HomeMy WebLinkAboutS-143301f;ITY OF RENTON
HONEY CREEK
P14AwqF 3 - SANITARY SEWER REPLACEMENT
I
w vvp l7-
r�
VICINITY mmrr
TION'
r
DESCRIPTION WORK
SCHEDULE
LOCATION LENGTH
COMMENTS
A
LAKE WA. BOULEVARD 414
FULL WIDTHS
MH B TO MH C TO MH F030 .
A
N 28TH PLACE 400
FULL WIDTH
MH F035 TO MH FO 36
STREET REMOVAL
REPLACEMENT
A
PARK AVE N & N. 28TH STREET 747'
/AST
44Lt WIDTH
MH F038 TO MH F043
STREET REMOVAL
REPLACEMENT =i-Q
A
NE 28TH STREET 246
PAVEMENT
MH F045 TO MH F046
PATCH
A
NE 27TH 210' ±
MH F051 TO F052
NEW SERVICE FAVEM EDIT
CONNECTION PATCH
B
_ LAKE WA. BOULEVARD 232
F�,2T
fcULL- WIDTH -
MH F031 TO MH D TO MH C
PAVEMENT REPLACEMENT Q
I=A7-ir
C
N 28TH STREET
TG;_>L /' / "_ MH F043 TO MH F04 108
4
- Pair
- PEM(Wi ,rt-I ` LAC_E
REMOVAL_ 7" L.AC_EMEtJTG
C
(N 28TH STREET) 4U5 CASING 215
CARRIER PIPE
MH F044 TO MH F045
REMOVAL REPLACEMENT
D
NE 27TH STREET 310
PAVEM -N".-
MH F05 TO MH, F057
_
PATCH
51433
RECORD CONSTRUCTION DRAWING �
NOTE: THIS PROJECT WILL BE FUNDED IN PART WITH A GRANT FROM THE STATE OF
WASHINGTON. NEITHER THE STATE OF WASHINGTON NOR ANY OF ITS'
DEPARTMENTS, AGENCIES, OR EMPLOYEES WILL BE A PARTY TO THIS CONTRACT.
iM` VCK
11 a is
OF
OF RENTON
CITY
DEPARTMENT OF PUBLIC WORKS
.._
fs/OHAL
HONEY CREEK -PHASE 3
EN�\lf�A
/ss
COVER SHEET
r