I. PUGET SOUND ENERGY OVERHEAD POWER LINES TO REMAIN, COORDINATE ELEVATION
OF LINES AND NESC CLEARANCE REQUIREMENTS WITH PUGET SOUND ENERGY,
N NO OUTAGES SHALL BE PERMITTED FOR TRANSMISSION LINES.
CONTACT: GARY MUELLER (206) 521 -5218
2. TEMPORARY OUTkGES FOR TEMPORARY OVERHEAD FEEDER SHOWN ON PLAN WILL BE
EP.;E (-)F WATER PERMITTED WITH TWO WORKING DAYS NOTICE TO PUGET SOUND ENERGY.
E[►�,E -)F WATER CONTACT: BRIAN SWART ( 253) 395 -6839
3. FOR CITY OF RENTON SANITARY SEWER RELOCATION SEE DRAWING C45.
i
r%
4.' FOR WATER LINE RELOCATION, SEE DRAWINGS C46 -C48.
/,5, ,BURIED POWER, TELECOMMUNICATIONS, AND GAS RELOCATION BY OTHERS.
'CONTACTS: POWER; PUGET SOUND ENERGY, BRIAN SWART (253)395 -6839
TELEPHONE; QWEST COMMUNICATIONS, DENNIS LIBADIA (206)345 -4484
FIBER OPTICS; MCI- WORLDCOM (REPRESENTING SPRINT, BSNF, ATT, MCI
AND WORLDCOM FOR JOINT RELOCATION PROJECT),
MICHAEL FULMER (253)872 -4005. LEVEL 3 COMMUNICATIONS,
j ' ! JERRY STORY (970)209 -44 el GAS; PUGET SOUND ENERGY, RANDY BUSCH (425 224 -21HIGH PRESSURE FUEL; BP (OLYMPIC PIPELI AND E PO (425)235 -7746
j 6. ALL 12" UNDERDRAIN PIPE SHALL BE PERFORATED CORRUGATED POLYETHYLENE (PE)
WITH SMOOTH INNER WALL. ALL 6 UNDERDRAIN PIPE SHALL BE CMP.
i A
i� 7. EXCEPT FOR UNDERDRAINS AND DETAIL ON C33, ALL DRAINAGE AND UTILITY TRENCHES
INTO CDSM SHALL BE BACKFILL WITH CDF TO ORIGINAL LIMITS OF CDSM,
F.0R b --SEA PROF US ON DRAWINGS C34 TO C36.
ulF= - --+- - -- F --
,. - - --- P - --- -- G G
C
N
-- W w
0 - — W - - — W - -- - W W W W
23 +00 A - IINF 24 +00
N
M
U
W (31
s s - -- s s -
V _--- G
W T T T - T --
z ®iv
Z
V
F_
Q
i"
P __
-
r-
D
I
BL..IC WC>1R11<S DEI-'''r.
o : _ = "; s� — ENGINEERING— STREETS — WATER — SEWER -- PARKS— BUILDING—
s _ �
1908
iawl Sowed on OW No!* 1e 2= al al a" oy era, Fie Nome. v LlOX Nom+ ICAW 10*fs Ic -.UarV Sc** &
REQUIRED CDF BACKFILL ZONES
GRAVEL BACKFILL
FOR DRAIN
TOP OF CURB /SIDEWALK
GUTTER FLOWLINE
CB STATION
LEFT RIGHT
CDF BACKFILL ZONES
REQUIRED
MD
2/20/01
ZONE 1
ZONE 2
ZONE 3
ZONE 4
14+11
LEFT
RIGHT
X
X
X
X
X
X
X
15+70
LEFT
X
RIGHT
X
18 +07
LEFT
X
RIGHT
X
19+51
LEFT
X
X
X
X
RIGHT
X
X
X
OD 28203
fWd bk no
CONSULTANTS
BERGER/AB"
E Y 3' h_: a N ;,
ZONE 2: BACKFILL
CATCH BASIN EXCAVATION
WITH CDF U P TO
PREFABRICATED DRAINAGE
MATERIAL
ZONE 1: BACKFILL TRENCH AND
CATCH BASIN EXCAVATIONS WITH
CDF UP TO 0.1' BELOW PIPE
PERFORATIONS '
33301 9TH AVENUE SOUTH
FEDERAL WAY, WASHINGTON
98003 -2600
VOICE: (206)431 -2300
FAX: (206)431 -2250
TYPICAL
TRENCH
SCALE: N.T.S.
z
Q
W
CL
Q
PLAN
N.T.S
W
WZ(n
--j _J
V) W Q
W
�aW LL. zW -° O
O � W Z F—
Z ._i
to
V) Z
rA'*s\SECT10N
Is I �-,- J_ N.T.S
)NC. SLAB
J
<FILL
TRENCH
PREFABRICATE
DRAINAGE
MATERIAL
STRUCTUAL CONC. SLAB
ZONE 3: BACKFILL
FULL DEPTH OF TRENCH
WITH CDF
�-- GRAVEL BACKFILL
0.1' BELOW PIPE FOR DRAIN
PERFORATIONS
NOTE:
CONTRACTOR SHALL CONSTRUCT FORMS
AS NECESSARY TO PREVENT CDF FROM
EXCEEDING LIMITS SHOWN.
CDF BACKFILL FOR UNDERDRAIN TRENCH
AT LIMIT OF STRUCTURAL SLAB,
DRAINAGE AND UTILITY PLAN
SHEET 2
__mmm�
SOUTH 180th STREET GRADE SEPARATION
ROLL 0.q1 F R 121
20 0 20 40
scale feet
R *Az; RECORD COPY
ADDENDUM NO. 3
no I date revisions
C33
____ -1
H
IN
O
U
shoot 35 of 144
job no A00084
— . scale -- 1"m20'
date 20— Fob -2001
'--:5'tl4f.--.Z , ?— S
0
C
a
c
z
w '
Z M
1
h
C
C-
4
4
by
I
date
designed
MD
2/20/01
drawn
BJA
2/20 /01
checked
GLP
2/20/01
pro j eng
CCW
2/20 /01
proj dir
GLP
2/20/01
fWd bk no
CONSULTANTS
BERGER/AB"
E Y 3' h_: a N ;,
ZONE 2: BACKFILL
CATCH BASIN EXCAVATION
WITH CDF U P TO
PREFABRICATED DRAINAGE
MATERIAL
ZONE 1: BACKFILL TRENCH AND
CATCH BASIN EXCAVATIONS WITH
CDF UP TO 0.1' BELOW PIPE
PERFORATIONS '
33301 9TH AVENUE SOUTH
FEDERAL WAY, WASHINGTON
98003 -2600
VOICE: (206)431 -2300
FAX: (206)431 -2250
TYPICAL
TRENCH
SCALE: N.T.S.
z
Q
W
CL
Q
PLAN
N.T.S
W
WZ(n
--j _J
V) W Q
W
�aW LL. zW -° O
O � W Z F—
Z ._i
to
V) Z
rA'*s\SECT10N
Is I �-,- J_ N.T.S
)NC. SLAB
J
<FILL
TRENCH
PREFABRICATE
DRAINAGE
MATERIAL
STRUCTUAL CONC. SLAB
ZONE 3: BACKFILL
FULL DEPTH OF TRENCH
WITH CDF
�-- GRAVEL BACKFILL
0.1' BELOW PIPE FOR DRAIN
PERFORATIONS
NOTE:
CONTRACTOR SHALL CONSTRUCT FORMS
AS NECESSARY TO PREVENT CDF FROM
EXCEEDING LIMITS SHOWN.
CDF BACKFILL FOR UNDERDRAIN TRENCH
AT LIMIT OF STRUCTURAL SLAB,
DRAINAGE AND UTILITY PLAN
SHEET 2
__mmm�
SOUTH 180th STREET GRADE SEPARATION
ROLL 0.q1 F R 121
20 0 20 40
scale feet
R *Az; RECORD COPY
ADDENDUM NO. 3
no I date revisions
C33
____ -1
H
IN
O
U
shoot 35 of 144
job no A00084
— . scale -- 1"m20'
date 20— Fob -2001
'--:5'tl4f.--.Z , ?— S
0
C
a
c
z
w '
Z M
1
h
C
C-
4
4