HomeMy WebLinkAboutS-14320APIPELINE MATERIALS SCHEDULE
Material Alternate E
Schedule Hate:ials i/ "ZOWE s 1
/ x
I ACP
COr4TRfBUTORY STREAM PVC (Pressure) 6�w.rEF. ' LATER
CIP or DIP
o
DIP or CIP
II ow `owE � Z0 mRE
aQUo. ° � - MARKEP; PaS•;
4a
�Q oo�"�� :6gs oa 30' EAR LVERT.S ^'LEtJGT 4d III VCYR6'EROICUTAR CONSTRUCTION PARALLEL CONSTRUCTION �� BLIO�fD FLAFIGE
c� f PVC (Sewer)
'Z. o 0 CIP or DIP
u PROVIDE SO G.Y. SCOUR I v9
eiQ° yt I I\ °, o COMC, SLA5 -$'-O "x
1L- a PKOTEGTIsu ROCK- E*-A DE If a sanitary sewer is to be located within � � � � ° ® \ 3'•O" x 6" THICK
IN LUMP SUM 6t D {TEM IV CIP or DIP 10 feet of pressure water -main within any
SP of the above indicated zones, special con-
ANGLED FITTING
structxon will required as shown below. AS SPECIFIED. EXIST, GRAVE
- e ° ON 5H EET ••7 \
Zone Gravity Sewer 2/ Pressure Sewer
f/ ) HONEY CREEK
D' A Material Schedule III with approved Do not locate sewer in this
mechanical compression joints. _ area.
°� E Material Schedule II with no joints Same as Zone A.
Cl O I 8" O.Z, PIPE
in zone or Material Schedule I in
steel casing. -
C Material Schedule I encased in Material Schedule LI with no WYE (Fl■FL%PE� �Sg
concrete or same as Zone 8. joints in zone or Material S °' D.T. FIFE
PLAN Schedule I in steel .casing. \
D Do not locate sewer in this area. Same. as Zone: A.
E.ND DF GRAVEL I' MIN. t.OV ER
ACCESS.--ROAD _ E Same as Zone A. Same as Zone C.
8 /
A -A PROFILE `, C
' o 0 1/ Pipe Material Abbreviations: 2/ Mechanical joints are .bolted joints _ BEND 2�
ACP - Asbestos cement pipe or reinforced concrete collars.. - - - _. 'iGR
CLEAt!IOUT W TICAL
PVC - Polyvinyl chloride pipe Compression joints are rubber ring
I - CIP - Cray cast iron pipe gasket joints. INTERCEPTOR LATERAL TO WE 17TH PL,
? KOFILE DIP - Ductile iron pipe Steel casing are 1/4" thick with
VCP - Vitrified clay pipe all voids pressure grouted with
SP - Steel 'pipe - ASTM A- 120 -SCH 40 sand- cement grout,
CULVERT INSTALLATION STA. 68 +50 20
N.Ya. IO WATER /SEWER CLEARANCE R MATERIAL REOIJIREMENTS 21
LUMP - SUM BID ITEM 10'
LU
r
2t ccea I - GA
1 Le ve /r� {niv /t[rYAT/on/ -) _Lr I L aft
'V5'T14ILK +4' WIDE
STL. PLATE
1 rir
/Ztr /L I 7R7D
ft
"IsII �v3eox�S �re� P
L LL
/Sk _ _ I °Sne/ueeas �JSrswJau
I I
D/�/Brss�C ff
f
rsrtf ®TO -- gy�[7dK.
a
j'?tsCK G,
WAS, Ir
CITY OF RENTON
�.
NOTE= AL ?ERNA'1•E 3P,1DCa�TOSU4S71TlJTE FOP, LOG BRIDCxE DEPARTMENT OF PUBLIC WORKS � 9 sea;
t6� PROYlDE AIL VAlUN6 4 G6I"iNEGT1=N DE-'AILS A e" sre HONEY CREEK - PHASE 2
PROPOSED rbF, EN61R, APPRWAL. $ sseQnal � G� DETAILS
CONSTRUCTION DRAWING .d....�.
HAMMOND, COLLIER & WADE- LIVINGSTONE I DRWUMODIFIERTOREELECr FIS FIB 3- :20 -StP 4p F,G:K.
"_ OATF 4 - 35 FILE. No ZbSa
ASSOCIATES, INC. a° , INCLUSION OE CDIVS'f Dwa M. X,
CONSULTING ENGINEERS ee QHSERVPTI(�N f�EC01 DS CN ECKB
SCALE MOTED F1LD600 Aoc_
—1 s,vNI v„ ,....
cI as : :... HO. R&NISION BY APPR. DATE APPROVED ' iD '►:D
°ieecs°x o. rva cc won.e
s�oveou n sows ee: els+e - .• - � SHEET-10—OF-10—
OF
a� .