HomeMy WebLinkAboutD-28620Di
4i
v
c
v�
10
C
v
C
0
0
V
E
c
E
0
0
10
u
r
v
10
0
c
c
o�
U
0
v
a,
r
c
0
C
v
E
c
0
L
w
0
C
v
0
C
0
v
a�
v
V
v
N
Ic
0
r
U
ai
a
v
r
U
c
v
0
0
N
co
rn
U
Q
3
r
.3
c
v
L_
0
v
v
C
'v
u
`c
0
0
O
c
�A
v
r
N OTEI
1. ADJUST /SIZE OVER HEATER ELEMENT TO PROTECT THE
ACTUAL MOTOR FURNISHED.
2. PROVIDE CONTROL POWER TRANSFORMER SIZED FOR THE
ACTUAL LOAD SERVED BY SECONDARY TRANSFORMERS.
3. UTILITY METER AND MAIN DISCONNECT SHALL BE MOUNTED
ON CONTROL PANEL ENCLOSURE. INSTALL METER BASE AND MAIN
DISCONNECT AS PER PUGET SOUND ENERGY STANDARDS.
4. PUGET SOUND ENERGY SHALL PROVIDE IN ADDITION TO PRIMARY
CONDUITS AND WIRES, THE SECONDARY RUNS FROM THE
TRANSFORMER TO THE POINT OF CONNECTION AS SHOWN ON DRAWINGS.
CONTRACTOR SHALL COORDINATE WITHPUGET SOUND ENERGY PRIOR
TO CONSTRUCTION.
5. CONTRACTOR SHALL COORDINATE WITH PUMP SUPPLIER AND
PROVIDE CONNECTIONS FOR PUMP MONITORING UNIT (PMU).
6. CONTRACTOR SHALL COORDINATE WITH PUMP SUPPLIER AND
PROVIDE REQUIRED PENETRATIONS AND SEAL OFFS IF THE CONTROL
CONDUCTORS ARE NOT INCLUDED IN THE POWER CABLE.
7. LEVEL TRANSDUCER SHALL BE SUITABLE FOR
CLASS ONE DIVISION 1 LOCATION.
CONDUIT SCHEDULE
N.
R P:
CON.
RUN:
FROM:
TO:
VIA
FOR
SIZE:
CONDUCTORS:
1
A
UTILITY TRANSFORMER
MAIN CIRCUIT BREAKER
(SUSE)
CCW
POWER
NOTE 4
2 #3, 1#3N,
1
B\
MAIN CIRCUIT BREAKER
T0 AT1C RANSFER
POWER
2 1/2"
2#3, 1 �3 1 �8G
(SUSE)
SWITCH
1
C
A OMATIC TRANSFER
POWER DISTRIBUTION
POWER
2 1/2p'
2/#3/.1#3N. 18G
SWI H
BLOCK
1
D
STANDB GENERATOR
AUTOMATIC TRANSFER
STANDBY
2 1 /2"
2 #3, 1#3N, 1#8G
MAIN BRE ER
SWITCH
POWER
G2
CONTROL PA
SEAL OFF
SPARE
2 /2"
MARK BOTH ENDS OF
ENCLOSURE
VAULT
CONDUIT
G3
CONTROL PANEL
WET WELL
SEAL OFF
3 A, 3B, 3
3D, 3E,
ENCLOSURE
VAULT
3
A
CONTROL PANEL
P P No. 1
SEAL OFF
SE KRMP EAK,
2 "
MANUFACTURE SUPPLIED
ENCLOSURE
VAULT
0
CABLE
3
B
CONTROL PANEL
PUMP N 1
SEAL OFF
POWER
OVERTEMP
2 1/2m
MANUFACTURE SUPPLIED
ENCLOSURE
VAUL
CABLE
3
C
CONTROL PANEL
WET WELL
SEA OFF
A T AND
FLOAT
1"
2 #14
ENCLOSURE
3
D
CONTROL PANEL
WET WELL
SEAL OFF
LEVEL
TRANSDUCER
"
1 1/2"
MANUFACTURE SUPPLIED
ENCLOSURE
VAULT
CABLE
3
E
CONTROL PANEL
PUMP No. 2
S L OFF
SEAL LEAK,
2 "
MANUFACTURE SUPPLIED
ENCLOSURE
VA T
OVERTEMP
CABLE
3
F
CONTROL PANEL
PUMP o. 2
SEAL 0
POWER
OVERTEMP
2 1/2-
MANUFACTURE SUPPLIED
ENCLOSURE
VAULT
CABLE
CONTROL PANEL
ARE
PULL TWINE, CAP AND
3
G
ENCLOSURE
AL OFF VAULT
2"
MARK BOTH ENDS OF
G4
CONTROL PANEL
STANDBY GENERATOR
4A, 4B,
ENCLOSURE
4
A
AUTOMATIC 7ASFER
STANDBY GENERATOR
CONTROL
6 #14, 1 #14G
SWITCH
CONTROL PANEL
4
B
CONTRePANEL
STANDBY GENERATOR
CONTROL
1"
14, 114G
ENCL
CONTROL PANEL
4
C
P NELBOARD
GENERATOR BLOCK
HEATER/BATTERY
POWER
3 / " 4
1 10 , 10N, 110G
CHARGER
5
PANELBOARD
YARD LIGHT
POWER
3/4"
1 #12, 1 #12N, #12G
OF
SIZE PER MFG'S
B
TELEMETRY ANTENNA
TELEMETRY PANEL
RADIO
RECOMMENDATIONS
*ILA
Tj BL.IC W(D I Z�S L .
' / j- �s'� — ENGINEERING— STREETS — WATER — SEWER— PARKS— BUILDING-
k
� � 1zl
;...,
All oN,
1908
JaO ,soWa W *a MO
r 16 NO VI AW" a I1� N � I Id+►9� I�- ��8. o� .scv�
q r
1>•28420D
°Y ° °'° CONSULTANTS
designed
MD
2/20 /01
33301 9TH AVENUE SOUTH
FEDERAL WAY, WASHINGTON
BERGER/ABAM 98�y00+3� -2600
E v _ E q S H ;. VOICE: (206)431 -2300
FAX: (206)431 -2250
drown
8JA
2/20/01
checked
GLP
2/20/01
prof eng
CCW
2/20 /01
pro) d1r
GLP
2/20 /01
Feld Ok no
ROLL 201
/AUXILIARY
GENERATOR
5 Kv
480V, H
G
CONTROL PANEL
ON GENERATOR T
AMS A
s
AIN SERVICE
BREAKER ON
GENERATORS T
(NOTE 6
SEAL OFF
TYPICAL -
f
..s•
LA
/1Z-1
ucHnNc
ARRESTOR
� (NOS s)
�I
:::rl
PRIMARY PO R
UNDERGROUND RIMARY CONDUC
BY PUGET ND ENERGY
(NOTE 4)
PA MOUNT
SO ND
nn 480V, _ 3 H
I KWH I ME R BASE BY
I NTRACTOR TO
UGET SOUND ENERG
STANDARDS (NOTE
OF
1A 5
A BREAKER, 10 FR
100A, 22KAIC, OCKABLE
EMA 3R (SUSE) (NO 3)
#8 ROUND
8x3/4" GROUND
G
5\
IP2 -XFMR
(NOTE 2)
roMnnc
TRANSFER SWITCH
N ASCO APPRO'
2P -60A
'S IP2 -XFM
(NOTE
VMR
VOLTAGE OFT
�R MONITOR
RELAY 2
1
LEVEL
TRANSDUC
C.T. IT (NOTE
OL'S
(NOTE 1)
ISR
gw,A�i
ALL
PUMPS
ON LEVEL
SENS(
EQUAL)
—PC
BL
DISTRIBUTION
(480V)
i
i
/,3 ER
TO
PH
\ M.L.O.
C.T. � LOAD
IT � CE R
1 /240V
DL' OA MAIN
�� � � BREAKER
"LC"
tPMU (NOTE /5)
L
&3..l
eUN 1 PUMP N o. 2
20 HP
PUMP S T A T 10
SCALE: A.T.S.
5
/EQUICONTROL PANEL Q
ENCLOSURE NE 12
VALENT CT
LT
J-B
2'W X 3'L X 2'D -7
/
40C
WET WELL
ONE-LINE DIAG
PUMP STATION PROPOSED ONE -LINE DIAGRAM
SOUTH 180th STREET GRADE SEPARATION
F I;t�
oil 3.1
NO
r"1
0
H
U
C41 B
- � -- 1 -- - -- - - -- -- -
/S ! RECORD COPY sh.et41 Bof 144 - - -_-
�/�1 AODEN DUM 5 job no A00084
p/IO ADDENDUM 1 _ -- - mde AS SHONIN
f-
no I dote revisions dote 20- Feb -2001
-tom -4e402
4
4
c V�
0C
c
f
N
M c
w >
> 1
T.
N
177
C
C
r.
r