Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutS-145406330
320
SEE SHEET 5
30'PERM NENT
EASEMENT I 51
SEATTLE WATER
PUMP STATION
'p SEATTLE
0
30'TEMPORARY EASEMENT
SEE SHEET 3
MANENT CONST. ANCHOR
BLOCKS PER 2/ +79.03 Q ro 2a4
17+44.58 DETAILS �p
13 �44 58 EASEMENT SHEET 3 M -9
MH- 7' MH-8 L CKI COVER) 1116TH
MH- 6 SEE DETAIL SHEET 3) R
LOCKING COVER) (LOCKING COVER)
1116TH LINE !SEATTLE WATER Co. EASEMENT)
/ — 36W M I \
APPROX. FINISH GRAD E
13
400-70 pIpE e 0.40 %
300
ON
MO
16
PROFILE SCALE
HORIZ. I"=40'
VERT. I" = 4'
EXIST. PROFILE �
O
20 21
+
350
J /
O
340
0 / Q� Q�
,L�
< I
(b ANCHOR BLOCKS
a7 M� / �� -q
330
A5- BUILT
SANITARY SEWER-PLAN a PROFILE
HEATHER DOWNS
S-191 L. I D. 297
RLB 41-77 12-4-24
RLS
AS SHOWN 461
RELOCATED 44H-7,REVORADES RB 11-13-78
4 !6
12.-4-24