HomeMy WebLinkAboutD-2690291' 1
LEGEND
FILE NAME
TIME
DATE
PLOTTED BY
DESIGNED BY
ENTERED BY
CHECKED BY
PROD. ENGR.
REGIONAL ADM.
EXISTING CONTOUR
RIGHT OF WAY
WETLAND BUFFER
RETAINING WALL
BARRIER
GUARDRAIL
IMPACT LINE A\
WV
BRIDGE PIER
FUTURE BRIDGE PIER
C: 1Work\ ProjectWisel6TJV00021dms022691BT
1:27:26 PM
8/19/2010
kxla - --
K. LAMINACK
F. ELGHARABLI
F. GROZNIK m AS -BUILT
L. HODGSON IFC
D. DYE
T. 23 Nov R. 4 E., W.M.
PS MIT 405- AB.dgn CIO ST. J
ENO. GION STATE FED,AID PROINO. Q� of WAsy,
�'A
10 WAS °z
i
JOB NUMBER
97 O
T�
EN
716110 MSj CONTRACT NO. LOCATION NO.
5122108 FG
C -7295 DATIE
REVISION DATE BY P.E. STAMP BOX
P.E. STAMP BOX
DATE
Mw
Mw
.. STABILIZATION
0 26 50
SCALE IN FEET
1. ADJUST HIGH VISIBILITY FENCE TO INCLUDE AREAS IMPACTEN'
BY
1 AT Imo, Washington State WrAr Department of Transportation
Corridor Program - -
DAVID EVANS
ILFINGER BERGER ®® A ®ASSOCIATESmc.
Q 415 - 118th Avenue SE
Bellevue Washington 98005 -3518
Civil Inc. Phone: 425.519.6500
ffffj= FA =I TRI -STATE CONSTRUCTION, INC
qw"aE e"ty"ting