Loading...
HomeMy WebLinkAboutS-20290DSCALE: A BRIDGE NQ.-J-"" (: B RAISE ROAD *ti L�ro A' `\ \ �' �` . C -!6 AB(ITAPT REPAIR C-/7 GRADE (l2` WIDTH) ; f Iy EY CREEK \ l f�' -_ - - - - - -- - - - — - - - - y _... - - - -- - - - - -- - -- N _ _..... _ to ss Lu �� �--- ___-- " - -• -- Stu - -- - - -- - - -- - --- --- -- -- -p - p- - E -E..K � tai � —_==— --- - - --- — — — — �r= HUN E - _. U-9 5 U6 = _ ':- PI - STREAMSIDE C ROCKERY A ROADWAY �` - f'f CULVERT C-l7 (6 8' ` - HEIGHT) C -17 RECONSTRUCTION � `' A - J r - Y- (l0' WIDTH( _ ;r W/ CATC - Ice )SEE SHT C -9) 2 ROADWAY RECONSTRUCTION STA 26 +12 TO STA 27 +25 OREMOVE AND DISPOSE OF IST TANK STA 27+00+ (INCIDENTAL OTHER WORK) O6' TO 8'STREAMSIDE CKERY(LOCATION AS SHOWN) STA 26 +12 TO STA +25 5 (SEE SHT C -9) \ 6 (SEE SHT C ) 7 LIGHT L SE RIPRAP (AT END OF ROCKERY -3 T S) AREA N `,y C J AREA 0 'BID SCHEDULE C �� NOT IN CONTRACT --1- '• � �� v: y t� , �,. � BID SCHEDULE C F OT IN CONTRACT f p SCALE: A BRIDGE NQ.-J-"" (: B RAISE ROAD *ti L�ro A' `\ \ �' �` . C -!6 AB(ITAPT REPAIR C-/7 GRADE (l2` WIDTH) ; f Iy EY CREEK \ l f�' -_ - - - - - -- - - - — - - - - y _... - - - -- - - - - -- - -- N _ _..... _ to ss Lu �� �--- ___-- " - -• -- Stu - -- - - -- - - -- - --- --- -- -- -p - p- - E -E..K � tai � —_==— --- - - --- — — — — �r= HUN E - _. U-9 5 U6 = _ ':- PI - STREAMSIDE C ROCKERY A ROADWAY �` - f'f CULVERT C-l7 (6 8' ` - HEIGHT) C -17 RECONSTRUCTION � `' A - J r - Y- (l0' WIDTH( _ ;r W/ CATC - Ice WARNING O f2 - = DATE IF THIS BAR DOES NOT MEASURE I• R. t. E. THEN DRAWING IS ^. Oz-E NOT TO SCALE. 9 B /N- 70 �r _ ...._ AREA 0 NOTES. STREAMSIDE - -- — l BRIDGE ABUTMENT REPAIR F-C-1 ROCKERY - C -/7 (8' HEIGHT) �~ 2 (NOT USED) OREMOVE FENCE POSTS PLANTING NOTES RD SHEET NOTES: STA 28 +77± Ro O INSTALL 15 "CPEP CULVERT P/ LIVESTACK (RED -OSIER GWOOD AND WILLOW. (, SEE SHEET G -2 FOR GENERAL NOTES STA 28 +77+ 2. SEE SHEET G -3 FOR SURVEY CONTROL POINTS 5 RIPRAP INLET /OUTLET TONS, EACH LOCATION) 3. FROM STA 29+00 TO STA 32+00 PLACE LOD AND 6 RAISE ROAD GRADE AFT (APPROX) BOULDER CLUSTERS IN LOCATIONS DESIGNED BY STA 28 +53 TO ST 29 +40 THE ENGINEER: PLAN FOR 4 SUCH LOCATIONS. 6" - l %2" BASE COURSE 2.5'- TO 4" OUARRY SPALLS 77 INSTALL 7Y ( CATCH BASIN STA 28 +7 _* 8 REMO EXIST GABION (INCIDENTAL TO OTHER WORK) 9 C STRUCT ROCK WEIR 10 8'STREAMSIDE ROCKERY (LOCATION AS SHOWN) I LIGHT LOOSE RIPRAP (AT END OF ROCKERY - 3 TONS) S44029 CITY OF RENTON DEPARTMENT OF PUBLIC WORKS HONEY CREEK INTERIM REPAIRS RECORD DRAWING REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS `J`} `�(}�J PLAN IMPROVEMENTS SEE ORIGINAL CONTRACT DRAWINGS W W P — L L — L v L 9 STA, 27 +00 TO STA. 30 +00 FOR SEAL AND SIGNATURES j DESIGNED: DATE: 5/93 FILE NAME: 9 -24 -93 PLAN REVEW DATE j DRAWN: WASTEWATER UT ITY DATE RD RECORD ORAW;NG DPA JEB S -24 -93 CHECKED: SCALE: AS NOTED FIE -L. E.- PAGE: NO. I REVISION BY APPR. DATE SHEET: C-IO OF: )SEE SHT C -9) 2 ROADWAY RECONSTRUCTION STA 26 +12 TO STA 27 +25 OREMOVE AND DISPOSE OF IST TANK STA 27+00+ (INCIDENTAL OTHER WORK) O6' TO 8'STREAMSIDE CKERY(LOCATION AS SHOWN) STA 26 +12 TO STA +25 5 (SEE SHT C -9) \ 6 (SEE SHT C ) 7 LIGHT L SE RIPRAP (AT END OF ROCKERY -3 T S) WARNING O f2 - = DATE IF THIS BAR DOES NOT MEASURE I• R. t. E. THEN DRAWING IS ^. Oz-E NOT TO SCALE. 9 B /N- 70 �r _ ...._ AREA 0 NOTES. STREAMSIDE - -- — l BRIDGE ABUTMENT REPAIR F-C-1 ROCKERY - C -/7 (8' HEIGHT) �~ 2 (NOT USED) OREMOVE FENCE POSTS PLANTING NOTES RD SHEET NOTES: STA 28 +77± Ro O INSTALL 15 "CPEP CULVERT P/ LIVESTACK (RED -OSIER GWOOD AND WILLOW. (, SEE SHEET G -2 FOR GENERAL NOTES STA 28 +77+ 2. SEE SHEET G -3 FOR SURVEY CONTROL POINTS 5 RIPRAP INLET /OUTLET TONS, EACH LOCATION) 3. FROM STA 29+00 TO STA 32+00 PLACE LOD AND 6 RAISE ROAD GRADE AFT (APPROX) BOULDER CLUSTERS IN LOCATIONS DESIGNED BY STA 28 +53 TO ST 29 +40 THE ENGINEER: PLAN FOR 4 SUCH LOCATIONS. 6" - l %2" BASE COURSE 2.5'- TO 4" OUARRY SPALLS 77 INSTALL 7Y ( CATCH BASIN STA 28 +7 _* 8 REMO EXIST GABION (INCIDENTAL TO OTHER WORK) 9 C STRUCT ROCK WEIR 10 8'STREAMSIDE ROCKERY (LOCATION AS SHOWN) I LIGHT LOOSE RIPRAP (AT END OF ROCKERY - 3 TONS) S44029 CITY OF RENTON DEPARTMENT OF PUBLIC WORKS HONEY CREEK INTERIM REPAIRS RECORD DRAWING REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS `J`} `�(}�J PLAN IMPROVEMENTS SEE ORIGINAL CONTRACT DRAWINGS W W P — L L — L v L 9 STA, 27 +00 TO STA. 30 +00 FOR SEAL AND SIGNATURES j DESIGNED: DATE: 5/93 FILE NAME: 9 -24 -93 PLAN REVEW DATE j DRAWN: WASTEWATER UT ITY DATE RD RECORD ORAW;NG DPA JEB S -24 -93 CHECKED: SCALE: AS NOTED FIE -L. E.- PAGE: NO. I REVISION BY APPR. DATE SHEET: C-IO OF: