Loading...
HomeMy WebLinkAboutD-226403Q dj O 00 6J o r O E O (L CHANNEL HORIZONTAL CURVE DATA CURVE RADIUS (ft) LENGTH (ft) DELTA PI NORTHING PI EASTING NOTES, SEE SHEET 2. 11T' F.AIR',,AY -, 3. THE CONTRACTOR SHALL WORK SOLEY WITHIN THE CONSTRUCTION LIMITS UNLESS OTHERWISE APPROVED HC -1 30' -0" 22.34 42'40'20" 175436.69 1310239.33 HC -2 150' -0" 156 -99 59.57'51" 175522.26 1310501.68 HC -3 125' -0" 49.15 22'32'41" 175414.89 1 1310621 -07 ,t q, , t v �- N x 48� CEDAR PROTECT TREE WITH RE -ROUTE IRRIGATION PIPE & FENCING, 3' MIN OFFSET � - Lowered ELECT ONDUIT TO ROSSING #�t' SEE UPPLEMEN L SPECIFICKTIONS AND NOTE 9/ �✓�\��. FC STA 0 +19- 5 q CROSSING #1 SEE TYPICAL CROSSING 2x00 N CONSTRUCTION LIMITS TYP /' 4 BEGIN GRAVEL CART PATH, APPROX FC SIA 2 +30' SEE TYPICAL GRAVEL PATH SECTION HC -2 PLAN, SHEET 10 y SEE NOTE 3 r raa ry- WITH CITY FOLLOWING LOWER FISH CHANNEL EXCAVATION. A _ 6. LOWER FISH CHANNEL DEFINED FROM FC STA 0 +19.32 START OF NEW CONSTRUCTION�cs /� b ~ '/' �'- %e -y ` ,y0 X�L� TO FC STA 14 +00.23. UPPER FISH CHANNEL DEFINED FC STA 0 +09.32 ° /'' j ' B -2' I ``� IC/ FROM MC STA 6 +68 TO MC STA 10 +00. SEE MATCH CHANNEL INVERT TO EXIST. /' B_1 r ;. j' - ', �/','` •\ ' *✓� j �'�_ - ,,• `� �'�P /� SPECIAL PROVISIONS. 2" G4ty jRR Lew d 6' X 4' BOX CULVERT INVERT F wee. ?b,..,e r" egad z i \ \ 2 +� DE>C' �Sy t� TrB. �\ G 7. HABITAT STRUCTURES LOCATED AT APPROXIMATE 'aC C / \ 5958 E / - / -' /' `� / v fFTf9> `� `\ �2�, C �\ Q �/" LOCATIONS. SEE SHEET 2 FOR LEGEND AND SHEET F6" 0,4,t. ry Lowe J S �1" / / ) 9� \ /� U 12 FOR DETAILS. CONTRACTOR TO LOCATE Tq , N � NEE ) RELOCAk- ,IRRIGATION /� F` /4 INDIVIDUAL STRUCTURES BY SCALING DRAWING IN LINE, SEE NbT €�- - - - Q •o. - CROSSING #2 �\ ` `° `� � CONJUNCTION WITH DIRECTION FROM THE CITY- +\ FC STA 2 +02.65 \ / ( ``\� {` O ��✓,� �� SEE TYPICAL CROSSING `� `? ,�O• � 3. FOR VEGETATION PLANTING AND RETORATION, SEE ` \\ j,., '..\, \ `.- / SHEETS 19 -22. PL -9N, SHEET 10 ` y ALIGN GRAVEL PATH\ x /� -�� \- �X 9. BURIED IRRIGATION SYSTEM PIPING AND ELECTRICAL TO NEW CROSSING C\ CONDUITS ARE SHOWN IN APPROXIMATE LOCATION. RELOCATE LINE- T per\ CONTRACTOR SHALL LOWER ALL PIPES AND CONDUITS / \ .,ate RELOCATE IRRIGATION / .F yF TO' PASS BELOW THE NEW CHANNEL WITH 12" MIMINUM HEADWALL CI - '�� LINE, SEE NOTE 9 FT D--C 11 COVER TO THE NEW CHANNEL. INVERT. IR2;3ATION t ?0.96 �..� F N ,t / �.;;_ 1 `9J �� I I' SYSTEM TO BE RESTORED TO A WATER TIGHT AND FUNCTIONAL STATE AS REQUIRED. 'C UTILITI CROSSING AND S :; t TRANSITION; SEE DETAIL 1, SHT 7 AND. ADDITIONAL DRAWINGS _.IG\ HC -3 0 FFN 6" PINE 20.0' 2.0' 10.0' 8.0' TOP OF BANK -� 4" OF CRUSHED GRAVEL CONSTRUCTION LIMITS EX IST rn F + 00 \ E 1 / SURFACING SEE NOTE 3 m' EX �' �, CONC BOX. C T ,L�S- Bu, /t N fer : T S PLAN A \' - I /EXISTING GROUND ® UPSTREAM FAC HEADWALL FC STA 0 +00 TO FC STA 4+75 / \ \\ N 175407.53 \ \� /. ARp .rb a,,so > /,.•yb _ , .�F / E 1310221.96 \ Ci7unn �°/ orerex eq Yq led 6 3' ono //� 3' dPe ar fhPn 1.u, \ e9, IE 65.86 Y P F SCAM 0' -, 10 20 40 FEET - COMPACTED SUBGRADE 1 CONTRACTOR TO �\ 2. / F- f .,{' �o•.�oe, -.,,. r •Y qu.eed fr cbn+.nc -i/ bed Sin oorsf /r�S.3f.rnr, 6f7s`•.L _� -..` I I / \ LOCATION AND INVERT. 3, M „• ,�+ war vq/r� .nrf4 // d /e.�/ - FOR FISH CHANNEL GEOMETRY EXCEP"T_AS _NOTED I SEE SHEET 9 T.O. HEADWALL. EL. 70.96 TYPICAL GRAVEL PATH SECTION EXISTING WSDOT CULVERT WINGWALL STRUCTURE; I -1- - NO SCALE APPROX GROUND LINE I.E. _ -65.86 TYPICAL SECTION A TYPICAL ''.SECTION B TYPICAL SECTION C S o' SEE NOTE 5 W Uai o 6 ;o o z W N O - 7B.. ........ .. ...... .... .... +. ...... ............. ........... ..... ... ....... ... ........ ..... ........ ................... .. s rn __: .......... H + 4- B 2 TOH 70 0 EXISTING GROUND _- ---- AT CHAN _ -__ -__ - -- - -_ - - -- _ - ------------- . . . . .. .... .. ........... .. ... ..�.I. 76 Z6403 ' - - O - N N h - " " - -- ­-----­----- - w a . .. -- _ ......... V .. - - -. W 72 ... ....... .. .......... .. T 0 PIPE..(UQW1) -!-':EL. 66.67- SITE PLAN LOCATION B-_ 3 �TOH '69 -7- " " " " - `� .. ............................ ... .......... .. ... ... ... ... ..............:................ .. -. - - ........... ............------------------------ =- -- -' - - --.._.- .....-- ------- - ------ - :.. PIPE TO BE RELOCATED - - - ..� 72 BELOW CHANNEi... .. . U I b ... B -1 TOH 66.6 Mi ul ...... - �I ANNEL INVERT - ... ... -i FLOW 68 - ............. a...... .... . - ....... ... w .. ..... �� .... .. ..... -.. FISH C _ ... ........... ... .......... .. ......... ... -- .. - ----- - - - - -- ---------- - - - - -- - - -_ - -- - .... . ............ _ y ..... ....... a . .. n: 0 Fr 6 64 ........ .........: ....... - ..... ------ .......... ...:..... ..... ... -- .................. .. ......... .......... .. .... ............ .. ......... ------ ...- .... -- ---........... ............... .. 4 _ _ 1...:: ._I 6 STREAMBED GRAVEL, LA THICK IMPERVIOUS APPROVED LAYER; SEE SUPPLEMENTAL - - _ - - -L 12" MIN. I. _ L, PROVISIONS of a � � � o - _ _ EXCAVATION �� a < w LIMITS, TYP. o a> m N o POS BY D DATE -6 -99 o a Z z �z �z oZ 3 > PROBABLE SILTY °o wA TL > _-- o o o o o o o �` SOIL/GRANULAR c, o � oF s �•� _ I o o m o o o NU m SOIL .BOUNDARY o �. �I e CITY �F ',RFiNTON W N N 3 0 > + °, + K O W ro ° SCALE 0 10 20 40 FEET A ss�ez 4 DEPARTMENT OF PUBLIC .WORKS In U Z0� N N- r7 I1I I I H oo x o O W of - co. BOTTOM OF ¢ via ~ co m P o W + _ ',+ u o + o o BORE HOLE (TYP) a a a co : °� Ec1siERE `w �.� z x w m F- o W 1- HORIZONTAL: 1" = 20' 0" c.) �2 O O W W O H O r.. �. N : V) u) Q ' J. W FWDO(, �a 0] N rr °w� o_ w ° Y o O SS /Dxat E�� MAPLEWOOD CREEK FISH ',CHANNEL PROJECT N w c~iim' cn .iri rn rz v) >.w W . W c�� crW `` I I I I a W ExaeES ' 12-21-99 SITE PLAN A AND PROFILE o a- N m x J SCALE 0 2 4 8 FEET > U t` VERTICAL:'' 1 4' -0" As - L3 ./f /JPY Owc / / -/q -.99' DESIGNED: CMG ,DATE: 7/1/98 FILE NAME: SHEET03 DRAWN DWH / DPT �:'V ?�� ?�� CHANNEL � PROFI C.._ : Engineers and Scientists I CHECKED: DW SCALE: AS SHOWN. Fl- 3 -E: /° - PROFILE Bellevue, Washington TEL- (425) 602 -4020 NO. REVISION BY APPR. DATE APPROVED: SHEET: 3 OF: 22 FAX: (425) 602 -4020 oAE�roR of o�a� woaks NOTES: SCANNED MAR 3 0 2000 1. THESE NOTES APPLY ALSO TO SHEETS 4 -6. �- I Y 2. FOR LEGEND, ABBREVIATIONS AND OTHER APPLICABLE ® NOTES, SEE SHEET 2. 11T' F.AIR',,AY -, 3. THE CONTRACTOR SHALL WORK SOLEY WITHIN THE CONSTRUCTION LIMITS UNLESS OTHERWISE APPROVED BY THE CITY. THE CONTRACTOR SHALL REPAIR, REVEGETATE AND IN ALL WAY RESTORE ALL AREAS OUTSIDE OF THE CONSTRUCTION LIMITS TO THEIR PRE- EXISTING CONDITION. A ^96 4. SEE UTILITY LOCATE INFORMATION TABLE ON SHEET yX � P 7 FOR EXISTING UNDERGROUND UTILITY INFORMATION. 5. ADJUST SEPARATE START AND END STATIONS OF - Q IMPERVIOUS LAYER DEPENDING ON ACTUAL SITE CONDITIONS. CONTRACTOR TO COORDINATE LIMITS PLAN, SHEET 10 y SEE NOTE 3 r raa ry- WITH CITY FOLLOWING LOWER FISH CHANNEL EXCAVATION. A _ 6. LOWER FISH CHANNEL DEFINED FROM FC STA 0 +19.32 START OF NEW CONSTRUCTION�cs /� b ~ '/' �'- %e -y ` ,y0 X�L� TO FC STA 14 +00.23. UPPER FISH CHANNEL DEFINED FC STA 0 +09.32 ° /'' j ' B -2' I ``� IC/ FROM MC STA 6 +68 TO MC STA 10 +00. SEE MATCH CHANNEL INVERT TO EXIST. /' B_1 r ;. j' - ', �/','` •\ ' *✓� j �'�_ - ,,• `� �'�P /� SPECIAL PROVISIONS. 2" G4ty jRR Lew d 6' X 4' BOX CULVERT INVERT F wee. ?b,..,e r" egad z i \ \ 2 +� DE>C' �Sy t� TrB. �\ G 7. HABITAT STRUCTURES LOCATED AT APPROXIMATE 'aC C / \ 5958 E / - / -' /' `� / v fFTf9> `� `\ �2�, C �\ Q �/" LOCATIONS. SEE SHEET 2 FOR LEGEND AND SHEET F6" 0,4,t. ry Lowe J S �1" / / ) 9� \ /� U 12 FOR DETAILS. CONTRACTOR TO LOCATE Tq , N � NEE ) RELOCAk- ,IRRIGATION /� F` /4 INDIVIDUAL STRUCTURES BY SCALING DRAWING IN LINE, SEE NbT €�- - - - Q •o. - CROSSING #2 �\ ` `° `� � CONJUNCTION WITH DIRECTION FROM THE CITY- +\ FC STA 2 +02.65 \ / ( ``\� {` O ��✓,� �� SEE TYPICAL CROSSING `� `? ,�O• � 3. FOR VEGETATION PLANTING AND RETORATION, SEE ` \\ j,., '..\, \ `.- / SHEETS 19 -22. PL -9N, SHEET 10 ` y ALIGN GRAVEL PATH\ x /� -�� \- �X 9. BURIED IRRIGATION SYSTEM PIPING AND ELECTRICAL TO NEW CROSSING C\ CONDUITS ARE SHOWN IN APPROXIMATE LOCATION. RELOCATE LINE- T per\ CONTRACTOR SHALL LOWER ALL PIPES AND CONDUITS / \ .,ate RELOCATE IRRIGATION / .F yF TO' PASS BELOW THE NEW CHANNEL WITH 12" MIMINUM HEADWALL CI - '�� LINE, SEE NOTE 9 FT D--C 11 COVER TO THE NEW CHANNEL. INVERT. IR2;3ATION t ?0.96 �..� F N ,t / �.;;_ 1 `9J �� I I' SYSTEM TO BE RESTORED TO A WATER TIGHT AND FUNCTIONAL STATE AS REQUIRED. 'C UTILITI CROSSING AND S :; t TRANSITION; SEE DETAIL 1, SHT 7 AND. ADDITIONAL DRAWINGS _.IG\ HC -3 0 FFN 6" PINE 20.0' 2.0' 10.0' 8.0' TOP OF BANK -� 4" OF CRUSHED GRAVEL CONSTRUCTION LIMITS EX IST rn F + 00 \ E 1 / SURFACING SEE NOTE 3 m' EX �' �, CONC BOX. C T ,L�S- Bu, /t N fer : T S PLAN A \' - I /EXISTING GROUND ® UPSTREAM FAC HEADWALL FC STA 0 +00 TO FC STA 4+75 / \ \\ N 175407.53 \ \� /. ARp .rb a,,so > /,.•yb _ , .�F / E 1310221.96 \ Ci7unn �°/ orerex eq Yq led 6 3' ono //� 3' dPe ar fhPn 1.u, \ e9, IE 65.86 Y P F SCAM 0' -, 10 20 40 FEET - COMPACTED SUBGRADE 1 CONTRACTOR TO �\ 2. / F- f .,{' �o•.�oe, -.,,. r •Y qu.eed fr cbn+.nc -i/ bed Sin oorsf /r�S.3f.rnr, 6f7s`•.L _� -..` I I / \ LOCATION AND INVERT. 3, M „• ,�+ war vq/r� .nrf4 // d /e.�/ - FOR FISH CHANNEL GEOMETRY EXCEP"T_AS _NOTED I SEE SHEET 9 T.O. HEADWALL. EL. 70.96 TYPICAL GRAVEL PATH SECTION EXISTING WSDOT CULVERT WINGWALL STRUCTURE; I -1- - NO SCALE APPROX GROUND LINE I.E. _ -65.86 TYPICAL SECTION A TYPICAL ''.SECTION B TYPICAL SECTION C S o' SEE NOTE 5 W Uai o 6 ;o o z W N O - 7B.. ........ .. ...... .... .... +. ...... ............. ........... ..... ... ....... ... ........ ..... ........ ................... .. s rn __: .......... H + 4- B 2 TOH 70 0 EXISTING GROUND _- ---- AT CHAN _ -__ -__ - -- - -_ - - -- _ - ------------- . . . . .. .... .. ........... .. ... ..�.I. 76 Z6403 ' - - O - N N h - " " - -- ­-----­----- - w a . .. -- _ ......... V .. - - -. W 72 ... ....... .. .......... .. T 0 PIPE..(UQW1) -!-':EL. 66.67- SITE PLAN LOCATION B-_ 3 �TOH '69 -7- " " " " - `� .. ............................ ... .......... .. ... ... ... ... ..............:................ .. -. - - ........... ............------------------------ =- -- -' - - --.._.- .....-- ------- - ------ - :.. PIPE TO BE RELOCATED - - - ..� 72 BELOW CHANNEi... .. . U I b ... B -1 TOH 66.6 Mi ul ...... - �I ANNEL INVERT - ... ... -i FLOW 68 - ............. a...... .... . - ....... ... w .. ..... �� .... .. ..... -.. FISH C _ ... ........... ... .......... .. ......... ... -- .. - ----- - - - - -- ---------- - - - - -- - - -_ - -- - .... . ............ _ y ..... ....... a . .. n: 0 Fr 6 64 ........ .........: ....... - ..... ------ .......... ...:..... ..... ... -- .................. .. ......... .......... .. .... ............ .. ......... ------ ...- .... -- ---........... ............... .. 4 _ _ 1...:: ._I 6 STREAMBED GRAVEL, LA THICK IMPERVIOUS APPROVED LAYER; SEE SUPPLEMENTAL - - _ - - -L 12" MIN. I. _ L, PROVISIONS of a � � � o - _ _ EXCAVATION �� a < w LIMITS, TYP. o a> m N o POS BY D DATE -6 -99 o a Z z �z �z oZ 3 > PROBABLE SILTY °o wA TL > _-- o o o o o o o �` SOIL/GRANULAR c, o � oF s �•� _ I o o m o o o NU m SOIL .BOUNDARY o �. �I e CITY �F ',RFiNTON W N N 3 0 > + °, + K O W ro ° SCALE 0 10 20 40 FEET A ss�ez 4 DEPARTMENT OF PUBLIC .WORKS In U Z0� N N- r7 I1I I I H oo x o O W of - co. BOTTOM OF ¢ via ~ co m P o W + _ ',+ u o + o o BORE HOLE (TYP) a a a co : °� Ec1siERE `w �.� z x w m F- o W 1- HORIZONTAL: 1" = 20' 0" c.) �2 O O W W O H O r.. �. N : V) u) Q ' J. W FWDO(, �a 0] N rr °w� o_ w ° Y o O SS /Dxat E�� MAPLEWOOD CREEK FISH ',CHANNEL PROJECT N w c~iim' cn .iri rn rz v) >.w W . W c�� crW `` I I I I a W ExaeES ' 12-21-99 SITE PLAN A AND PROFILE o a- N m x J SCALE 0 2 4 8 FEET > U t` VERTICAL:'' 1 4' -0" As - L3 ./f /JPY Owc / / -/q -.99' DESIGNED: CMG ,DATE: 7/1/98 FILE NAME: SHEET03 DRAWN DWH / DPT �:'V ?�� ?�� CHANNEL � PROFI C.._ : Engineers and Scientists I CHECKED: DW SCALE: AS SHOWN. Fl- 3 -E: /° - PROFILE Bellevue, Washington TEL- (425) 602 -4020 NO. REVISION BY APPR. DATE APPROVED: SHEET: 3 OF: 22 FAX: (425) 602 -4020 oAE�roR of o�a� woaks ro 0 OU n y �' w , lv x x 0 a w , � lv H o. r' SCANNED MAR 3 0 2000 w jL ® I( ro 0 OU n y �' w , lv x x 0 a w , � lv H o. r'