Loading...
HomeMy WebLinkAboutD-28620Di 4i v c v� 10 C v C 0 0 V E c E 0 0 10 u r v 10 0 c c o� U 0 v a, r c 0 C v E c 0 L w 0 C v 0 C 0 v a� v V v N Ic 0 r U ai a v r U c v 0 0 N co rn U Q 3 r .3 c v L_ 0 v v C 'v u `c 0 0 O c �A v r N OTEI 1. ADJUST /SIZE OVER HEATER ELEMENT TO PROTECT THE ACTUAL MOTOR FURNISHED. 2. PROVIDE CONTROL POWER TRANSFORMER SIZED FOR THE ACTUAL LOAD SERVED BY SECONDARY TRANSFORMERS. 3. UTILITY METER AND MAIN DISCONNECT SHALL BE MOUNTED ON CONTROL PANEL ENCLOSURE. INSTALL METER BASE AND MAIN DISCONNECT AS PER PUGET SOUND ENERGY STANDARDS. 4. PUGET SOUND ENERGY SHALL PROVIDE IN ADDITION TO PRIMARY CONDUITS AND WIRES, THE SECONDARY RUNS FROM THE TRANSFORMER TO THE POINT OF CONNECTION AS SHOWN ON DRAWINGS. CONTRACTOR SHALL COORDINATE WITHPUGET SOUND ENERGY PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL COORDINATE WITH PUMP SUPPLIER AND PROVIDE CONNECTIONS FOR PUMP MONITORING UNIT (PMU). 6. CONTRACTOR SHALL COORDINATE WITH PUMP SUPPLIER AND PROVIDE REQUIRED PENETRATIONS AND SEAL OFFS IF THE CONTROL CONDUCTORS ARE NOT INCLUDED IN THE POWER CABLE. 7. LEVEL TRANSDUCER SHALL BE SUITABLE FOR CLASS ONE DIVISION 1 LOCATION. CONDUIT SCHEDULE N. R P: CON. RUN: FROM: TO: VIA FOR SIZE: CONDUCTORS: 1 A UTILITY TRANSFORMER MAIN CIRCUIT BREAKER (SUSE) CCW POWER NOTE 4 2 #3, 1#3N, 1 B\ MAIN CIRCUIT BREAKER T0 AT1C RANSFER POWER 2 1/2" 2#3, 1 �3 1 �8G (SUSE) SWITCH 1 C A OMATIC TRANSFER POWER DISTRIBUTION POWER 2 1/2p' 2/#3/.1#3N. 18G SWI H BLOCK 1 D STANDB GENERATOR AUTOMATIC TRANSFER STANDBY 2 1 /2" 2 #3, 1#3N, 1#8G MAIN BRE ER SWITCH POWER G2 CONTROL PA SEAL OFF SPARE 2 /2" MARK BOTH ENDS OF ENCLOSURE VAULT CONDUIT G3 CONTROL PANEL WET WELL SEAL OFF 3 A, 3B, 3 3D, 3E, ENCLOSURE VAULT 3 A CONTROL PANEL P P No. 1 SEAL OFF SE KRMP EAK, 2 " MANUFACTURE SUPPLIED ENCLOSURE VAULT 0 CABLE 3 B CONTROL PANEL PUMP N 1 SEAL OFF POWER OVERTEMP 2 1/2m MANUFACTURE SUPPLIED ENCLOSURE VAUL CABLE 3 C CONTROL PANEL WET WELL SEA OFF A T AND FLOAT 1" 2 #14 ENCLOSURE 3 D CONTROL PANEL WET WELL SEAL OFF LEVEL TRANSDUCER " 1 1/2" MANUFACTURE SUPPLIED ENCLOSURE VAULT CABLE 3 E CONTROL PANEL PUMP No. 2 S L OFF SEAL LEAK, 2 " MANUFACTURE SUPPLIED ENCLOSURE VA T OVERTEMP CABLE 3 F CONTROL PANEL PUMP o. 2 SEAL 0 POWER OVERTEMP 2 1/2- MANUFACTURE SUPPLIED ENCLOSURE VAULT CABLE CONTROL PANEL ARE PULL TWINE, CAP AND 3 G ENCLOSURE AL OFF VAULT 2" MARK BOTH ENDS OF G4 CONTROL PANEL STANDBY GENERATOR 4A, 4B, ENCLOSURE 4 A AUTOMATIC 7ASFER STANDBY GENERATOR CONTROL 6 #14, 1 #14G SWITCH CONTROL PANEL 4 B CONTRePANEL STANDBY GENERATOR CONTROL 1" 14, 114G ENCL CONTROL PANEL 4 C P NELBOARD GENERATOR BLOCK HEATER/BATTERY POWER 3 / " 4 1 10 , 10N, 110G CHARGER 5 PANELBOARD YARD LIGHT POWER 3/4" 1 #12, 1 #12N, #12G OF SIZE PER MFG'S B TELEMETRY ANTENNA TELEMETRY PANEL RADIO RECOMMENDATIONS *ILA Tj BL.IC W(D I Z�S L . ' / j- �s'� — ENGINEERING— STREETS — WATER — SEWER— PARKS— BUILDING- k � � 1zl ;..., All oN, 1908 JaO ,soWa W *a MO r 16 NO VI AW" a I1� N � I Id+►9� I�- ��8. o� .scv� q r 1>•28420D °Y ° °'° CONSULTANTS designed MD 2/20 /01 33301 9TH AVENUE SOUTH FEDERAL WAY, WASHINGTON BERGER/ABAM 98�y00+3� -2600 E v _ E q S H ;. VOICE: (206)431 -2300 FAX: (206)431 -2250 drown 8JA 2/20/01 checked GLP 2/20/01 prof eng CCW 2/20 /01 pro) d1r GLP 2/20 /01 Feld Ok no ROLL 201 /AUXILIARY GENERATOR 5 Kv 480V, H G CONTROL PANEL ON GENERATOR T AMS A s AIN SERVICE BREAKER ON GENERATORS T (NOTE 6 SEAL OFF TYPICAL - f ..s• LA /1Z-1 ucHnNc ARRESTOR � (NOS s) �I :::rl PRIMARY PO R UNDERGROUND RIMARY CONDUC BY PUGET ND ENERGY (NOTE 4) PA MOUNT SO ND nn 480V, _ 3 H I KWH I ME R BASE BY I NTRACTOR TO UGET SOUND ENERG STANDARDS (NOTE OF 1A 5 A BREAKER, 10 FR 100A, 22KAIC, OCKABLE EMA 3R (SUSE) (NO 3) #8 ROUND 8x3/4" GROUND G 5\ IP2 -XFMR (NOTE 2) roMnnc TRANSFER SWITCH N ASCO APPRO' 2P -60A 'S IP2 -XFM (NOTE VMR VOLTAGE OFT �R MONITOR RELAY 2 1 LEVEL TRANSDUC C.T. IT (NOTE OL'S (NOTE 1) ISR gw,A�i ALL PUMPS ON LEVEL SENS( EQUAL) —PC BL DISTRIBUTION (480V) i i /,3 ER TO PH \ M.L.O. C.T. � LOAD IT � CE R 1 /240V DL' OA MAIN �� � � BREAKER "LC" tPMU (NOTE /5) L &3..l eUN 1 PUMP N o. 2 20 HP PUMP S T A T 10 SCALE: A.T.S. 5 /EQUICONTROL PANEL Q ENCLOSURE NE 12 VALENT CT LT J-B 2'W X 3'L X 2'D -7 / 40C WET WELL ONE-LINE DIAG PUMP STATION PROPOSED ONE -LINE DIAGRAM SOUTH 180th STREET GRADE SEPARATION F I;t� oil 3.1 NO r"1 0 H U C41 B - � -- 1 -- - -- - - -- -- - /S ! RECORD COPY sh.et41 Bof 144 - - -_- �/�1 AODEN DUM 5 job no A00084 p/IO ADDENDUM 1 _ -- - mde AS SHONIN f- no I dote revisions dote 20- Feb -2001 -tom -4e402 4 4 c V� 0C c f N M c w > > 1 T. N 177 C C r. r