Loading...
HomeMy WebLinkAboutD-2959080) 1 I` N 1 12.5 �.�� o 4• $•9 9.25 1 12" WATER LINE CONSTRUCTION CONTRACTOR SHALL SHACKLE ROD EXISTING GROUND FROM EXIST. LINE TO DEADMAN EXIST. 21" CLAY ANCHOR (APPROX. I.E. 22.1 AT CROSSING I PROPOSED 36" STORM PIPE --- 3' MIN. (APPROX. I.E. 21.00 AT CROSSING) .••.. T. E = 2 0,14 18 "x12" TAPPING TEE WITH 12" GATE VALVE (FLxMJ) AND THRUST BLOCK. SEE CITY DETAIL B085 FOR THRUST BLOCK SIZING. NEW 12" DI PIPE (SEE SPECIFICATION) EXIST. 3- 2" POWER LINES i rop or m "Dr. P. 19.74 3' MIN. QU60 MIN. "SHACKLE RODS 6-3/410 OR 8-5/8 (SEE CITY DETAIL B089) 4 -8" 45' BEND (MJ X MJ) (TYP) WATER LINE INSTALLATION PROFILE SCALE: 1 "=41 SHACKLE RODS (AS REQUIRED) 6 -3/4" OR 8 -5/8" FOR 12 -INCH PIPE (SEE CITY DETAIL B089) —� 3" CLR 3" CLR PLAN VIEW NE NNERA O.C. W� 8" ONRETE CONCRETE SHALL BE KEYED 12" MIN. AGAINST UNDISTURBED EARTH BOTH FACES • 12" PIPE 1.5' MIN. CLASS 5 1/2 SACK CONCRETE 3000 PSI MINIMUM -;-- --4- -4-- -4- --. 0 0 � v L-NEW 12" DI STORM PIPE (I.E. 23.5 AT CROSSING) DEADMAN ANCHOR oc -H IM � I STA. 35 +14 ,.k�. � � � z i Q ' If w RODS BETWEEN TAPPING a w i SEE CITY cc c /ti � ""�'''�"�"' CITY OF OR REN TON wOl aPL S PHASE 1 REMORR 3 AVE. S �^TO BURNE TTANE. S CT DETAILS -WATER LIE MISTALI.ATION ��a /o3 q I Q I �N� cr � C/� co c� W� � mmm� � J.N. I w AT Ma wu :•��:•: m W f i N i -� M.N. W SEE NOTE 3 lop i �� BY - M T i ...� in i D X j cn W 0 0 a r,. ! a t+ J J J M i f) °' I N I NEW 12" DI ! WITHERS AVE. S 1 1 J it) NI M LONSTRUCTION NOTES: ' SHACKLE RODS BETWEEN TAPPING a TEE AND DEADMAN ANCHOR. SEE CITY s a � ""�'''�"�"' CITY OF OR REN TON wOl aPL S PHASE 1 REMORR 3 AVE. S �^TO BURNE TTANE. S CT DETAILS -WATER LIE MISTALI.ATION ��a /o3 q I Q I �N� cr -� o c� W� � mmm� � J.N. I w AT Ma wu :•��:•: m N i -� M.N. W co REV1s 100 M, BY ? M KAE. i ...� in i D X j cn W 0 0 a ! a p_ H in W 4 LONSTRUCTION NOTES: INSTALL SHACKLE RODS BETWEEN TAPPING 1. CONTRACTOR SHALL TEE AND DEADMAN ANCHOR. SEE CITY DETAIL B089. 2. EXISTING WATER MAIN SHALL REMAIN IN SERVICE UNTIL A SUCCESSFUL PURITY AND PRESSURE TEST OF THE NEW SYSTEM HAS BEEN WITNESSED BY THE CITY. ALL EXISTING PIPES, FITTINGS AND BLOCKING NECESSARY TO BE REMOVED DURING CONSTRUCTION SHALL BE WASTEHAULED. ALL OTHER EXISTING PIPE THAT WILL NO LONGER BE IN SERVICE SHALL BE ABANDONED IN PLACE. 3. PLUG EXISTING 18 "x8" TEE WITH MJ PLUG ONCE NOTE 2 IS COMPLETED. 4. CITY CREW TO MAKE CONNECTION BETWEEN NEW AND EXISTING SYSTEM. �1 0 1t co W z EXIST. Cl 8" WATERMAIN J r ` co z ' _ OUP t a � <o~ m — 'Q W 3 IN .i i 3 J co tic a d o i i i STA. 35 +42 36.1 L NEW FIRE HYDRANT ASSEMBLY REMOVE AND DELIVER EXIST. HYDRANT TO CITY MAI NT. J io SEE NOTE 4 FURNISH AND INSTALL: 1 -18 "02" TAPPING TEE WITH 12" GATE VALVE (FLxMJ) AND THRUST BLOCK 4 -12 "x45' VERTICAL BENDS (MJxMJ) 1- DEADMAN ANCHOR 1 -FIRE HYDRANT ASSEMBLY (PER CITY DETAIL 6102) 1- 12 "x8" TEE (MlJxFL) W /THRUST BLOCK 1 -8" GATE VALVE (FLxMJ) 1 -12" PLUG (MJ) W/THRUST BLOCK 1 -8 "x90' BEND (MJ) W/THRUST BLOCK 1 -8" SOLID SLEEVE (MJ) WATER LINE INSTALLATION PLAN SCALE: 1"=4' TYPICAL CONCRETE DEADMAN ANCHOR DETAIL NOT TO SCALE AS BUILT PER CONTRACTOR 5 RECORD 10103 D- 295908 4qjloo p�(�� Q. vw^�a'j'�/ � COISUITMG ENGiNEEItt �. w� ww w w ww 1 I �'� � ""�'''�"�"' CITY OF OR REN TON wOl aPL S PHASE 1 REMORR 3 AVE. S �^TO BURNE TTANE. S CT DETAILS -WATER LIE MISTALI.ATION ��a /o3 q I I I �N� W� m� mmm� � J.N. I w AT Ma wu :•��:•: -� M.N. No. REV1s 100 M, BY or►?E APPR KAE. ROLL 19;7 FFt 24P9 �CANhE� APR t t AAG:r • s J Cn rn rn o i 00 Con �N °, � `••� I x 0 z v