Loading...
HomeMy WebLinkAboutS-14320APIPELINE MATERIALS SCHEDULE Material Alternate E Schedule Hate:ials i/ "ZOWE s 1 / x I ACP COr4TRfBUTORY STREAM PVC (Pressure) 6�w.rEF. ' LATER CIP or DIP o DIP or CIP II ow `owE � Z0 mRE aQUo. ° � - MARKEP; PaS•; 4a �Q oo�"�� :6gs oa 30' EAR LVERT.S ^'LEtJGT 4d III VCYR6'EROICUTAR CONSTRUCTION PARALLEL CONSTRUCTION �� BLIO�fD FLAFIGE c� f PVC (Sewer) 'Z. o 0 CIP or DIP u PROVIDE SO G.Y. SCOUR I v9 eiQ° yt I I\ °, o COMC, SLA5 -$'-O "x 1L- a PKOTEGTIsu ROCK- E*-A DE If a sanitary sewer is to be located within � � � � ° ® \ 3'•O" x 6" THICK IN LUMP SUM 6t D {TEM IV CIP or DIP 10 feet of pressure water -main within any SP of the above indicated zones, special con- ANGLED FITTING structxon will required as shown below. AS SPECIFIED. EXIST, GRAVE - e ° ON 5H EET ••7 \ Zone Gravity Sewer 2/ Pressure Sewer f/ ) HONEY CREEK D' A Material Schedule III with approved Do not locate sewer in this mechanical compression joints. _ area. °� E Material Schedule II with no joints Same as Zone A. Cl O I 8" O.Z, PIPE in zone or Material Schedule I in steel casing. - C Material Schedule I encased in Material Schedule LI with no WYE (Fl■FL%PE� �Sg concrete or same as Zone 8. joints in zone or Material S °' D.T. FIFE PLAN Schedule I in steel .casing. \ D Do not locate sewer in this area. Same. as Zone: A. E.ND DF GRAVEL I' MIN. t.OV ER ACCESS.--ROAD _ E Same as Zone A. Same as Zone C. 8 / A -A PROFILE `, C ' o 0 1/ Pipe Material Abbreviations: 2/ Mechanical joints are .bolted joints _ BEND 2� ACP - Asbestos cement pipe or reinforced concrete collars.. - - - _. 'iGR CLEAt!IOUT W TICAL PVC - Polyvinyl chloride pipe Compression joints are rubber ring I - CIP - Cray cast iron pipe gasket joints. INTERCEPTOR LATERAL TO WE 17TH PL, ? KOFILE DIP - Ductile iron pipe Steel casing are 1/4" thick with VCP - Vitrified clay pipe all voids pressure grouted with SP - Steel 'pipe - ASTM A- 120 -SCH 40 sand- cement grout, CULVERT INSTALLATION STA. 68 +50 20 N.Ya. IO WATER /SEWER CLEARANCE R MATERIAL REOIJIREMENTS 21 LUMP - SUM BID ITEM 10' LU r 2t ccea I - GA 1 Le ve /r� {niv /t[rYAT/on/ -) _Lr I L aft 'V5'T14ILK +4' WIDE STL. PLATE 1 rir /Ztr /L I 7R7D ft "IsII �v3eox�S �re� P L LL /Sk _ _ I °Sne/ueeas �JSrswJau I I D/�/Brss�C ff f rsrtf ®TO -- gy�[7dK. a j'?tsCK G, WAS, Ir CITY OF RENTON �. NOTE= AL ?ERNA'1•E 3P,1DCa�TOSU4S71TlJTE FOP, LOG BRIDCxE DEPARTMENT OF PUBLIC WORKS � 9 sea; t6� PROYlDE AIL VAlUN6 4 G6I"iNEGT1=N DE-'AILS A e" sre HONEY CREEK - PHASE 2 PROPOSED rbF, EN61R, APPRWAL. $ sseQnal � G� DETAILS CONSTRUCTION DRAWING .d....�. HAMMOND, COLLIER & WADE- LIVINGSTONE I DRWUMODIFIERTOREELECr FIS FIB 3- :20 -StP 4p F,G:K. "_ OATF 4 - 35 FILE. No ZbSa ASSOCIATES, INC. a° , INCLUSION OE CDIVS'f Dwa M. X, CONSULTING ENGINEERS ee QHSERVPTI(�N f�EC01 DS CN ECKB SCALE MOTED F1LD600 Aoc_ —1 s,vNI v„ ,.... cI as : :... HO. R&NISION BY APPR. DATE APPROVED ' iD '►:D °ieecs°x o. rva cc won.e s�oveou n sows ee: els+e - .• - � SHEET-10—OF-10— OF a� .