HomeMy WebLinkAboutS-186504SPECIFICATIONS FOR LIFT STATIONS
cn
(j Lu z
A. GENERAL
' C. PIPE AND FITTINGS
I 1.
ALL WORK AND SERVICES SHALL BE PERFORMED IN ACCORDANCE
1.
PIPE FOR SEWAGE TO BE DUCTILE IRON, ANSI A 21.51, CLASS
uj
WITH THE PLANS, SPECIAL PROVIFIONS, APPLICABLE LOCAL,
> `
53 CEMENT LINED.
STATE, AND NATIONAL CODES, AND STANDARD SPECIFICATIONS
2.
FITTINGS TO BE DUCTILE IRON, FLANGED, FLAT-FACED,
O
FOR MUNICIPAL PUBLIC WORKS .CONSTRUCTION, 1981 EDITION
W
CEMENT LINED, ANSI A 21.10.
(APWA). _
3.
FLEXIBLE COUPLING - DRESSER STYLE 38 OR STYLE 127.
2.
CONTRACTOR SHALL ACQUIRE AND PAY FOR ALL SPECIALTY.
4.
STEEL PIPE TO BE ANSI B125.2, SCHEDULE 40.
PERMITS SUCH AS ELECTRICAL, PLUMBING, TRANSPORTATION,
-
BURNING AND OTHER PERMITS OF A: TEMPORARY NATURE
D. ELECTRICAL
RELATING TO THE CONSTRUCTION OF THE PROJECT. -
3.
SUBMIT TO ENGINEER FOR ALL METAL FABRICATIONS, PRECAST
1.
PERMITS, LICENSES, APPROVALS AND OTHER ARRANGEMENTS FOR
CONCRETE ELEMENTS AND MECHANICAL /ELECTRICAL EQUIPMENT,
WORK SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR
SIX COPIES OF SHOP DRAWINGS OR MANUFACTURER'S
LITERATURE INDICATING NAME OF MANUFACTURER, MATERIALS
2.
AND INCLUDED IN THE BID PRICE.
ELECTRICAL WORK SHALL BE EXECUTED IN STRICT ACCORDANCE
OF CONSTRUCTION, FABRICATION DETAILS, DIMENSIONS,
WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE
-
WEIGHTS, PERFORMANCE DATA, SPECIFICATIONS, ELECTRICAL
AND LOCAL GRnTNANCES AND REGULATIONS.
j
WIRING DIAGRAM S AND .OTHER DATA AS REQUIRED BY THE
i 3.
ALL ELECTRICAL EQUIPMENT, NT MATERIALS C ONSTRUCTION
ENGINEER. -
METHODS, TESTS AND DEFINITIONS SHALL BE IN STRICT
4.
SUBMIT TO ENGINEER PRIOR TO START -UP SIX COPIES OF
CONFORMITY WITH THE ESTABLISHED STANDAR^S OF THE
OPERATION AND MAINTENANCE INSTRUCTIONS ON ALL
UNDERWRITERS LABORATORIES, INC. (UL) AND /OR NATIONAL
MECHANICAL /ELECTRICAL EQUIPMENT.
ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA).
- 5.
AT COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL CONDUCT
-4.
ALL EQUIPMENT SHALL BE LISTED AS APPROVED FOR THE
A PERFORMANCE TEST OF THE FACILITIES CONSISTING OF
APPLICATION IN WHICH IT IS BEING USED.
INDIVIDUAL TEST AND CHECKS MADE ON EQUIPMENTS INTENDED
5.
THE CONTRACTOR SHALL REFER TO THE DRAWINGS, PROJECT
TO PROVIDE PROOF OF PERFORMANCE OF UNITS AND PROPER _
DATA AND SHOP DRAWINGS OF OTHER TRADES FOR ADDITIONAL
OPERATION OF UNIT CONTROLS TOGETHER. WITH SUCH .NECESSARY
DETAILS WHICH AFFECT THE PROPER INSTALLATION OF THE
TESTS TO ASSURE PROPER ALIGNMENT,.. SIZE, CONDITION,
-
WORK. DIAGRAMS AND SYMBOLS SHOWING ELECTRICAL
CAPABILITY, STRENGTH, PROPER ADJUSTMENT, LUBRICATION,
CONNECTIONS ARE DIAGRAMMATIC ONLY, AND DO NOT
.PRESSURE, HYDRAULIC TEST, LEAKAGE TESTS AND ALL OTHER
- -- -
- .NECESSARILY SHOW THE EXACT PHYSICAL ARRANGEMENT OF THE
CHECKS DEEMED NECESSARY BY THE .ENGINEER TO DETERMINE
EQUIPMENT.
THAT ALL MATERIALS AND EQUIPMENT ARE SPECIFIED QUALITY,
6.
ALL CONDUIT SHALL BE HOT DIPPED GALVANIZED RIGID STEEL.
PROPERLY SITUATED, ANCHORED AND IN ALL RESPECTS READY
7.
FLEXIBLE CONDUIT SHALL BE LIQUIDTIGHT INTERLOCKING HOT
FOR USE. AFTER. TESTING, CONTRACTOR SHALL STARTUP THE
DIPPED GALVANIZED STEEL. -
j
FACILITY WHICH SHALL CONSIST OF .TESTING BY..A. SIMULATED
8.
PROVIDE COPPER CONDUCTORS UNLESS OTHERWISE INDICATED.
jOPERATION
ALL OPERATIONAL EQUIPMENT AND CONTROLS. THE
MINIMUM CONDUCTOR SIZE SHALL BE NO. 12 AWG UNLESS
PURPOSE OF THESE TEST SHALL BE TO CHECK THAT ALL
OTHERWISE INDICATED. CONDUCTORS NO. 10 AWG AND SMALLER
EQUIPMENT WILL FUNCTION UNDER OPERATING CONDITIONS,
SHALL BE SOLID, INSULATED WITH TW OR THW INSULATION.
THAT ALL INTERLOCKING CONTROLS AND SEQUENCES ARE
!
UTILIZE IDEAL INDUSTRIES "WING NUT" OR 3M COMPANY
PROPERLY SET AND THAT THE FACILITY WILL FUNCTION AS AN
"SCOTCHLOCK" PREINSULATED CONNECTORS FOR SPLICES AND
OPERATING UNIT -- FACTORY REPRESENTATIVES OF ALL MAJOR
TAPS IN CONDUCTORS NO. 10 AWG AND SMALLER. FOR NO. 8
UNITS 'WILL BE :PRESENT FOR THE .TESTING: AND STARTUP. THE
AWG AND LARGER CONDUCTORS, UTILIZE T &B COMPRESSION
j
TEST SHALL CONTINUE UNTIL IT IS. DEMONSTRATED THAT ALL
.CONNECTORS. COMPRESS USING RECOMMENDED DIE AND TOOLS.
DISFUNCTION OF CONTROLS AND MACHINERY ARE CORRECTED.
-
- - :- - - - -- - - - -- - - - -- - -- -
6.
- THE . PUMP STATION WET WELL IS CLASSIFIED AS AN EXPLOSIVE
-_
ENVIRONMENT. ALL MECHANICAL /ELECTRICAL EQUIPMENT. AND
CONSTRUCTION IN THE WET WELL SHALL MEET THE REQUIRE-
E. PAINTING
MENTSOF THE NATIONAL ELECTRICAL CODE FOR CLASS 1,
DIVISION 1, GROUP D AREAS. -
1.
PAINT ALL FERROUS METAL AND CONCRETE INSIDE OF WETWELL
7.
-
CONCRETE IN BOTTOM FILLETS AND SLAB TO BE v` SACK
WITH TWO COATS OF KOPPERS SUPER SERVICE BLACK 24 MIL
TOTAL "DRY" FILM THICKNESS PER MANUFACTURERS
(3000 P.S.I. MIN.). MIX CONCRETE. INTERIOR TO BE STEEL
INSTRUCTIONS.
,.
'
TROWEL FINISH AND SHAPED ON CONSTANT GRADE TOWARDS SUMP
2.
PAINT ALL NON - GALVANIZED FERROUS METAL OUTSIDE OF WET -
,
'
: AS SHOWN.
WELL WITH TWO COATS OF KOPPERS 600 ACRYLIC EMULSION, 3 -�
B. PUMP AND CONTROLS
MIL TOTAL FILM THICKNESS PER MANUFACTURERS -
INSTRUCTIONS. -
3.
DAMPROOF EXTERIOR CONCRETE BELOW GRADE WITH TWO COATS
1.
THE COMPLETE WET WELL MOUNTED SEWAGE PUMPSTATION
KOPPERS SUPER SERVICE BLACK 24 MIL TOTAL "DRY" FILM:
INCLUDING BUT NOT LIMITED TO PUMPS, CONTROLS,
AND ENCLOSURE. SHALL BE FURNISHED BY A. SINGLE
THICKNESS PER MANUFACTURERS INSTRUCTIONS.
MANUFACTURER.: SYSTEM SHALL BE SMITH. AND .LOVELESS
F. TELEPHONE
'(S &L), :WET WELL MOUNTED SEWAGE PUMP' LIFT STATION. -
.SERVICE
MODELS WITH 4B2B PUMPS.: STATION TO.BE:FURNISHED IN
1.
INSTALL 1" CONDUIT WITH PULL WIRE FOR FUTURE TELEPHONE. -
II
ACCORDANCE WITH STANDARD S&L SPECIFICATIONS FOR
RUN CONDUIT TO BUILDING "G11 FROM PUMP STATION B AND
STATIONS OF THIS TYPE WHICH ARE ON FILE AT THE
•
BUILDING "D" FROM PUMP STATION A OR AS REQUIRED BY
r
BELLEVUE- OFFICE OF DAVID EVANS AND ASSOCIATES, AND AS
MODIFIED HEREIN. _ -__
FIELD CONDITION.
�1 \ 2.
_
EACH PUMP IN LIFT STATION A SHALL HAVE A CAPACITY OF
150 GPMAGAINST A TOTAL HEAD OF 32 FEET. MINIMUM
/ - -
-
HORSEPOWER SHALL BE 3 AND MAXIMUM SPEED SHALL BE 1170
RPM MANUFACTURER SHALL BE S &L OR EQUAL.
3'
EACH PUMP IN LIFT STATION BSHALL HAVE A CAPACITY OF
_
150 GPM AGAINST A -TOTAL HEAD. OF 76 FEET MINIMUM
HORSEPOWER SHALL BE 7 1/2 AND MAXIMUM SPEED SHALL BE
I.
-1760: RPM.. MANUFACTURER SHALL BE S &L. NO SUBSTITUTION',
ALLOWED..
4.
PUMPS AND VALVES. SHALL BE MOUNTED ABOVE GRADE: '(NOT IN
WETWELL).
,I 5.
ELECTRICAL CONTROLS SHALL BE S &L STANDARD EXCEPT
STATION SHALL BE FURNISHED. WITH OPTIONAL' HIGH WATER
FLOAT OPERATED ALARM WITH EXTERNAL MOUNTED ALARM
HORN /LIGHT. _
FROM f5UILDIHCj COHTKOL PANEL
I�2IIG14#Z,240V, 30
I
� IcOA
MAIN SERVICE
QISCONN EGT
I N
61
+ -HEM6. 3R ELE(,TRlrAL
CNCLOiURE
141G-4'�4-
i
-6 , -0 11 coppElLCLAp
ZTEEL CIKOUHI, por..)
--- - -- - -- SANITARY SEWERS TO ,BE
PRIVATELY MA11VTAI/VED
c: uJ _J
Q
f
co
ti
b
m
cn
(j Lu z
z
O
c ® u
in F
a _Z
Z
uj
R >
> `
Z
W Z
Z
W Y
O
x W
W
' I cc
nnn
I4 4
II
� I z
I � �
I I I
I �
j I
I Z
I I
PUFIP co HTROL PANEL m
FURNISHEP gY Pump
- Hl,NuAL TRANSFER suPPUER
- REGEP, FOR FOKTAgLE cTEINEKATVrc
GEHI R,WoR To MATGIi EXIST, CITY OF
RENTON Po2T.A5LE GEH ERATU R, SET,
MOUNT OH ELEOTKICAL FHcotvGLIF.FAft
NOTE: RALk MOUHT ELECTRICAL ENGLOZURE-
AnJACENT LIFT STATION J //j
W =
J L
c �
w m
N _ O
g
o Y
l- rI ETALLIG FO(ZGEI'IAIN
ELEGTRl(,AL ONE LINE W\6RAM
Ho SCALE
�
19 18 17 18 15 14 13 12 11 10 9 8 7 6 I 0x -0 3
6 7 8 9 10 11 12 13 14 15 16 17 18 19