x 120 , -- 1 I _ LL 8' CURV D GRAVIT 120 ------------ ' .� HDPE) 3 3 n' 0 W w SLOPE % +' 80 a - z 100 0 J+ Q2 o z � w. 100 x- wtD a— Ha V7 v a >� o, W - --- PROVIDE N ( Z,.. W 60 J o w - - -__ 1' COVER H W L) it LL_ o v1 - - - - -- NCO F. t1 V) MIN. (TYP) Q °-o ou LINE B PROFILE 6 °'U low 80 za mzN z CITY OF NTON X z PIPE ANCHOR F B NW 7TH STREET SEWER REPAIR PROJECT Z TYP.OF 2 L 3 SEWER PLAN AND PROFILE DESIGNED: JEB DATE: 9/30/91 FILE NAME: 6 Q DRAWN: JES CHECKED: JOC N p N — BY APPR. DATE APPROVED: SHEET: 2 OF: 3 ct 60 U ~— + x +IL, o _ 60 wo za c' _ ° F- 8' CURV SEWER D GRAVIT HDPE) "- - - -- - -- - ' m LU V, 4f , 40 'LINE A - PR FILE SLIP JOIN z A COUPLING RECOMMENDED FOR APPROVAL - U '-� 20 PROVIDE ECYCLED o? ?� 0 + +1 z1- -.2 �w w °• CONCRET 5' WIDTH BACKFILL MAX.) V)F-- ti ozNdv - -L� ASTEWATER UTILITY DAT , W <.< i Z O X H'• 11 W U W V) L. SUBMITTED 0 `S 2b72G /�51q/ JOC ENGINE�lR' R. C. E. N0. / D` ATP JAMES M. MONTGOMERY R. C. E. NO. DATE CONSULTING ENGINEERS, INC. MATCH LINE SEE LOWER LEFT 6. PROVIDE BUTT FUSION 'T' FITTING ON 8' HOPE SS PIPE UNDISTURBED HILLSIDE EMBANKMENT AND RESIDENCES. I 1 ! , 7. ALL MAIN SS PIPE SHALL BE 8' OR 10' HOPE SDR 26, AS SHOWN. \ END CONSTRUCTION 8. PROTECT THE EXISTING 16' WATERMAIN FROM DAMAGE DURING CONSTRUCTION. DISRUPTION TO SERVICE WILL NOT BE ALLOWED. SET NEW MANHOLE I o` ��. STA. I�Ilt ....108 .... "; ;% ": X I � ; .: : :. SE N_ SEWER 93 22 T. p ' �+ ...... ;a #:t.. .r ; '.. � .. y N 180 26 E 381. 2� coNC. ,. �':� ......... ............................:sl i B EG C0NSTF2:UCT`�N .......WALK`.' : ; :::? ) %' :.1N ;i \\ :: $T A', 000.. r 6 - THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE 120 O 272 8'0 `. E, CONTRACTOR FOR THE RESIDENT OF 676 TAYLOR AVE. N. 5. CONTRACTOR SHALL PROVIDE EROSION /SEDIMENTATION CONTROLS BASKETBALL :` : , CLEPNOU. 1 CONFORMING TO CITY OF RENTON STANDARD PRACTICE, SCALE: : HOOP ? \ B tm 26' I L ENE + 1 f 1 : CB PROTECTION AND OTHER APPROPRIATE MEASURES. .r.�R .:.. A+ r a ..:: 15 PERMANENT:.. TAM SP R c `._ 'EASEMENT ` • "\ I. 1 A`;: yo 'r; 1 • ` \ 6'4k (CITY OF RENIOId) <:.'. ..............:. FLL 3 \ob • a P \L ; o � PROVIDE I' COVER Ln SHEET NOTES BACKLOT SEWER EXTENSION - LINE B I. SHORE EXCAVATION AS REQUIRED TO PROTECT EXISTING 6. PROVIDE BUTT FUSION 'T' FITTING ON 8' HOPE SS PIPE UNDISTURBED HILLSIDE EMBANKMENT AND RESIDENCES. AT SIDE SEWER CONNECTION. 2. RESTORE ALL DISTURBED SURFACE VEGETATION WITH 7. ALL MAIN SS PIPE SHALL BE 8' OR 10' HOPE SDR 26, AS SHOWN. HYDROSEEDING. 3. MAINTAIN EXISTING AND /OR PROVIDE CLEAR PLASTIC PVC 8. PROTECT THE EXISTING 16' WATERMAIN FROM DAMAGE DURING CONSTRUCTION. DISRUPTION TO SERVICE WILL NOT BE ALLOWED. SHEETING (6 MIL. MIN.) TO COVER ALL EXCAVATED SURFACES DETAIL ANY DAMAGE THE WATERMAIN SHALL BE REPAIRED DURING RAIN PERIODS AND AFTER CONSTRUCTION HOURS. AT THE CONTRACTORS EXPENSE. LEAVE PVC SHEETING IN PLACE AFTER FINAL HYDROSEEDING, STAKE IN PLACE c 10' CC TO SECURE SLOPE. 9. SEE SHEET 3 FOR TRENCH DETAIL TYPES. 4. MATCH FINISH GRADE WITH ALL MANHOLE LIDS. 10. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE 120 CONTRACTOR FOR THE RESIDENT OF 676 TAYLOR AVE. N. 5. CONTRACTOR SHALL PROVIDE EROSION /SEDIMENTATION CONTROLS (CONSTRUCTING A RETAINING WALL FOR SLOPE STABILIZATION). CONFORMING TO CITY OF RENTON STANDARD PRACTICE, CONSISTING OF, BUT NOT LIMITED TO, SILT FENCING, CB PROTECTION AND OTHER APPROPRIATE MEASURES. 0 +00 1 +00 8' HDPE PIPE FLEXIBLE RUBBER JOINT COUPLING W/ STAINLESS STEEL BANDS �-- 10' HDPE PIPE 10' (MIN .)- -/ SLIP JOINT COUPLING A NTS I - SLIP JOINT COUPLING 8' x 8' x 8' SEE DETAIL A/- BUTT FUSION 'T' KPVC PIP 8' HDPE PIPE 35 SDR 26 10' (MIN.) o SERVICE JOINT COUPLING FB NTS - NO. IL -I- I ,+� I- I- I r Ii I I r ]C ® ® _ . - - ®- . I - AN _ ®�� 140 TYPE I RENCH DETAIL TYPE II T ENCH DETAIL 120 CL 3 � PROVIDE I' COVER Ln MIN. (TY .) x 100 - -__ -- LL 8' CURV D GRAVIT o ' SEWER HDPE) 3 W w +1uj 80 - �, J+ Q2 o z � w. x- wtD a— Ha V7 v a >� W'.. W z N Z,.. 60 J o w - H W L) it LL_ o v1 - - - - -- NCO F. t1 V) 40 °-o N= LINE B PROFILE 6 °'U low za mzN z CITY OF NTON DEPARTMENT OF PUBLIC WORKS NW 7TH STREET SEWER REPAIR PROJECT (INTERIM EMERGENCY SEWER REPAIR) SEWER PLAN AND PROFILE DESIGNED: JEB DATE: 9/30/91 FILE NAME: DRAWN: JES CHECKED: JOC SCALE: I' =20' FIELD Boom PACE REVISION BY APPR. DATE APPROVED: SHEET: 2 OF: 3 I A I I I I i i i I® i i I I i A