Loading...
HomeMy WebLinkAboutD-21621AN 5. STATIONING Sh.. IN IN CENTERLINE OF ROADWAY OR SURVEY CONTROL LINES TRENCH WIDTH PER APPROPRIATE N tD m 7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS. N 8. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS �1 ASPHALT CONCRETE PAVEMENT `I ... 4.0' TO k..O' J a 9. INSTALL SEWER MAIN AND SERVICES AMINIMUM 2' FROM PARALLEL GAS LINES RESTORATION DETAIL WHERE CONFLICT OCCURS. h N TS N 1 a NOTES: 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED U) LLJ CD PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORK DAY. Z H- a- CURB AND GUTTER.' Z I I �LLJ M U 12. REPLACE ALL ' DISTURBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN LLJ 1.1 F- 2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND 2. HAND TAMP UNDER HAUNCHES. !, 4 LLI a INSERT ETHAFOAM. HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE _ LLI 3. ALL ASPHALT PATCH AREA.OUTSIDE OF PAY LIMIT SHOWN SHALL LLJ M w LLI 14. HORIZONTAL SURVEY CONTROL IS BASED ON THE MONUMENTS AT THE INTERSECTION aQQV) OF NE 28TH ST / JONES AVE NE AND NE 20TH ST /JONES AVE NE. W 4. ALL TEMPORARY PATCHES ON .TRENCHES SHALL BE PERMANENTLY PATCHED (� Q Q COORDINATES: WITHIN (2) WEEKS OF COMPLETION OR WORK WITHIN THE ROADWAY AREA Nr N w w O Y Z z () �- LJ mo o: wz x d 0 O 3E E"q a �zn 4! Ey W 0- � c (> a v E E c w ) c ow a� Ln a N z z z o i. a 1 6" PAY LIMIT TRENCH BACKFILL 6' -0" FOR 12" SEWER AND 12 " -24" STORM PIPES cure- -.1. SEE DETAIL FOR STREET RESTORATION REQUIREMENTS SUBSEQUENT BACKFILL MATERIAL (NATIVE D N IM ORT PERRC SECTION 9 OR 03.12(1)C (SELECT BACKFILL) OF THE SPECIAL PROVISIONS PROPOSED 12' SEWER PIPE AND 24" AND 12" STORM PIPES PIPE ZONE MATERIAL PER SECTION 9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST NOTES: 1. PROVIDE, UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 9OXi,MINIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH EXCAVATION SAFETY SYSTEMS SID ITEM. 12" PVC SEWER AND 24 " -12" CPEP STORM PIPES TYPICAL TRENCH BEDDING AND BACKFILL 12" TYP TRENCH (SEE DETAILS) PAY LIMIT OF TRENCH SAWCUT FINAL JOINT TYP. EACH SIDE T. ASPH. CONC. PAVEMENT, TYP PAY LIMIT TRENCH BACKFILL 5' -0" FOR 18" O.D. HDPE & 28" O.D. HDPE DUAL LINE TRENCH I T }8" I SUBSEQUENT BACKFILL MATERIAL (NATIVE IF APPROVED BY ENGINEER) OR IMPORT PER SECTION 9- 03.12(1)C (SELECT BACKFILL) OF THE SPECIAL PROVISIONS PROPOSED 187 O.D. HDPE SEWER AND 28" O.Q. STORM HDPE MAINS PIPE ZONE MATERIAL SHALL BE PEA GRAVEL OR SAND EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) DEPTH AS APPROVED BY ENGINEER MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL- 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM'DENSITY EXCEPT DIRECTLY. OVER PIPE WHERE'. COMPACTION'. WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED_ 5. ALL EXCAVATION AND BEDDING AND BACKFILL , MATERIALS BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH EXCAVATION SAFETY SYSTEMS BIU ITEM. 18" C.D. HDPE SEWER AND 28" O.D. HDPE STORM TYPICAL TRENCH BEDDING AND BACKFILL `- 8" CL 'B' ASPHALT CONCRETE PATCH CONSTRU !ON NOTES (NE 27th ST, KENNEWICK PL NE & ABERDEEN AVE NE) 1. TRENCH SAr AND SHORING SHALL BE PER SECTION 7- 08.3(1)6 OF THE SPECIAL 4' CL 'B' ASPHALT CONCRETE PATCH PROVISIONS. =NCHES SHALL . BE SEALED TO PREVENT ENTRY DURING NON - WORKING (NE 24th ST) HOURS. 2. VERTICAL C tOL DATUM BASED ON NAVD 1988 (IN FEET) �- 6" CRUSHED SURFACING TOP COURSE 3. UTILITY CRO:. G LOCATIONS AND ELEVATIONS SHALL BE DETERMINED BY THE CONTRACTOh ADVANCE OF ANY CONSTRUCTION ACTIVITIES. BACKFILL 4. EXISTING PRI% IMPROVEMENTS SHALL BE TEMPORARILY RELOCATED AND PATCH PAYMENT I (SEE BEDDING /BACKFILL DETAIL) PERMANENTL -- - <EPLACED TO ACCOMMODATE SERVICE CONSTRUCTION. 10' -0' FOR 16" C905 PVC & 24" C905 PVC 5. STATIONING Sh.. IN IN CENTERLINE OF ROADWAY OR SURVEY CONTROL LINES TRENCH WIDTH PER APPROPRIATE m n� DETAIL PLUS 2' -0' 7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS. 6' -0' SIDE SEWERS 8. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS �1 ASPHALT CONCRETE PAVEMENT `I ... 4.0' TO k..O' J a 9. INSTALL SEWER MAIN AND SERVICES AMINIMUM 2' FROM PARALLEL GAS LINES RESTORATION DETAIL WHERE CONFLICT OCCURS. TPIPE N TS Z O THICK. (IN ACCORDANCE WITH STANDARD PLAN #F006, DRAWING #FR01N). NOTES: 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED U) PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORK DAY. ' CURB AND GUTTER.' THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. 12. REPLACE ALL ' DISTURBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. THE FINAL SAWCUT JOINT SHALL BE A MINIMUM OF 1' BEYOND 2. HAND TAMP UNDER HAUNCHES. !, 13. WHERE UTILITY PIPE LINE VERTICAL SEPARATION IS LESS THAN (1) ONE FOOT, THE UNDISTURBED EDGE OF THE TRENCH. INSERT ETHAFOAM. HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE EXCEPT DIRECTLY OVER PIPE WHERE I COMPACTION WILL BE 3. ALL ASPHALT PATCH AREA.OUTSIDE OF PAY LIMIT SHOWN SHALL HAND TAMP ONLY. 14. HORIZONTAL SURVEY CONTROL IS BASED ON THE MONUMENTS AT THE INTERSECTION BE CONSIDERED INCIDENTIAL TO OTHER ITEMS OF WORK. OF NE 28TH ST / JONES AVE NE AND NE 20TH ST /JONES AVE NE. FLOW LINE IS MAINTAINED. 4. ALL TEMPORARY PATCHES ON .TRENCHES SHALL BE PERMANENTLY PATCHED 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS COORDINATES: WITHIN (2) WEEKS OF COMPLETION OR WORK WITHIN THE ROADWAY AREA LL,i UNLESS APPROVED BY THE ENGINEER: 16" C905 PVC SEWER AND 24" C905 PVC STORM TYPICAL TRENCH BEDDING AND BACKFILL z 10' -0' FOR 16" C905 PVC & 24" C905 PVC 5. STATIONING Sh.. IN IN CENTERLINE OF ROADWAY OR SURVEY CONTROL LINES DUAL LINE TRENCH AS DEFINED BY THE CONTROL POINTS. n� 6. ALL MANHOLES AND TYPE -2 CATCH BASINS SHALL HAVE LOCKING LIDS. 7. MATCH FINISH GRADE WITH ALL MANHOLE LIDS. 8. PROVIDE AS -BUILT INFORMATION SHOWING ALL INVERT AND RIM ELEVATIONS �1 OF MANHOLE AND CATCH BASINS AND SIDE SEWER VERTICAL AND HORIZONTAL. LOCATIONS. `I ... 4.0' TO k..O' J a 9. INSTALL SEWER MAIN AND SERVICES AMINIMUM 2' FROM PARALLEL GAS LINES 1, -0, - WHERE CONFLICT OCCURS. TPIPE 10. ALL CEMENT CONCRETE DRIVEWAYS AND ALLEY APPROACHES SHALL BE 6" 24" THICK. (IN ACCORDANCE WITH STANDARD PLAN #F006, DRAWING #FR01N). 11. REPLACE ALL DISTURBED CURB & GUTTERS IN ACCORDANCE WITH STANDARD PLAN # F008, DRAWING # FRO5 AND STANDARD PLAN # F001 'CEMENT CONCRETE ' CURB AND GUTTER.' `. 12. REPLACE ALL ' DISTURBED SIDEWALK IN ACCORDANCE WITH STANDARD PLAN NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. # F007. DRAWING # FR02. 2. HAND TAMP UNDER HAUNCHES. !, 13. WHERE UTILITY PIPE LINE VERTICAL SEPARATION IS LESS THAN (1) ONE FOOT, 3. COMPACT PIPE. ZONE MATERIAL TO 90% MINIMUM DENSITY INSERT ETHAFOAM. HS 600 PLANK -FOAM BOARD OR EQUAL AS CLEARANCE EXCEPT DIRECTLY OVER PIPE WHERE I COMPACTION WILL BE SEPARATION.. HAND TAMP ONLY. 14. HORIZONTAL SURVEY CONTROL IS BASED ON THE MONUMENTS AT THE INTERSECTION 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE OF NE 28TH ST / JONES AVE NE AND NE 20TH ST /JONES AVE NE. FLOW LINE IS MAINTAINED. REFER TO THE COVER SHEET OF THESE CONSTRUCTIONS PLANS FOR THE RESPECTIVE 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS COORDINATES: BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN LL,i 0: 10' -0' FOR 16" C905 PVC & 24" C905 PVC SEE DETAIL #1 AND #2 DUAL LINE TRENCH FOR STREET RESTORATION REQUIREMENTS n� SUBSEQUENT BACKFILL MATERIAL (NATIVE IF APPROVED BY ENGINEER) OR IMPORT PER SECTION 9- 03.12(1)C �1 (SELECT BACKFILL) OF THE SPECIAL PROVISIONS. `I ... 4.0' TO k..O' J a 1, -0, - PROPOSED 16" C905 PVC SEWER AND 24" C905 PVC STORM MAIN TPIPE ZONE MATERIAL PER SECTION 24" 9 -03.16 BEDDING MATERIAL FOR FLEXIBLE PIPE EXCAVATION OF UNSUITABLE SOIL AND BACKFILL OF FOUNDATION MATERIAL (IF NECESSARY) ' DEPTH AS APPROVED BY ENGINEER `. MATERIAL SHALL MEET SECTION 9- 03.9(1) BALLAST NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. !, 3. COMPACT PIPE. ZONE MATERIAL TO 90% MINIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE I COMPACTION WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN THE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM. 16" C905 PVC SEWER AND 24" C905 PVC STORM TYPICAL TRENCH BEDDING AND BACKFILL DmAV621A ✓. : c r& I 15' UTILITY EASEMENT I VARIES TYPICAL CROSS SECTION FOR 16" C905 PVC, 24 "IC905 PVC AND 8" DI SEE ABOVE DETAIL FOR BACKFILL AND BEDDING REQUIREMENTS SCAME12 JUL 27 20W S- �1C217