Loading...
HomeMy WebLinkAboutD-247701Item No. 1. Rock riprap bank protection upstream and �\ downstream of private bridge. l� Item No. 2. See above. Item No. 3. Remove trees overhanging stream. Leave stump in place. e' r—'-� Item No. 4 Remove overhang trees. Leave stump in place.. Item No. 5• Remove slide from stream bed: Item No. 6• Remov3 small trees and debris from stream 2 6 bed. Item No. 7 Rock riprap bank protection on right hand side of stream. Remove gravel deposits from stream bed. �� 5T Item No. 8. Remove trees and debris from stream. 2 .46th Item No. 9 and No. 11. Remove trees and mudslide from stream bank. N• '� Item No. 10. Remove debris from the stream bed. Item No. 12. Remove debris and trees from stream. Item No. 13. Remove trees and mud slide from stream bank. Item No. 14. Remove overhanging trees and log from stream. w ' Q w e � Item: No. 15: Install rock riprap bank protection adjacent 0 Jones Avenue N.E. ® 2 Item No. 76. Install rock riprap bank protection adjacent Jones Avenue N.E. a 2 ST- a Z Oy } .36th ST' j 0 o N E. 0 O ,V N' a z ST• 5T. W - 0 Z N• E i 361h v 2 3 34'th N- N• ' C 5T• W 34th r N 1S g PL. ? 33rd �. N. E. e. - -- - S-f . N. \J II r ST. r R.R. m N' - - N 3Ot N � ST. OOAS� 3 tst 5T P�GtftC NO. REVISION Bl i smae'd,-00.