Loading...
HomeMy WebLinkAboutD-22661DN N ASPHALT CONCRETE ti N PAVEMENT CL B, 0.3' CL COMPACTION DEPTH z FT /Fi c MINIMUM / SLOPE SEESNOTE 5LEANOUT SLOPE lJ�al ` 6��G ��w �c E lv,W�J 1 /lls�'iil1= 11N= =HII CSBC, 0.5' MIN , � I' � / REMOVE CONFLICTING COMPACTED DEPTH 45° MAXIMUM SIDE SEWER EXISTING TEE NEW STORMWATER PIPE SEE NOTE 1 ASPHALT ACCESS ROAD RELOCATION ABOVE NEW STORM, P,PE (TYP) XX SEE DRAWING BELOW FOR DETAILS AND NOTES SCALE: NTS POSSIBLE CL EANOUT SEE NOTE 5 EXISTING SIDE SEWER NOTES: REMOVE CONFLICTING 1. INSTALL SADDLE IF EXISTING TEE IS NOT SIDE SEWER USEABLE FOR RECONNECTION. SADDLE W /6" TEE (ROMAC OR APPROVED EQUAL). SECURE TO NEW STORMWATER ��_CONNECT SIDE SEWER MAIN WITH STAINLESS STEEL BANDS. TAP THRU 3' MAXIMUM LENGTH PIPE _ /,� I ✓ADDLE. OF FIRST PIECE OF WITH ELASTOMERIC I 2. CONCRETE. BLOCK REQUIRED AT NEW SADDLE STRAIGHT PIPE �,, FLEXIBLE COUPLING WHEN ANG' -E AT MAIN EXCEEDS 25 °. SEE CITY BEND IF NEEDED INSTALL DETAIL DWG BR__'�9. 5% 4' REDUCER, 3. ALLOWABLE SIDE SEWER PIPE AND FITTINGS: EXISTING TEE IF NEEDED POLYVINYL CHLORIDE (PVC) SDR 35 OTHER SEE NOTE 1 MATERIAL, AS APPROVED BY CITY INSPECTOR: 1/8, 1/16, OR 1/32 4. FOR 3" SEPARATION INSTALL 1 'X 2' X 2" 0.02 FT /FT _ BENDS AS NEEDED THICK STYRENE FOAM BLOCK BETWEEN NEW MINIMUM SLOPE NEW 6" SIDE SEWER PIPE AND 6" SIDE SEWER RELOCATION. EXISTING FOAM BLOCK, SEE NOTE 4 5. IF SIDE SEWER P_LOCATiOIN REACHES CURB SEWER MAIN EXTEND NEW 6" SS TO BEHIND SIDEWALK AND INSTALL CLEANOUT PER CITY DETAIL DWG BR33. 6_ ALL SIDE SEWER RECONSTRUCTIONS SHALL SIDE SEWER RELOCATION (TYP) BE APPROVED BY CITY INSPECTOR. SCALE: NTS - XX 12" CPEP }N /12" CPEP N , TO POND jl TO POND 12" FROM N CB 17B 4 4., BEVELLED END + + SECTION 12" CPEP 12" FROM 12" CPEP _ TO DOWNSTREAM UPSTREAM TO DOWNSTREAM � FROM CB 17 CB 16 4 =-i 12 EXISl1NG REMOVABLE FROM UPSTREAM / REMOVABLE - ll PLUG, SEE PLUG, SEE 3' f °.o p ° %� NOTE 3. NOTE 3. SEE NOTE 2. ' 12 "" FROM - CB 16A 12" FROM - 112" EXISTING CB 17A - ` PLAN VIEW — CB16 PLAN VIEW — CB1I TRENCH EXCAVATION SEE DETAIL FOR PAVEMENT PATCH BACKFILL MATERIAL NATIVE IF IT MEETS SPECS, OR IMPORT PER SECTION 9 -03.19 (BANK RUN GRAVEL). NEW STORMWATER PIPE PIPE ZONE MATERIAL PER SECTION 9 -03.16 BEDDING MATERIAL FOR THERMOPLASTIC PIPE EXCAVATION OF UNSUITABLE SOIL (IF NEEDED) DEPTH AS APPROVED BY ENGINEER BACKFILL WITH FOUNDATION MATERIAL MEETING SECTION 9 -13.6 QUARRY SPALLS NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 90% MINIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE HAND TAMP ONLY. 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. - CPEP STORM PIPE TYPICAL TRENCH BEDDING AND BACKFILL �3 SCALE: NTS XX AT MANHOLE OR CATCH BASIN NOTES: 1111 REMOVABLE PLUGS INSTALLED 1. PIPE LOCATIONS AND DIMENSIONS ARE NOT IIII IN CB -16, 17 TO DIRECT FLOW INTO o TO SCALE AND ARE SHOWN FOR SCHEMATIC PURPOSES ONLY. THEY MAY VARY FOR EACH CB. DETE=NTION POND. FOR MAINTENANCE, CHANGE PLUGS TO 2. THE CENTERLINE OF 12 2 17 SHALL BE OFFSET AS IL FROM THE EXISTING 1" STORM PIPE TO THE BLOCK OFF POND AND DIVERT FLOW E -BUm AST TO THE DIMENSIONS SHOWN. TO DOWNSTREAM SYSTEM CUT PIPE END 3. REMOVABLE PLUG SHALL BE FOR 12" CPEP NOTE: _ ADS #1233AA OR APPROVED EQUAL _" F IF THERE IS NO CHANNELING FOR THE PIPE BEING PLUGGED, `" STEEL TROWEL THE PLUG TO A SMOOTH SURFACE CONFORMING DETAIL - CATCH BASINS 16 AND 1 TO THE INSIDE SURFACE OF THE MANHOLE OR CATCH BASIN. XX IF THERE IS CHANN _L:,NG, FILL THE CHANNEL FOR THE PIPE SCALE: NTS MANHOLE 0 LE AND CATCH BEING PLUGGED WITH CONCRETE. STEEL TROWEL ALL EXPOSED _ Reid yo NEW CONCRETE SURFACES SMOOTH. ° BASIN PENETRATION AND RECOMMENDED =r FOR APPROVAL ORIGINAL PLANS STAMPED BY: FLEXIBLE JOINT D ETA I L PIPE PLUGGING DETAILS BY DANIEL CAREY 5/28/03 WYMAN REID ADAMS ON 5/27/03 RONALD STRAKA 5/28/03 `` PE #39578 EXPIRES: 4/25/04 SCALE: NTS XX SCALE: NTS XX BY P'RFs C "�«` ""° H2M HILL AS SHOWN xoMoMO¢ "'°' ' CITY OF N.E. 10th STREET /ANACORTES AVE. N.E. °°'°°' AIL °� °PNM` R. CHUNG REN TON DETENTION POND AND STORM SYSTEM J. PREPS i IMPROVEMENT PROJECT CH2MHILL AS —BUILT INFO AND NOTED ADDED BY CITY OF RENTON DWC 7/20/04 c� Q� � �A��M Planning/Building/Public Works Dept. DRAINAGE DETAILS R. ADAMS c nor am .cx I M,0. REVISION BY DATE APPR �mo`m 9° E'O°°1°"0° T. PLAT7N MAY 2003 Me u ■e DD -1 air: 16 X17 4 SCANNED OCT 0 $ 2fsF - -- t Rol t„ MAY 2003 Me u ■e DD -1 air: 16 X17 4