HomeMy WebLinkAboutS-14160D5C4 C
SEC. 4?/, MR. ZJN R.Sif. W M. d!fAFA?.4 L AWIFS3
All construction shall be In conformance wIth the City of An
"Regulations and Standards for Corstruction of Efxt�s;om to the City
Water and Sanitary Sewer Systen", revised addition.
2. A pre-constructlon conference shalt be arranged between contractor
and appropriate City of Renton officials prior -.* cOns-MUi"..�V".
3. It shall be the contractors responsibility to verify the true and
correct locations of all existing utilities showm, so as to avoid damage
or disturbance.
.9 4. All side sewers shall be laid on a 22 minimum grade, and shall be at
h a mint mum depth of 5 feet at property line.
-v \ /0 1 p 9840 m a
T n
The top of manholes within right-of-ways shall not be ad ju%tod to
ft-1 egr*�� un-11
just prior to paving.
\v C-0. J07 M. \/j Af 4 61%) 5 6, All sanitary sewer pipe to be concrete, non-retmforced, conforming to • i 10,533 4�92 - 5 fl'\ 'd. f 64 ASTM C14, Class 2. Alternate to be PVC plastic pipe conforming to ASTA
Q. 07t 5 1 5'k'T 0 3034,1lubber gaskets for concrete pipe sh�tt meet AST?- C443 standards.
1-�UO -- Rubber gaskets for PVC pipe shall meat ASTR 1869 standards. Pipe bedding
f A3
24 6. 6 AA .61, be class "C" according to APWA Std. Plan Na. 62.
y' 1 9295 °'
to
TUB IZT. 7 Kanholes to be per APWA manhole Std. Plan No. 34.
7877v H 411f 66'(.T 1, 1
5. 6-ruO
0�68 9-3 60' a- it %halt be *he contractors responsibility to secure alI necessary
S. 5T.Ug
Z48L permits prlor to start ofconstructi on.
S.7 TUB J4�69- 10-4.T
J4+0- 4447-
S. VIUS 7 9. The contractor shall be responsible for T.W. lnip*ctlom of the sewer
Z
systm,using angapproved.W. system. Video tapes shat ? be submitted to
% the Ci y showtn the T.V. Inspection work.
.5,
12
0� �36 ,
F,
6.5,ru Aeq 5
-34
271 S. 6TUB STUB
752g D. 4.(0 v L-r. J4.1 07- 33127
S. STUB
<
66.5 Z7� &
6. STUB
55 zr 6. STU6
"i f Ze N
S. STUB S. STUB
13-109 Z75 U.
la� 6 e - zq, zr.
Oe
9.
G.
V
S. 6rue
2P 50 34'47 4 j -
S. 6TUB 4' 5':;v,
eme
0*40- 017 0-
6. STUB
1440 - 37Xr.
M. H. WS j
S. 6rua
7-
/A 75 ZYT t Z+ //.5 ^' 302 r
S S. 67'U8
6f
S. 6TU6
7'
S. srus N. d3
2,00 - .5,pr
f t-l'(, A L A UA UkYA T Of�, UN
Me N?
6. erue 1 +47.5 31'4,7.'
j 75-7g.,
0�, 49. STUB
(F)1/154.6- 93'ZT. o4 T&AY - IN il. j s lw.,q d49 ON r1,Prz.4Nq 4yf -5C.
SOOT!/ OF /NT,-,Pit C r/ 0,V lea -,4yz, 5f o,
STUB t'IPK44
NP dY,' Jf fL 371 47
AW,5-- J2;e:
17 6- STUB -
S. 6TUB i 10+6`0-54 LT 11
3,9 JO�70'57
gs�bly (d 1*0 @ S. 671045
nodef jg)e
het �4 00
W
L -4N
Q q011 tf
av/nC/ '26W
.° axis /i9 seWei: a 'W
AC y 0B 'VAMP' 11000 0
w
•
049,�� PER F7VO SURVCY AP40 M. 55 9,47, CONTZAC71026 INFO&IMArION
10 M.H. 'Y/
MY • 02
04 26.6 8'LT no
0*06 5.6 Or
-&o
I'OA' CONSTRUCT /ON OATC -'
Masi '�`?�; �_>" -'"s / yr "\ / .
caNnm-
erne To 17
Yf,?IFY LOC. e INII OF 4 AS BUILT
AN111 Aft'll 4
S5 WIN L
PfAl CITY
PR /OR TO CON57 \B; f / / 2
-ee
.$XIOWN 01 W413"
54NIURr SfWf)e 0WIN,46T PUNS
FOURAc.
Z,ve.o .9
;1 &allrlv 19707 44th Azenue Wes -t \ss TlfFAN A4RV DIYISION No
\ / / Lynnwood, Waslv`ngton 98036 , 21j6 771--4;P1
7,1, 411 DRAWN BY R Mo aaam &T "A' AMMED rY 017',' Of ,YE/' /TON WN. 3NEET I all 0
110
30-0 ROLL 159