Loading...
HomeMy WebLinkAboutD-286208V 7 C •Q C v 0 v V u U E c u E V 0 L u >° u V O t C 0 C O v E 0 u r 0 a C 0 III 0 C 0 v u 0 N 0 z 0 C D U to C. vi u a v r U v 0 0 ID N a 3 s .3 u V C v v 0 V V v c _U 'c 0 V V Z C :3 Q A O r Rjl� x I I R NORTH WALL CAP OOIIIIIII`IIIIIII�t.OeIIIIIII���� 2" P VC TO IRRIGATION & CONTROL WIRES r PUMP DISCONNECT - - - - - -- - - - (SEAL –OFF) VAULT -- PRE– ENGINEERED U ACCESS ROAD SEE SPECIFICA N - - - -.- , ►,, -- __ -- _ ,,,, - -- _ _ -'_ -. - -_ -_ -_ _ -- - - --- -- PRECAST CONCRETE VALVE VAULT N MOVE SEE SPECIFICATIONS [TYPE III i SD �� / 6" SLEEVE PROPOSED UTILITIES Z SD 7 SD SD ..._SD A -LINE - D 18+70(50.0' LT) N T WELL CENTER 0 CRETE WE -_ - - -- ; 1 SD SD BOLLARDS 3/4" HOSE BIB CONDUITS 6 UNDERDRAIN A –LINE 18 +07(45 LT) _ - MOUNT TO WALL BY PSE 10'0 STEEL CASING I , �� r _ }_ � --- -�'; � 8 � D.I. "YARD GENERATOR ' HYDRANT 5' CONCRETE PAD UTILITY CDSM LIMIT PRECAST WET WELL I j r--- -- fi ! _ -- SEE DETAIL CONTROL 10x16 VAULT SEE SPFCIFICATIONS r`"— ^ �� ` -� t. VALVE VAULT CENTER C ) BUILDING A —LINE 18 19 60 46 31 LT CONCRETE PAD POWER YARD LIGHT ( ) FOOTING PERIMETER MOVED � 1 TELEMETRY POLE NEW 4 4' A / C40 UD UD UD UD —UD UD UD UD UD UD UD U D bD D U UD UD UD UD ----U UD UD UD -- -- ----UD UD ---UD UD – UD - UD UD o METER / ter•, ,r •�, `c _ / , 1 j . , �'` ,. , ,1l � 1{ 1,Y � ! , � i ! 1 x { I ,1 / '� ,, 1{ r t i '`� ` �. � i I , !' `,� �' r \ { �, � { . `\ / 1•. �/ ,1 /• { ! t ``j j ' � `'{ { . /.` ..` _ r V� _ r / / / i _ter ` ` •'. —x— --x— —x— 7c— —x— —x- —x— ic— —=x x---- —�c— —x=— --x— x— =- c ��— —x----x'— x =x— —x— —�t— =x— —x— —x— --x— —x- -x —x -- —x — -x —x — =x =— —x —x -- x — x — —x =x — —x -- —x --- —x — —x — _x -- —x — —x =– - 15 A —LINE CB SIDEWALK cn 18 +fi0(40.0' LT) 1. E. = 1.4 SEE DRAINAGE PLAN AND DRAINAGE PROFILE UD UD UD UD UD UD UD UD UD U UD UD UD UD UD UD D UD UD D UD UD UD UD UD D . UD UD UD UD UD UD UD 17+ 50 1 s +oo 26' ______ 18+50 A –LINE (MARY SHAFT CDSM STEEL CASING (� SOUTH 180TH STREET) CORE DRILL THROUGH PR , LEAN CONCRETE, AND WET WELL. INSTALL 12" STORM DRAIN. BACKFILL WITH NON– SHRINK GROUT. CHECK FOR AND REPAIR ANY GROUNDWATER LEAKS. BACKFILL TRENCH INTO CDSM, INSIDE PRIMARY SHAFT, WITH CDF TO FINISH GRAD GENERATOR PAD REVISIONS – CONTROL BUILDING / PUMP STATI.ON NOTE: I. BASE SIZE & DETAILS CHANGED ARE ONLY SHOWN HERE. FOR ADDITIONAL DETAILS OF BASE SLAB & CONDUITS ETC. REFER TO SHEET C41C 2. ADJUST REBAR DETAILS TO FIT NEW SLAB DIMENSIONS. USE #4 REBAR ON 12" CENTERS, EACH WAY, TOP & BOTTOM 3. CONTRACTOR TO PLACE SPECIFIED CONDUITS BASED ON LOCATIONS RECOMMENDED BY GENERATOR SUPPLIER. 4. PROVIDE TWO ADDITIONAL CONDUITS THROUGH GENERATOR PAD FOR FUTURE USE. r-o", N GENERATOR HOUSING VENT END CONCRETE �I 1 BASE SLAB 10'x10' CONTROL BUILDING ELEVATION �� 1 11 A 1►1 CTRICAL III \\\g*I L,4 LJBLI� WC)1z11<S DEPT'. P p s — ENGINEERING — STREETS — WATER — SEWER— PARKS- 6UILDING- � 1'f Z J n Y• O 1908 L cast Sowd an OW May /B 2M Of OJ 0" Dy 10►r fk Mane. 0 POW IA"N ICAAO I dOw I C- ja oily ScOO S r RIM EL 27.20 'Rf W,f :j LIOX. Vt EL 26.5± 10'W STEEL CASING 7'0 WET WELL EL –5.8 BOTTOM OF WET WELL EL —29.0 G� It Q rAj PUMP DISCONNECT (SEAL —OFF) VAULT ANY SIZE NOZZLE UP TO 2 1/20' NST IRON NOZZLE GAP LOCKING TRAFFIC BREAK –AWAY COUPLING R COVER BRASS OPERATING SCREW R EL 27.13 RIM EL 27.0E BRASS PACKING NUT L 26.70 OP F PACKING NUT iur OF GENERATOR SLAB IRON TOP CAP EL 26.5f CONTROL BUILDING SLAB 2' PIPE BRASS CONNECTION NUT OPERATING ROD BRASS PLUNGER T TE HRUST ��– SEAT RUBBER BLOCKING I � / —BRASS VALVE WITH I.E. 23.51 VALVE VAULT — r 2" FIP INLET 6 "b UNDERDRAIN THRUST BLOCKING #77 MAINGUARD HYDRANT 0 SCALE: N.T.S. —LEAN CONCRETE CONSTRUCTION NOS: I, EXCAVATION FOR WET WELL SHALL BE ACCOMPLISHED BY AUGERING TO MINIMIZE AREA OF EXCAVATION AND INSIDE BOTTOM ELEV = —4.87 VOLUME OF DEWATERING. VALVE VAULT MAY BE INSTALLED USING OPEN TRENCH EXCAVATION METHODS. R 2. REFER TO SOILS BORING INFORMATION PRIOR TO DRILLING 10 —FOOT DIA SHAFT. SEE SPECIFICATIONS. 3. CORE —DRILL ALL VAULT PENETRATIONS, GROUT WATERTIGHT AFTER PIPE INSTALLATION. NO FITTINGS OR LEAN CONCRETE FASTENERS SHALL BE INSTALLED WITHIN 4" OF GROUT P CK. 4. WET WELL AND VALVE VAULT TO BE CONTRACTOR DESIGNED AND CONSTRUCTED. CONTRACTOR SHALL PROVIDE REINFORCING AS REQUIRED TO WITHSTAND DESIGN FORCES AND SHALL PROVIDE REINFORCING REQUIRED TO WITHSTAND THE ADDITIONAL FORCES IMPOSED BY THRUST BLOCKING. THE BASE OF THE VAULTS SHALL BE DESIGNED TO WITHSTAND BOUYANCY UPLIFT FORCES. DESIGN GROUNDWATER ELEVATION SHALL BE n Fi +�n nn DURING CONSTRUCTION I C1N etin �� �.�� n c-np COMPLETED ►�T WELL �« SPECIFICATIONS � � �„T � „��� �„o _ �� �� �� �... ........... . v.. ....v �� . �v v FOR vv���� LL � Lv WET ♦1LLL J�.L JI- LV 1 f 1 l,/'� 1 1 VI`/J f VR A0 ADDITIONAL INFORMATION. a A ,-- ELEVATION by date CONSULTANTS designed MD 2/20/01 drawn 8JA 2/20/01 -' 33301 9TH AVENUE SOUTH checked GLP 2/20/01 FEDERAL WAY, WASHINGTON pro j en g CCw 2/20/01 BERGER /ABAM 98443-2600 pro j dir QP 12/20/01 E '� h _ _ a s VOICE: (206)431 -2300 fidd Ok no FAX: (206)431 -2250 ROLL 0,1 (• HOSE BIB PER 9 -15,10 STANDARD SPEC) DRAINAGE DETAILS SOUTH 180th STREET GRADE SEPARATION e j. 126 5 0 5 10 1 "= 5' scale feet e9/2ft �. R ECORD COPY 1/0 ADDENDUM NO. 3 no date revisions • C38 sheet ao of 144 O ins U job no A00084 scale 10=20'H. 1 "= 5' V date 20— Feb -2001 / u h r -. r r C. a >N V �' •y r > x >N r c N ^�� P ♦1LLL J�.L JI- LV 1 f 1 l,/'� 1 1 VI`/J f VR A0 ADDITIONAL INFORMATION. a A ,-- ELEVATION by date CONSULTANTS designed MD 2/20/01 drawn 8JA 2/20/01 -' 33301 9TH AVENUE SOUTH checked GLP 2/20/01 FEDERAL WAY, WASHINGTON pro j en g CCw 2/20/01 BERGER /ABAM 98443-2600 pro j dir QP 12/20/01 E '� h _ _ a s VOICE: (206)431 -2300 fidd Ok no FAX: (206)431 -2250 ROLL 0,1 (• HOSE BIB PER 9 -15,10 STANDARD SPEC) DRAINAGE DETAILS SOUTH 180th STREET GRADE SEPARATION e j. 126 5 0 5 10 1 "= 5' scale feet e9/2ft �. R ECORD COPY 1/0 ADDENDUM NO. 3 no date revisions • C38 sheet ao of 144 O ins U job no A00084 scale 10=20'H. 1 "= 5' V date 20— Feb -2001 / u h r -. r r C. a >N V �' •y r > x >N r c N