HomeMy WebLinkAboutS-202907ROADWAY
0
00 M
IQ U
W W
ti h
J
z
z;
WARNING
0 %z 1
R. C. E. NO. DATE
IF THIS BAR DOES
NOT MEASURE I'
THEN DRAWING S
R. C. E. NO. DATE NOT TO SCALE.
SHEET NOTES:
1. SEE SHEET G -2 FOR GENERAL NOTES
2. SEE SHEET G -3 FOR SURVEY CONTROL POINTS
AS -2029
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
HONEY CREEK INTERIM REPAIRS
PLAN O "� 8WWP -22 -2029 s +80 T STA. 11+80
DESIGNED: DATE: 55/93 FILE NAME:
DRAWN:
DPA JEB 9 -24 -93 CHECKED: SCALE: AS NOTED FIELD BOOR: PAGEe
BY APPR. DATE SHEET: C -4 OF: -
AREA E NOTES:
AREA F NOTES:
O(SEE
SHT C -3)
O
RAISE ROAD GRADE
2
(NOT USED)
OZ O
STA 10 +26 TO STA 11+82
6 "- 1%4" BASE COURSE
3
ROADWAY RECONSTRUCTION
2
O
8' STREAMSIDE ROCKERY
3
STA 8+45 TO STA 9+05
STA 10+65 TO STA 11 +35 (10'+ WEST OF SURVEY LINE)
O
SHORTEN EXIST CULVERT (12" CMP AS REO'D TO MATCH STREAM BANK)
O
REPAIR GABIONS (STRAIGHTEN THE WIRE CAGE S
STA 8 +99 (INCIDENTAL TO OTHER WORK)
REPLACE ROCK AND REWIRE WHERE DAMAGED
\ y
41
STA 11 +55 TO STA 11 +82)
Leo
REPAIR GABIONS (STRAIGHTEN THE WIRE CAGES
REPLACE ROCK AND REWIRE WHERE DAMAGED
4
(SEE SHT C -5)
STA 9 +56 TO STA 10+08)
jELi
- - --
f(lD
Vx
5
CLEAN EXIST CULVERT
O
ROADWAY RECONSTRUCTION
CUT OR EXTEND END TO MATCH W/ ROCKERY
STA 9+45 TO STA- 10 +26 -(10' WIDTH)
HONEY CREEI -`
6
(SEE SHT G 4)
7O
8' STREAMSIDE ROCKERY (5'± WEST OF SURVEY LINE)
STA 9+45 TO STA 10 +26
7
(SEE SHT C -4)
8
INSTALL ROCK GROINS (2 PLACES)
8
(SEE SHT C -4)
9
PLACE DEFLECTOR LOG (W/ ROOT WAD ATTACHED)
9
(SEE SHT C-4)
10
PLACE BOULDER (4 -5 MAN ROCK (IMPORTED)
/p
(SEE SHT C -4)
11
RAISE CLEANOUT TO GRADE
11
LIGHT LOOSE RIPRAP (AT END OF ROCKERY
— 3 TONS)
!2
LIGHT LOOSE RIPRAP (AT END OF ROCKERY
— 3 TONS)
l3
CLEAN EXIST CULVERT
PLAN
WASTEWATER
REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS
REVEW DATE
UTILITY DATE D RECORD DRAWING
NO_ I REVISION
SHEET NOTES:
1. SEE SHEET G -2 FOR GENERAL NOTES
2. SEE SHEET G -3 FOR SURVEY CONTROL POINTS
AS -2029
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
HONEY CREEK INTERIM REPAIRS
PLAN O "� 8WWP -22 -2029 s +80 T STA. 11+80
DESIGNED: DATE: 55/93 FILE NAME:
DRAWN:
DPA JEB 9 -24 -93 CHECKED: SCALE: AS NOTED FIELD BOOR: PAGEe
BY APPR. DATE SHEET: C -4 OF: -
y
OZ O
� W
3
CID
\ y
41
Leo
jELi
- - --
f(lD
EXIST l2" SS
-- --- --.-_` -
HONEY CREEI -`
SHEET NOTES:
1. SEE SHEET G -2 FOR GENERAL NOTES
2. SEE SHEET G -3 FOR SURVEY CONTROL POINTS
AS -2029
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
HONEY CREEK INTERIM REPAIRS
PLAN O "� 8WWP -22 -2029 s +80 T STA. 11+80
DESIGNED: DATE: 55/93 FILE NAME:
DRAWN:
DPA JEB 9 -24 -93 CHECKED: SCALE: AS NOTED FIELD BOOR: PAGEe
BY APPR. DATE SHEET: C -4 OF: -