HomeMy WebLinkAboutS-055103RAINIER A4Ea"` .
PROPOSED SEWER PIPE
SPACE LANDSCAPE TIMBERS
ABOUT 25' APART
WHEN SLOPE IS FLATTER
THAN 2 HORIZ.:IVERT.
EDGE OF CLEARING
SEE DETAIL E/-
SPACE LANDSCAPE TIMBERS
ABOUT 10' APART
WHEN SLOPE IS STEEPER
THAN 2 HORIZ. :I VERT.
SEE PROFILE FOR DEPTH
18' MIN. (TYP.)
I �
I
i TRENCH EXCAVATION
LINE (TYP.)
I I
I �
I I
I I
I �
I I
I �
o _ EMBED PIPE ANCHOR
-- - - - - -- MIN. 5' -0' INTO
UNDISTURBED SOIL
4'-0'
2'-0' 18'
•4 a 8' EACHWAY, EACH FACE
MECHANICAL TYPE
COUPLING (VICTAULIC
OR EQUAL)
N
rIr _
I I I I
I I I I
o HDPE SEWER PIPE
(TYP.
iO
CRIMP ON MECHANICAL
JOINT ADAPTORS (STEEL)
4 - •4 DIAGONALS (TYP.) •
12 ' MIN. OVERLAP
(TYP. EA. FACE)
PIPE ANCHOR _ —_
NTS
SAWCUT FINAL
JOINT
3'AC CLASS B
SCHEMATIC OF LANDSCAPE
NOTE SURFACE RESTORATION
ONLY IN ASPHALT AREAS.
TRENCH PATCH
TIMBER PLACEMENT
E
1$��
a.r�a�a
BqR
rC'j Of WAS, �y
;o�. ,c o
Wow
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
6'
NW 7TH STREET SEWER REPAIR PROJECT
(INTER REPAIR)
MISCELLANEOUS DETAILS
SCALE: I' =20'
NOTES:
DESIGNED: JEB
DRAWN: JES
CHECKED: JDC
12'
36' + O.D. PIPE CRUSHED SURFACING,
6' P
TY •
TO KEY P COURS E E AND
STON
BANK RUN GRAVEL GROUND
RECOMMENDED FOR APPROVAL
SURFACE IN NON-PAVED AREAS)
PIPE BEDDING MATERIAL
REVISION
BY
_ AS SPECIFIED IN 7- 17.3(1)B
ITY DARE
APPROVED:
SHEET: 3 OF: 3
t R. C. E. NO. DATE
e, S Y/
AERY R. C. E. NO. DATE
EERS, INC.
6•
8' OR 10'
SANITARY SEWER
FOUNDATION MATERIAL CLASS A
AS DIRECTED BY THE ENGINEER
NOTES:
L ALL MATERIALS EXCAVATED FROM THE TRENCH SHALL BE REMOVED,
HAULED AND DISPOSED. EXCAVATION SHALL BE REPLACED WITH FOUNDATION,
BEDDING AND BACKFILL MATERIALS AS SHOWN IN TRENCH BACKFILL DETAIL
AND COMPACTED IN ACCORDANCE WITH SPECIFICATIONS.
2. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED
WITH TEMPORARY ASPHALT AT END OF EACH WORK DAY. FINAL TRENCH PATCHING
SHALL BE PLACED AFTER ALL FINISH GRADING AND SEEDING HAS BEEN ACCOMPLISHED.
TRENCH DETAIL TYPE I
C
NTS
CLEARING WIDTH
(LIMIT TO MINIMUM REQUIRED FOR CONSTRUCTION)
LANDSCAPE TIMBER (TYP.)
SEE DETAIL D/- 3' x 4' LANDSCAPE LANDSCAPE TIMBER
TIMBER (TREATED)
LENGTH AS REQUIRED
(10' MIN.)
90p MOUND BACKFILL
SLIGHTLY (TYP.)
100 -150 DOWNSLOPE — - —
(ALTERNATE SIDE OF SLOPE) _ - �_ TNDPSEACHESIDE)ADE
tccvzt ���Vi.��
I� I I I I I ( I I I Y I I I
Z
W
REBAR °
ANCHOR w
FALL LINE w
OF SLOPE
LANDSCAPE TIMBER DETAIL
NTS D
1' -0'
MIN.
NATIVE BEDDING AND BACKFILL
(HAND SCREENED TO REMOVE
2' AND LARGER MATERIAL)
SCHEMATIC OF LANDSCAPE
80R10'
SANITARY SEWER S -:a I
TRENCH DETAIL TYPE II
TIMBER PLACEMENT
E
1$��
a.r�a�a
BqR
rC'j Of WAS, �y
;o�. ,c o
Wow
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
A
NW 7TH STREET SEWER REPAIR PROJECT
(INTER REPAIR)
MISCELLANEOUS DETAILS
SCALE: I' =20'
NOTES:
DESIGNED: JEB
DRAWN: JES
CHECKED: JDC
DATE: 9/30/91
1. SPACE LANDSCAPE TIMBERS
FOR LINE B SIMILAR TO THOSE
SHOWN FOR LINE A, PLACE TIMBERS
RECOMMENDED FOR APPROVAL
FULL HEIGHT OF SLOPE.
2. PLACE EXCELSIOR MATTING OVER ALL
REVISION
BY
DISTURBED AREAS AFTER HYDROSEEDING.
ITY DARE
APPROVED:
SHEET: 3 OF: 3
t R. C. E. NO. DATE
e, S Y/
AERY R. C. E. NO. DATE
EERS, INC.
I� I I I I I ( I I I Y I I I
Z
W
REBAR °
ANCHOR w
FALL LINE w
OF SLOPE
LANDSCAPE TIMBER DETAIL
NTS D
1' -0'
MIN.
NATIVE BEDDING AND BACKFILL
(HAND SCREENED TO REMOVE
2' AND LARGER MATERIAL)
80R10'
SANITARY SEWER S -:a I
TRENCH DETAIL TYPE II
NTS
E
1$��
a.r�a�a
BqR
rC'j Of WAS, �y
;o�. ,c o
Wow
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
�eyoee�OmwLL wG��d
NW 7TH STREET SEWER REPAIR PROJECT
(INTER REPAIR)
MISCELLANEOUS DETAILS
DESIGNED: JEB
DRAWN: JES
CHECKED: JDC
DATE: 9/30/91
FILE NAME:
SCALE: NTS
FIELD BOOK: PAGE:
REVISION
BY
APPR.
DATE
APPROVED:
SHEET: 3 OF: 3