Loading...
HomeMy WebLinkAboutD-2959060) N a. L W • _ . L• E S. 7TH STREET - 14- .... .... .......... 31+00: 32 t - 1— i T f 1 _ : f, s 7 I _ CBNO.5 _ SEE CITY DETAIL - - - 2' -lo- _.8012. TYP. R� R 8 W Z Z Ise HORIZ. 1 " = 20': 20' 10' 0 20' 40' VERT. 1" = 5' ROADWAY RESTORATION NOTES �1 CONTRACTOR SHALL RESTORE EXISTING LANDSCAPING IN KIND AND GRASSED AREAS WITH SOD. O CONTRACTOR SHALL NEAT LINE SAWCUT EXISTING SIDEWALK AND /OR CURB, AND REMOVE AND WASTEHAUL CONCRETE. CONTRACTOR TO INSTALL CEMENT CONCRETE CURB,GUTTEI AND /OR REPLACE SIDEWALK IN KIND. Q CONTRACTOR SHALL USE CAUTION WHEN WORKING IN THE VICINITY OF THE BUILDING LOCATED NORTH OF S 7TH STREET BETWEEN SMITHERS AVENUE AND BURNETT AVENUE ® SAWCUT EXISTING DRIVEWAY FULL DEPTH AT LOCATION TO BE MARKED IN THE FIELD BY THE ENGINEER. WASTEHAUL EXISTING PAVEMENT AND REPLACE DRIVEWAY IN KIND. SEE CITY DETAIL F006 50 NOT USED © CONTRACTOR SHALL REMOVE, PROTECT, AND RELOCATE EXISTING SIGN. SEE CITY STANDARD SIGN INSTALLATION DETAIL G 024. Q CONTRACTOR SHALL FURNISH AND INSTALL CURB RAMP PER WSDOT STD PLAN F -3b \2/ CONTRACTOR SHALL FURNISH AND INSTALL 4— INCHES COMPACTED DEPTH BARK MULCH. gJ CONTRACTOR SHALL REMOVE THE TWO EXISTING PINE TREES PRIOR TO EXCAVATION OF STORM TRENCH. THE REMOVED TREES SHALL BE REPLACED WITH DIAMETER INCH FOR DIAMETER INCH. THE TOTAL DIAMETER INCHES OF THE EXISTING PINE TREES IS 27 INCHES MEASURED AT BREAST HEIGHT. SEE SPECIFICATIONS FOR DESCRIPTION AND LOCATION OF NEW TREES. ® PARK SIGNS. REPLACE TO EXISTING CONDITIONS OR BETTER. UPON REMOVAL, DELIVER SIGN TO THE PARKS MAINTENANCE DIVISION FOR REFURBISHING. PARKS MAINTENANCE WILL DELIVER TO CONTRACTOR FOR INSTALLATION FOLLOWING RENOVATION. CONTACT RON HEMPHILL AT 425- 766 -6200. D '�` OEN ERAL RESTORATION NOTES • 1. CONTRACTOR SHALL RESTORE ALL CHANNELIZATION MARKINGS IN CB N0. 16 _ ___� �• KIND, INCLUDING STOP BARS CROSSWALKS LANE MARKER BUTTONS AND PAINT STRIPES, HYDRANT MARKERS, CHANNELIZATION ARROWS, AND ANY OTHER EXISTING p►� CHANNELIZATION MARKERS LOCATED WITHIN THE LIMITS OF THE i / �"' / "� �► PROJECT. COORDINATE WITH CITY INSPECTOR. CBN0.9 W : Eli . r I f CB No. 10 '�N' 2 s ,� � i ��„� EE BUTT JOINT DETAIL ON SHEET 9 FOR SAWCUT LINE _ - -- REQUIREMENTS ► r pA Q - 3. CONTRACTOR SHALL REPLACE EXISTING CURB, GUTTER, AND SIDEWALK IN KIND. IF EXISTING GUTTER PANEL WIDTH IS LESS 4 THAN OR GREATER THAN 12", COORDINATE REPLACEMENT WITH 1 # { 2 s f CITY 4. CONTRACTOR SHALL MINIMIZE CONSTRUCTION IMPACT TO PARK. CB NO. 8 r 2 !7. CONTRACTOR SHALL NOT STORE SOIL, EQUIPMENT, SUPPLIES, 1 CB No 6 'L _ -� t._ , -; ',k. ~` =- » Cam' ;`��� ,10 No. 18 VEHICLES AND TRAILERS ON THE PARK SITE. CONTRACTOR SHALL . � 2 � _ — �- DETAIL - - --- - -- -- ......- ...... .... � � x •; ��; �; ' ;' ;' , �`; �; SEE CITY D REPLACE TURF WITH SOD AND BARK r 3 - � ri - � �'�.,,1 , "% BEDS TO EXISTING 8027.1 THE CITY PARKS DEPARTMENT CONDITIONS- AT THE DIRECTION OF f1 ' 36* _...� — T_ _ __ '-- ----` -- - » cP�-�' so cBNO. I9 5. IRRIGATION LINES ARE LOCATED IN THE VICINITY OF THE `' -. `�` - ----~- 36 PROPOSED STORM PIPE WHICH RUNS ALONG THE EDGE OF THE r- , r,, f .. + _ -r _ _ .'f i D. -� - �, - PARK GRASS AND BARK BE CONTRACTOR SHALL CONTACT THE 'f +00 �'' �'= `� 31. CITY PARKS DEPARTMENT PRIOR TO BEGINNING WORK WITHIN THE 2 _ 37 — - i — _ ,_ -+ ""• — -- - �� i1� +�0,- �1 +93.06 PARK TO LOCATE SPRINKLER HEADS. ANY DAMAGE TO THE _ -- .. - -.. ........... - ..••. -•• .� N. K. No. 1 - ; , - ! , -� _ IRRIGATION SYSTEM CAUSED BY THE CONTRACTOR SHALL BE - _ — _....._....._.........._ 0 - _ __ - - - -- _- _-_ , , . s_ REPLACED IN KIND. _ r _ � MON. PT. NO. 117 - -- r _ _ __ Z _— __._........ _ t _ : - -'-•t _ _ / _' a , • .• 1 Fi t'� ^.; -J 1 y �� T I ; ;' .. . -._ -•Fig - / ` ~. -f i , - ; — - - _ _ f _ f. x , �. — -- - _ +- -� - Ni ` _ - _ _ f . ' - _ ---- ; - - -_ -- : -- ti _ ,< N - ,. ,, i- -7 �; CHECKED FOR COtiAPIJANCE WITH CITY STANDARDS -- -- _ Z Y Date 2 B - 03 ' By Date: -ao -oa r By Date: 6 —Ze a3 Date: �• ,�a♦ �' .', SEE CITY DETgI� { - - --- ALA 8012, TYP. \ :T_.: � 8Y / Dote. By: Date: o Date: Date: oc�E� 7- �z -2aa NO. 11 AS SUILT PER CONTRACTOR'S REGORD 102 D11 � 2 9 5 0 6 BASE SURVEY CERTIFICATION * I HEREBY CERTIFY THAT THE HORIZONTAL AND VERTICAL LOCATIONS ..,,,,,,,s'T' �+ � C1 TY OF 6/18/03 OF THE TOPOGRAPHIC FEATURES SHOWN HEREON ARE THE RESULT M•w. S.W. 7TH STREET DRAINAGE IMPROVEMENT PROTECT z —8—c 0--j-2 0—mn I .0v Isicn OF A SURVEY MADE BY ME OR UNDER MY DIRECTION. '""" = RENTON PHASE 1 - MORRIS AVE. S. TO BURNETT AVE. S. J.N. 01� "°" DATUM CONSULTING ENGINEERS w .w• � � sus m oM wim � snt m �w ws ww 6 gnu. �ww �ww w�ww SCOTT L. THOMAS L-S-- 16930 DATE: NO. By DATE APPR .�. ...� �w�u► STREET RESTORATION PLAN d 9 swr •1JP.Oil , 6 U APR t ! JO LC' Is e ROLL19,7 FR 247 con cn �so Cn o V �Ma V 4