Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
D-269203
a u . . 100 kU.OFF -RAN ES 3 ES 3 0 q r5 RWOB(SEE NOTE 0) b 6 [ E%5._4 s 5 d 1 d �.E] , SOUTHBOUND NOS q EXISTING 13 SORM DRAIN 1240 TO REMAIN SEE �ILE — +— E99 3 E99 E12 -� SHEET DP -0-09 i LL x 1235 1240 — s _ _ yr _ E95 {'^h, a 14 g 'EE i TO TING M7 YSTORM GRAIN FR iiu SEE NOTE 2 SEE PROE ] g "' ° - Xb SHEET DP-0-10 , a t 8 R MILLL L AVE 8 �__- i}_°.'ts li i�d'_ _ !. .J NOTES: r–'• '" ., "' {4 �` �–(' t�'I.`. j 4 L� {�((4� – 1. SEE SHEET DR "l G _ t_..� i�_� i�I_.J.. 1ni- ...L_� �- �t–� 7 FOR .DRAINAGE GENERAL 2. WEEPVDa , DRDa14, _ -. ±i _. AND ROADWAY SECTIONS FOR DRAINAGE BEHIND BARRIER ° —E — — WE MIAINING WALL PLANSm CONSTRUCTION NOTES: R (. FAR UNDERDRAIN DETAILS 1❑ DRAINAGE E STRUCTU O FJOSTN6 0❑ AND ADJUST TO MISTING FINISHED GRADE.SOLID COVER EXSTING PROPOSED J - _ 0 MANHOLE OR CATCH BASIN 1 2 AT RETAINING WALLS 2❑ .REPLACE E=ING GRATE WITH VANED Q REMOVE EXMMIG DMINAGE STRUCTURE AND "'"' - -"" –' ':ST —ST— STORM GRAIN TYPE 2 WIN CIRCULAR : LPROWDI: SLOPE PROTECTION GRATE AS PER SO PLAN BJ 00 CONNECT UNDERDRAWB. FRAME AND .COVER WITH QUARRY k SPALLS AND - OP —DP— DRAIN PIPE BETWEEN RWEA AND AND ADJUST O G DRAINAGE GRADE ❑S INSTALL UNDERDRAWB AND CONNECT TO pC•C• CLEANOUT E%18TMG RETAINING WALL 4 S DRAINAGE STRUCTURES PER DETAIL . ,.°. _ x _ _ ABANDON EXISTING OMINAGE STRUCTURE,UD —UD— UNDERDRAIN PIPE PER SECTION T- W.9121 OP THE STANDARD SHEETS DRPPOS AND DROIG - ---- -a ° • PITCH SPECIFICATIONS. O ABANDON AND FILL CAL SPECIFICATIONS. NG DRAINAGE c_. _. _.-- .....: CULVERT O REMOVE EXISTING DRAINAGE DR STRUCTURE POE PER TECHNICAL BPECIFM.ATONS. 0 ffi� 'ate °ez RETAINING WALL SEE NOTE 14 ON SHEET ARGAL9. 10 CONNECT EXISTING ME TO NEW MET. O CATCH BASIN TYPE 1 AND 2 © EXTEND PIPE AS NECESSARY O CONNECT WITH GRATE OR CONCRETE INLET ROCK PAD EXISTING PIPE TO NEW DRAMOE ~ STRUCTURE 2 m GRATE INLET TYPE 2 ® MEGA FILLER GRAIN a w 1w BALE IN TEEr 0.ADAW mxmnGio PACRA E: 7624 RFC -3D 1.405 DR•004 1.5 TO SR 169 Sfax STAGE 2 -WIDENING 1Bporta0on AND SR 515 INTERCHANGE DRAINAGE PLAN t