HomeMy WebLinkAboutD-207002NOTES: 1. PAVING DAMAGED DURING CONSTRUCTION SHALL BE REPLACED. RESTORE PAVING AND SUBGRADE TO ORIGINAL CONDITION. - 2. AFTER REMOVAL OF EXISTING LINER AND FILL, LEVEL SUBGRADE AND PROOF ROLL TO DENSE NON- YIELDING CONDITION PRIOR TO INSTALLING CRUSHED ROCK RINGWALL AND CRUSHED ROCK SURFACE COVER INSIDE DIKE CONTAINMENT WALLS. FINISHED GRADE: 24 FEET. 3. CONTRACTOR MUST PRESERVE ACCESS FOR OWNER'S USE OF DIESEL TANK AND CONCRETE FUEL CONTAINMENT AREAS AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE INTERFERENCE AND POSSIBLE INTERRUPTIONS WITH OWNER'S REPRESENTATIVE. X 4. STAGING FOR TANK CONTRUCTION AND DEMOLITION MAY BE ALLOWED WEST OF DIKE CONTAINMENT AREA. EXACT AREA AND DURATION OF USE TO BE NEGOTIATED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE. 5. PROVIDE ECOLOGY BLOCKS OR JERSEY BARRIERS (2 FOOT MAX. SPACING) TO PROTECT TEMPORARY PIPING FROM ` TRAFFIC ALONG ENTIRE LENGTH OF PIPING RUN, SUBMIT PLATE AND BLOCKING PLAN FOR VEHICLE CROSSING OVER TEMPORARY PIPING WHERE NEEOED. SANDBAGS PLACED TO _ ' HEIGHT OF THREE FEET ACROSS ENTIRE WIDTH 6. DRAINAGE WORK SHALL BE IN ACCORDANCE WITH THE WASHINGTON STATE D.O.T. /A.P.W.A. SPECIFICATIONS OF CONTAINMENT EXTERIOR CONTRACT LIMITS (1991 EDITION) AND THE STANDARD PLANS. SEE NOTE 7. (SEE SHEETS YDE110,YDE110R, AND IL60 FOR WORK INSIDE 7. CONTRACTOR TO PLACE TEMPORARY PS 300 SERVICE TANK INSIDE CONTAINMENT EITHER BY LIFTING IT IN WITH m 4 -89 BUILDING) .. APPROPRIATE CRANE OR CUTTING WALL ON WEST SIDE OF CONTAINMENT AND TRANSPORTING IT IN ON WHEELS. AFTER SPOTTING TANK, A MINIMUM CLEARANCE OF FIVE FEET SHALL BE PROVIDED ON ALL SIDES. CONTRACTOR SHALL CONSTRUCT A SECONDARY CONTAINMENT CELL, USING THE EXISTING WALLS AND SAND BAGS, OR OTHER 30 "0 NEW DOUBLE -WALL APPROVED DEVICES, AROUND THE TANK, PROVIDING A MINIMUM STORAGE VOLUME OF 26,250 GALLONS. - STEEL TANK TO BE ERECTED _ ON SAME CENTER POINT AS - REMOVED TANK SEE NOTE 8 i aN.m - - DIESEL TANK HOSE PLATFORM - - 'EXISTING 12" m STORM DRAIN PRIMARY TANK SHELL - �(I\ '0S o PRIMARY TANK BOTTOM VALVE BOX o CB 6 0 SHUT OFF VALVE n Y SECONDARY TANK SHELL OIL WATER SEPARATOR oOZ UTILITY VAULT 3030 -LA SECONDARY TANK BOTTOM, PROVIDE O - a OR EQUAL CORROSION PROTECTION PER API. A RECOMMENDED PRACTICE 651. 6'!;! GATE STORM LINE VALVE CB 8'm CAST IRONS Cg EoL. 24.0 CAP AND SEAL CO. —L / o ; Q 000ce pO� e ro oil a paa 5" O .71K O �'y O \IS CAST IRON B �S 0 STORM LINE .. / I O8O U° " 2 3/4" MINUS PER \ PLUG ANO 6 0 CAST IRON STORM LINE / -10o 1 SEAL / SPECIFICATION 8'0 CAST IRON STORM LINE �__._ CONCRETE FUEL 1 gyp° d CONTAINMENT AREA o 0 q DRAIN 0 6 O. CAST IRON STORM LINE (TO REMAIN) q'� O (D- CONCRETE CB I FOUNDA ONINGWALL 0 a/ O FOUNDATION MATERIAL CLASS A PER 8'0 CAST IRON STORM LINE C WSDOT /APWA 9 -03.17 ❑ EXISTING 8" 'STORM LINE 3' 3' CB CB '2'0 BLACK STEEL CONDENSATE NOTE: DISCHARGE LINE E CONTRACTOR SHALL SUBMIT SUBMISSION DESIGN DETAILS EXISTING 6" 'STORM LINE FOR. PROPOSED NEW TANK, SUBMISSION SHALL ASSURE \ (TO REMAIN) � FACTOR OF SAFETY WITH RESPECT TO BEARING CAPACITY y E' NEW CONDENSATE VCg UNDER TANK SHELL OF AT LEAST 3.0. COOLER CONTRACTOR SHALL EXPOSE AND VERIFY GRADE CONSTRUCTION : AND UTILIDOR. TRACTOR SECTION ICU OF TANK FOUNDATION �a1 STAGING AREA - CE - SHALL SAW, CUT EXISTING CAST -IN -PLACE CONCRETE Cz L SAW STING C ( C� UTILITY SECTION ABUT NEW PRECAST UTILIDOR SECTION NOT TO SCALE CZ CZ 2 I TO EXISTING: UTIUDOR, AND GROUT NEW UTILIDOR SECTION IN PLACE, ASSURING A WATER TIGHT JOINT. � 2 "m BLACK 10 STEEL MIN. I %2 TEMPORARY ABOVE- PIPE REPLACE PAVING AND BASE H % S GROUND PIPING NEW CONCRETE COURSE TO MATCH EXISTING, F /, SEE NOTE 5 0. UTILIDOR h -N EXCEPT. AS SPECIFIED H SEE SHEET Mi _ ? / SAWCUT TVP, 6" MIN TYP. � 0 10 20 a• rD• SCALE IN FEET — EXISTING CONCRETE UTILIDOR m COMPACTED STRUCTURAL N FILL FOR TRENCH BACKFILL p 6„ BLDG 4 -89 1 LLMAINTAIN CLEAR DISTANCE THROUGHOUT SITE P AN N STEAM PLANT r /'1 BEDDING (PER 9 -03.15 WSDOT/ f DURATION OF PROJECT - APWA 1991 STD. SPEC.) CHECKED FOR COMPLIANCE TO CITY STANDARDS �A SECTION - TYPICAL PIPE TRENCH g_suy,��^atefo 23_g2 NOT TO SCALE 2TI 2 Date Date wefec/ 16 4r-4?­Yf 9vo.yob /e RECOMMENDED RECOMMENDED �DI V FOR APPROVAL FOR APPROVAL J. Ciq BY BY Po„ C HAViTCROWSER �gL S�G�pp ,vns' /1,7 snap«. ,,m ,PLAN Revvs`w 10-2-1•92 5/19/92 C DRAWN BY DATE SUBTITLE SYM REVISION BY PPROVE DATE SYM - REVISION BY PPRDVE DATE ( ACCEPTABILITY EJC LAST REVISION. SYM DATE AUBURN, )✓A' 98002 a 2 92 THIS DESIGN AND /GR REVISIONS PER BOEING REVIEW COMMENTS OF o�q H' K SHEET 01 JUN 92 AND HART CROWSER FINAL REVIEWD /JH MJB 0 JUN 9 ❑ EVERETT, WA. 98201 I PECIFICATION IS APPROVEDAH SITE PLAN AND SECTIONS 2 LNUINEERLD BY TITLE REVISIONS PER CITY OF RENTON REVIEW COMMENTS APPROVED BY DEPT. DATE z JD /JH MJB z1 AUG 9z of 1 O Cl PORTLAND, OR. 97220 0 '4rlcn cam` JAH s 92 rJ REVISIONS PER CITY OF RENTON REVIEW COMMENTS 7Fp,. CHECKED FUEL STORAGE REPLACEMENT OD /JH MJB 14 DCT 92 6r JOB NO. CON FIT F r ®RENTON, WA. 98055 sr pNAL�' sLC 5/7/92 FOR ARECILI - FACILITIES DEPARTMENT O SEATTLE, WA, 98124 APPROVED 305355 FU -DWGq exAIB =s. /, �1 YS RENTON FACILITY pv /,, NO. APPROVED BLDG 4 -89 RENTON 304 -089 1002 �3a�