Loading...
HomeMy WebLinkAboutD-2959091 N 1 a. 3 EROSION /SEDIMENTATION CONTROL NOTES 1. CONTRACTOR SHALL SUBMIT TEMPORARY WATER POLLUTION /EROSION CONTROL PLAN PER THE CONTRACT SPECIFICATIONS. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION SHALL BE OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES SHALL BE IN OPERATION PRIOR TO LAND CLEARING AND /OR OTHER CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND AS UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND THE WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF THE SEDIMENT. ALL CATCH BASINS, CONVEYANCE LINES AND DITCHES SHALL BE CLEANED PRIOR TO PAVING. 6. THE CONTRACTOR SHALL REMOVE MATERIAL DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO THE CITY RIGHT -OF -WAY OR INTO THE EXISTING STORM DRAINAGE SYSTEM. DEBRIS SHALL NOT BE WASHED INTO THE STORM DRAINAGE SYSTEM . 7. TEMPORARY EROSION CONTROL FACILITIES SHALL BE INSPECTED WEEKLY AND MAINTAINED WITHIN 24 HOURS FOLLOWING A STORM EVENT. SEDIMENT SHALL BE REMOVED TO INSURE THE FACILITIES WILL FUNCTION PROPERLY. THE FACILITIES SHALL BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 8. DURING CONSTRUCTION, STORM DRAIN INLETS SHALL BE PROTECTED SO THAT STORMWATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 9. FROM APRIL 1 TO SEPTEMBER 30, NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN SEVEN DAYS. FROM OCTOBER 1 TO MARCH 31, NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FILL AND TOPSOIL MATERIAL FROM RAINFALL. FAILURE TO DO THIS MAY RESULT IN REMOVAL AND REPLACEMENT OF SATURATED MATERIAL AT NO COST TO THE OWNER. ANY COST ASSOCIATED WITH DELAY IN WORK CAUSED BY SUCH REMOVAL AND REPLACEMENT SHALL BE AT NO COST TO THE OWNER. E of TA w • f ORAL j W Z � CLEAN AND TACK EDGE OF D EXISTING PAVEMENT WITH CSS1 U 3 MATCH EXISTING PAVEMENT SEAL JOINT WITH HOT PAVING ASPHALT (AR 4000W) AND APPLY SAND BLANKET. NEW ASPHALT CONCRETE CL "B" - _ '---FIRM AND UNYIELDING SUBGRADE CRUSHED SURFACING TOP COURSE. BUTT JOINT DETAIL NOT TO SCALE O NOTESI . 1. REMOVE CATCH BASIN GRATING. 2. CLEAN DIRT AND DEBRIS FROM GRATING LEDGE. 3. LAY THE CATCH BASIN INSERT INSIDE THE BASIN 4. REPLACE THE GRATING, PINCHING THE INSERT FABRIC BETWEEN THE GRATING AND THE CATCH BASIN FRAME. 5. CUT OFF THE EXCESS FABRIC OFF WITH A BLADE KNIFE. A 3 TO 5 INCH WIDE STRIP OF FABRIC SHOULD BE LEFT AROUND THE OUTSIDE OF THE GRATING IF THE INSERT IS TO BE USED MORE THAN ONCE, 48" 7— co .. :► ,/—FILTER FABRIC r i RETRIEVAL STRAP BYPASS VOLUMES FILTER FABRIC CATCH BASIN INSERT FOR SEDIMENT ONLY NOT TO SCALE � D�AEl 7 1T �00/ 1 AS BUILT PER CONTRA CTOR S RECORD 10103 D 295909 _' c « I� CONSULTING ENGINEERS 7w Lanai ft "M 0w sA �w a�u. v t■n wwr w w.�w S.T. &"*M DATUM CITY OF RENTON W* Dept S.W. 7TH STREET DRAINAGE IMPROVEMENT PROTECT PHASE 1 • MORRIS AVE. S. TO BURNETT AVE. S. DETAU • TEMPORARY EROSION AND SED11101M AND INISCEILJ�NEOUS DETAILS 6/18/03 MA + 1> d. ". f"an "0M �, "" """""1°" �� MA NO. BY DATE APR -i E. q ROLL 1'9;.7 N FR 2 OD 5 dm,O%,&�EDAM t t s..r • • 91 d 0 O c n CA z rA o � w rn K K• 0 0 m mIwo 3