JOB No. DESIGNED: PROJECT ENGINEER:
5003- 1000 -03 B.A.B. / K.O.C. B.A.B. .
SCALE: DRAWN BV: APPROVED BV:
C.L.K. /(/eta l • " w •' • 2615 Fourth Avenue
1' ° 40' Fourth & Vine Building
CHECKED BV: DATE:
• Seattle, Wash., 98121
No. DATE BV REVISION MA. D.
a r a t 7c
, A. BAc/ei•aa
� t Cfi W.tg1, `L y a
f�
0.CO /O i
1•e �ftjjyy,��Q4TEP�� fir? i
��'w'RAYAI
v :
:
E1EG��t°
E�G\?
'.FSSIBN
moll,,
Vyzis Commercial Brokerage
4 Development Company
SOUTHGATE OFFICE SHEET.
PLAZA ..ilcm e
Renton Washington
SANITARY SEWER PLAN 'BHT CO OF 8
GENERAL NOTES
1. All materials and workmanship shall conform to the standards and
specifications of the city of Renton and the 1984 Standard
Specifications for Road, Bridge, and Municipal Construction by WSOOT
and APWA - Washington State Chapter. It is the responsibility of the
contractor to obtain copies of these documents. In case of conflicts.
the standards and specifications of the City of Renton shall be used.
2. Datu• is the City of Renton. BM No. 1040, Elevation 18.42, top of
luminaire base on
chiseled square at southeast corner of concrete
westside of Lind Avenue approximately station 24.15. SM No. 1041.
Elevation 18 52 top of chiseled square at southwest corner of
luminairc base 75 feet north of northeast
concrete approximately
corner of Lind Avenue and 19th Street intersection.
3. Caution - extreme hazard - overhead electrical service lines are not
shown on the drawings. The contractor is responsible for determining
the extent of any hazard created by overhead electrical power in all
areas and shall follow procedures during construction as required by
law and regulation. Prior to construction, the contractor shall meet
With utility owners, determine the extent of hazard, determine
remedial measures and take whatever precautiuns that may be required.
4, identification, location, marking and responsibility for underground
facilities or util hies are governed by the provisions of RCW 19.122.
5. underground utility service lines including, but not limited to,
sanitary sewer, gas, water, drains, electricity, telephone, TV cable,
and culverts shall be maintained, relocated, rerouted, removed or
least interference with
restored by the Contractor with the Possible
such services.
6. The right is reserved by owners of utilities and franchises to enter
any street, road, right -of -way, or easement for the purpose of
maintaining their property and for making necessary repair or
adjustments caused by the contractor's operations. Th e contractor
shall hold the owner harmless of any costs so incurred.
7. A copy of this plan most be on -site whenever construction is io
progress.
8. It shall be the responsibility of the contractor to obtain street use
and any other related permits prior to any construction in city
right -of -way.
9. The contractor shall provide and maintain temporary facilities for
sedimentation to ensure that 'sediment -laden water does not enter the
storm drainage system or water bodies.
30. The contractor is solely responsible for the means, methods and
sequence of construction and for the safety of workers and public on
the construction site.
11. All existing curbs, landscaping and pavement which are to remain shall
be restored to original condition as approved by the engineer or
owner. The contractor is responsible for damage to any existing
facilities caused by his operations.
12. A preconstroction conference and twenty -four hour notice will be
required prior to starting new construction.
13. Locations of the structures shown hereon are approximate. Exact
locations shall be field set by the engineer.
14. Manholes and cleanouts shall be installed in accordance with City of
Renton standard plan.
15. All sanitary sewer pipe to be polyvinyl chloride pipe conforming to
the provision of ASTM D 3034, SDR 35. Pipe joints shall confann to
ASTM D 3212 using restrained gasket conforming to ASTM F 477.
16. All fittings to be injection molded tees or factory solvent cemented
saddle tees.
17. All pipe bedding shall be per City of Renton standard plan. All
trench backfill shall be compacted to minimum 90% per ASTM D1557 -0.
18. All sanitary sewers shall be pressure tested in accordance with the
specifications of the City of Renton. All pressure testing shall be
-
/87
done in the presence of a representative of the City of Renton.
19. All connections to existing sewer to be accomplished by the
Contractor. The contractor shall excavate completely around the
existing manhole to insure against unbalanced loading on tha manhole.
�k L�
.°-��
The contractor shall keep the manhole in operation at all times and
take precautions necessary to prevent any debris or other materials
from entering the sewer. The contractor may be required to install a
tight pipeline bypass through the existing channel.
1\
{7
20. Inspection will be accomplished by a representative of the City
Renton. It shall be the contractor's responsibility to notify the
0tility It 24 hours in advance of backfilli ng 01
construction.
21. Certified as -built drawings shall be provided to the City of Renton
. % - - -'"
upon completion of the sanitary sewer installation.
22. All sanitary sewers shall require T.V. inspection.
alp
-1
S. W.
. -,. ..� Yom✓... �.tlAy$","`. i/f.�Z" t�
APPROVED 150 E
moll,,
Vyzis Commercial Brokerage
4 Development Company
SOUTHGATE OFFICE SHEET.
PLAZA ..ilcm e
Renton Washington
SANITARY SEWER PLAN 'BHT CO OF 8