HomeMy WebLinkAboutD-226401Q
O
N
r
O.
00,
CY)
o'
0
E
O
n
W
PROJECT SITE
Swp - 27— r6GS '
0 5 10 20
SCALE IN MILES
LOCATION MAP
o
PROJECT SITE
SEE SHEET 2
89
MAPLEWOOD
GOLF COURSE
cF0
q
0 .25 .5 1
SCALE IN MILES
VICINITY MAP
CITY OF RENTON STORM WATER DRAINAGE NOTES:
(THE FOLLOWING NOTES ARE REQUIRED BY THE CITY OF RENTON TO APPEAR ON -
THESE PLANS. SOME NOTES MAY NOT APPLY TO THIS PROJECT. PROJECT PLANS
AND SPECIFICATIONS TAKE PRECEDENCE OVER THESE NOTES.)
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST -
BE HELD WITH THE CITY OF RENTON DEVELOPMENT SERVICES. DIVISION, PLAN REVIEW PROJECT MANAGER.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE "STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION" PREPARED BY W.S.D.O.T.,
AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON.
3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH
ARE ON FILE WITH THE CITY OF RENTON. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE
WRITTEN APPROVAL FROM THE CITY OF RENTON DEVELOPMENT SERVICES DIVISION.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5. DATUM SHALL BE U.S.G.S. UNLESS OTHERWISE APPROVED BY CITY OF RENTON. REFERENCE BENCHMARK
AND'.ELEVATION ARE NOTED ON THE PLANS.
6. ALL SEDIMENTATION /EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED
AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED.
7. ALL RETENTION /DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN
CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE DEVELOPMENT
SERVICES DIVISION.
8. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF
RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED
BY THE DEVELOPMENT SERVICES DIVISION.
9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY' PREPARED FOUNDATION IN ACCORDANCE
WITH SECTION 7- 02.3(1) OF THE CURRENT SATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD
AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR
THE TOP OF THE FOUNDATION MATERIA! AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING
MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A
UNIFORMLY DENSE UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C ", WITH THE
EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95% FOR PAVEMENT
AND STRUCTURAL FILL AND 90% OTHERWISE PER ASTM D- 1557 -70. PEA GRAVEL BEDDING SHALL BE
6" OVER AND UNDER PVC PIPE.
10. GALVANIZED.. STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DFAINAGE FACILITIES SHALL HAVE
ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE.
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY DRAINAGE PIPE,
OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT -OF -WAY WILL NOT BE ALLOWED' UNLESS
SPECIFICALLY APPROVED BY CITY OF RENTON.
13. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY
ROCK PLACED TO A DEPTH OF 1 FOOT 'AND MUST MEET THE FOLLOWING SPECIFICATION: 4"-8"/407.-70%
PASSING; 2 " -4" .ROCK /307-40 %PASSING, AND <2" ROCK/107-20% PASSING.
14. THE CONTRACTOR SHALL: BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD,:. SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH,
AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF
WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY
INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL 'PLAN ..BY THE
TRANSPORTATION DIVISION: ALL SECTIONS OF THE W.S.D.O.T. STANDARD SPECIFICATION 1- 07 -23, .
TRAFFIC CONTROL, SHALL APPLY.
15. SPEC;1L DRAINAGE MEASURES WILL REQUIRED IF THE PROJECT LOCATION IS WITHIN. THE AQUIFER
PROTECTION AREA.
s
SW 1/4 SECTION 15 TOWNSHIP 23N RANGE SE
SE 1/4 SECTION 16
NE 1/4 SECTION 21
NW 1/4 SECTION 22
Engineers and Scientists
B.11 —e, . Washington
TEL (425) 602 -4000
FAX: (425) 602-4020 NO. I REVISION
i413; ':��_zdfeo/ SCANNED MAR 3 0 2000
�s*: �4i^ :c,>
��'`E€s.�,
V1
r
0
d
N
x
wN�
� N
H
I
N
® I
CI
MAPLEWOOD
CREEK FISH
CHANNEL
PROTECT
SHEET NO.
DRAWING DESCRIPTION
1
PROJECT LOCATION MAP AND DRAWING INDEX
2
PROJECT SITE PLAN
3
SITE PLAN A AND PROFILE
4
SITE PLAN B AND PROFILE
5
SITE PLAN C AND PROFILE
6
SITE PLAN D AND PROFILE
7
SITE DETAILS: AND SECTIONS
8
SPLITTER STRUCTURE AND FISH LADDER GRADING PLANS "
9
TYPICAL, CHANNEL SECTIONS
10
BOX CULVERT CROSSING DETAILS
11
LOG DROP STRUCTURE PLAN, SECTIONS, AND DETAILS
12
FISH HABITAT STRUCTURE DETAILS
13
STANDARD CONCRETE AND REINFORCEMENT DETAILS
14
SPLITTER STRUCTURE PLAN AND SECTIONS
15
FISH LADDER PLAN AND SECTIONS
16
FISH LADDER SECTIONS AND DETAILS
17
MISC METAL AND RAILING DETAILS
18
MISC' METAL DETAILS
19
VEGETATION SITE PLAN A AND SECTIONS
20
VEGETATION SITE PLAN B AND SECTIONS
21
VEGETATION SITE PLAN C AND SECTIONS
22
VEGETATION SITE PLAN D AND SECTIONS
ADDITIONAL DRAWINGS
NEW GREEN PLAN
RELOCATION OF 16 -INCH WATER LINE
PRIVATE UTILITY RELOCATIONS
WSDOT STANDARD
PLAN B -5, REINFORCED CONCRETE SINGLE BOX CULVERT (11- 26 -79)
W
PROJECT SITE
Swp - 27— r6GS '
0 5 10 20
SCALE IN MILES
LOCATION MAP
o
PROJECT SITE
SEE SHEET 2
89
MAPLEWOOD
GOLF COURSE
cF0
q
0 .25 .5 1
SCALE IN MILES
VICINITY MAP
CITY OF RENTON STORM WATER DRAINAGE NOTES:
(THE FOLLOWING NOTES ARE REQUIRED BY THE CITY OF RENTON TO APPEAR ON -
THESE PLANS. SOME NOTES MAY NOT APPLY TO THIS PROJECT. PROJECT PLANS
AND SPECIFICATIONS TAKE PRECEDENCE OVER THESE NOTES.)
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST -
BE HELD WITH THE CITY OF RENTON DEVELOPMENT SERVICES. DIVISION, PLAN REVIEW PROJECT MANAGER.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE "STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION" PREPARED BY W.S.D.O.T.,
AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON.
3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH
ARE ON FILE WITH THE CITY OF RENTON. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE
WRITTEN APPROVAL FROM THE CITY OF RENTON DEVELOPMENT SERVICES DIVISION.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5. DATUM SHALL BE U.S.G.S. UNLESS OTHERWISE APPROVED BY CITY OF RENTON. REFERENCE BENCHMARK
AND'.ELEVATION ARE NOTED ON THE PLANS.
6. ALL SEDIMENTATION /EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED
AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED.
7. ALL RETENTION /DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN
CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE DEVELOPMENT
SERVICES DIVISION.
8. GRASS SEED MAY BE APPLIED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF
RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED
BY THE DEVELOPMENT SERVICES DIVISION.
9. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY' PREPARED FOUNDATION IN ACCORDANCE
WITH SECTION 7- 02.3(1) OF THE CURRENT SATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD
AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR
THE TOP OF THE FOUNDATION MATERIA! AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING
MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A
UNIFORMLY DENSE UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C ", WITH THE
EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95% FOR PAVEMENT
AND STRUCTURAL FILL AND 90% OTHERWISE PER ASTM D- 1557 -70. PEA GRAVEL BEDDING SHALL BE
6" OVER AND UNDER PVC PIPE.
10. GALVANIZED.. STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DFAINAGE FACILITIES SHALL HAVE
ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE.
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY DRAINAGE PIPE,
OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT -OF -WAY WILL NOT BE ALLOWED' UNLESS
SPECIFICALLY APPROVED BY CITY OF RENTON.
13. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY
ROCK PLACED TO A DEPTH OF 1 FOOT 'AND MUST MEET THE FOLLOWING SPECIFICATION: 4"-8"/407.-70%
PASSING; 2 " -4" .ROCK /307-40 %PASSING, AND <2" ROCK/107-20% PASSING.
14. THE CONTRACTOR SHALL: BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD,:. SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH,
AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF
WORK COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY
INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL 'PLAN ..BY THE
TRANSPORTATION DIVISION: ALL SECTIONS OF THE W.S.D.O.T. STANDARD SPECIFICATION 1- 07 -23, .
TRAFFIC CONTROL, SHALL APPLY.
15. SPEC;1L DRAINAGE MEASURES WILL REQUIRED IF THE PROJECT LOCATION IS WITHIN. THE AQUIFER
PROTECTION AREA.
s
SW 1/4 SECTION 15 TOWNSHIP 23N RANGE SE
SE 1/4 SECTION 16
NE 1/4 SECTION 21
NW 1/4 SECTION 22
Engineers and Scientists
B.11 —e, . Washington
TEL (425) 602 -4000
FAX: (425) 602-4020 NO. I REVISION
i413; ':��_zdfeo/ SCANNED MAR 3 0 2000
�s*: �4i^ :c,>
��'`E€s.�,
V1
r
0
d
N
x
wN�
� N
H
I
N
® I
CI