HomeMy WebLinkAboutD-271112T
T
N
f\
N
05 I
x
2
a
s
a
s
s
s �
f �
�)Am
i
M
•P 3 38 p 'W
ON AL L
s R glo" ti�
EXPIRES. 8 /20/2007 1
429 ray 8z Oborrie, Iac..
CONSULTING ENGINEERS
701 DEXTER AVENUE NORTH SUITE 200
SEATTLE, WASHINGTON 98109 (206) 284 -0860
Rol
REVISION
BY I DATE I APPR
SURVEYED:
DESIGNED:
B.B.
DRAWN: P.M.
CHECKED.
S.C.
APPROVED.
B.B.
AS SHOWN
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL NAVE) 1988
HORIZONTAL• NO 1983/1991
DATUM
1. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO
THE CITY FOR REVIEW AND APPROVAL.
AT LEAST ONE LANE OF S RENTON VILLAGE PL SHALL BE
KEPT OPEN FOR TRAFFIC DURING CONSTRUCTION HOURS.
BOTH LANES SHALL BE OPEN TO TRAFFIC AFTER
CONSTRUCTION HOURS.
2. -
3. THE CITY MAY REQUIRE THE CONTRACTOR TO ADJUST THE
TRAFFIC CONTROL PLAN, WORK AREA, AND PARKING LIMITS AS
NEEDED TO MAINTAIN BUSINESS ACCESS AND PARKING.
4. AREAS OF PARKING LOT NOT BEING USED BY THE
CONTRACTOR SHALL BE RETURNED TO PARKING USE FOR THE
BUSINESSES.
5. THE CONTRACTOR SHALL NOTIFY THE CITY AND PROPERTY
OWNER AT LEAST 7 DAYS IN ADVANCE OF USING A WORK
AREA AND BLOCKING OFF PARKING.
6. THE CONTRACTOR IS RESPONSIBLE FOR PLACING NO PARKING
SIGNS AND TEMPORARY FENCING FOR ALL WORK AREAS.
NO PARKING SIGNS SHALL BE PLACED AT LEAST 2 DAYS IN
ADVANCE OF CLOSING A PARKING AREA.
A. CONTRACTOR STAGING AND STORAGE AREA.
MAXIMUM AREA THAT MAY BE USED DURING THE PROJECT.
B. AREA MAY BE TEMPORARILY CLOSED DURING CONSTRUCTION.
AREA SHALL BE REOPENED TO TRAFFIC AND PARKING AFTER
CULVERT CONSTRUCTION PASSES IT.
C. PLACE TEMPORARY PATCH OR STEEL SHEETING ON AREAS TO
REOPEN TO TRAFFIC AND PARKING.
D. CONTRACTOR SHALL KEEP AT LEAST ONE LANE OF STREET
OPEN TO TRAFFIC DURING CONSTRUCTION.
E. PLACE SIGN "CONSTRUCTION AHEAD"
"LOCAL TRAFFIC ONLY"
"EXPECT DELAYS"
o
F. THIS AREA MAY BE TEMPORARILY CLOSED AND USED FOR
STAGING AND STORAGE FOR CULVERT CONSTRUCTION BETWEEN
D
r
STATION 15 +00 AND THE 144" CATCH BASIN.
711
�
N
THE AREA MAY BE USED FOR TEMPORARY STAGING AND
AND
,
STORAGE FOR THE SEWER ENCASEMENT WATER LINE,
RELOCATION.
x
THE AREA WILL BE REOPENED FOR PUBLIC PARKING AFTER
d
N
EACH OF THOSE WORK ITEMS ARE COMPLETE.
G. AREA MAY BE CLOSED TO TRAFFIC AND PARKING DURING
CONSTRUCTION. AFTER CULVERT CONSTRUCTION PASSES THE'
AREA PLACE A TEMPORARY PATCH AND REOPEN IT FOR
TRAFFIC.
D- 271112
RECOMMENDED FOR APPROVAL
By: ------------
-- - -- Date: ------ -
BY: ---------- - - - - -- Dater------ -
By`---------- - - - - -- Dater- - - - - --
MEMENNEN
% - CITY OF RENTON VILLAGE STORM SYSTEM PROJECT Fl &DBOM*
R E N TO N PAGE
DRAWING NO.
Planning /Building /Public Works Dept.
WORK AREA AND LIMITS �E—U- 12 OF* 12