Loading...
HomeMy WebLinkAboutS-20291515" CPEP 57UBOUT (2' TYP.) EXIST. CHANNEL I �bo ^ \ F 6" - 8" QUARRY SPALLS LIGHT LOOSE BOULDER CLUSTER 6" DRAIN PIPE WHERE SHOWN RIPRAP, DEFLECTOR (LENGTH AS NOTED) (3 TON) (SEE NOTE BELOW) 1 NOTE: THE CONTRACTOR MAY REMOVE BRIDGE DECKING AS REOUIRED TO PLACE CONCRETE. ANY DAMAGE TO THE BRIDGE SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. ROAD WIDTH DISTANCE - t-UH t-UU/ING I g I ABUTMENT 1 I VARIES ! VARIES 1 I i �, I I i I NTS D INLET MIN. 6" - 8" QUARRY SPALLS ROADWAY 10-2 GRATING 2`-6" MIN. COVER (SEE PLANS FOR SURFACE IMPROVEMENTS) 6" (TYP.) CHANNEL BANK STABILIZATION EXISTING o �-�•�- K- ^;r :-,: a -•[ -w- (WHERE SHOWN) GROUND .~-.. S _ `a WATER SURFACE EXIST. (ELEV.VARIES) — _ _ _ _ CHANNEL INVERT - -, _ 15" CPEP 15 "CPEP EXTEND SPALLS INTO TYPE l CATCH BASIN (LENGTH AS REO'D) STREAM CHANNEL — — - S = 0.0300 (MIN) p---------------- NATIVE (IF SUITABLE) EXTEND CULVERT THROUGH BANK STABILIZATION OR IMPORTED TED GRANULAR NULAR BORROW CUT -OFF TO MATCH SLOPE OF BANK SECTION NTS NOTES.' 1. PROVIDE ENERGY DISSIPATION AT CULVERT OUTFALLS (I.E. LARGE COBBLE OR SMALL BOULDER). ALSO. TO PREVENT "SHOT-GUN" EFFECT ON OPPOSITE BANK. LARGE BOULDER CLUSTERS SHOULD BE PLACED IN CHANNEL AS NEEDED. 2. INSTALL 15" CPEP 6" ABOVE INVERT OF TYPE l CATCH BASIN. 3. TOTAL DEPTH OF TYPE 1 CATCH BASIN IS 3' -61: 4. WHERE DIRECTED ANGLE CROSS CULVERTS DOWNSTREAM A CULVERT (TO AVOID IMPACT TO THE OPPOSITE BANK). VAR W/ CATCH BASIN lUBMITTED WARNING O VZ I PROJECT ENGINEER R. C. E. NO. DA -.E IF THIS BAR DOES NOT MEASURE IS 4 -CEfiC OFT THEN DRAWING MONTGOMERY WATSON NOT TO SCALE. NATIVE z $ACKFILL EXCAVATION LIMIT 2 zz- zs BASEROCK 10 l2 "(MIN THICKNESS) VAR I REPAIR 2' 4' (MIN) EXIST. WOODEN BRIDGE NON- SHRINK GROUT 12" #5 a 12" O.C. E.F_ 3 #4 @ 12" O.C. #5 DOWEL CENTERBULB WATERSTOP N (CONT. AROUND FOOTING) k - - CHANNELFLOWL — / � N #5 E.W. #5 DOWEL 24 "L 3' -0" (MIN) LIGHT LOOSE RIPRAP TOPSOIL 4" (MIN. THICKNESS) ROCK GROIN (MADE W/ 3 MAN TO 5 MAN ROCK) 3 VARIES WATER SURFACE - NORMAL HIGH WATER ( V. VARIES) (ELEV. , QUARRY SPALLS (6" - 8") IN FRONT AND UNDER ROCK GROIN -------- O�A\ \Vii QUARRY SPALLS NOTES (2" - 4") SECTION /. EACH ROCK GROIN INCLUDES APPROX.80 TONS OF ROCK. NTS 2. THE BASE DIMENSIONS OF THE ROCK GROIN SHALL BE APPROVED ROCK GROIN BY THE ENGINEER PRIOR TO CONSTRUCTING THE ROCK GROIN. C CITY OF REN T ON VAR DEPARTMENTS OF PUBLIC WORKS W HONEY CREEK INTERIM REPAIRS RECORD DRAWING REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS WWP -22 -2029 CIVIL DETAILS - 2 SEE ORIGINAL CONTRACT DRAWINGS FOR SEAL AND SIGNATURES R A PLN EVIEW DATE DESIGNED: DATE: 5/93 FILE NAME: 9-24-93 DRAWN: WASTEWATER UTILITY DATE RD RECORD DRAWING DPA JEB 9 -2e -93 CHECKED: SCALE: AS NOTED FIEF BOOK: PAGE: NO. I REVISION I BY I APPR. DATE SHEET: C -IS OF:- 1 „ EXIST. GABION BRIDGpp` i I 1 � i ! I o00. i I � CONCRETE o ---------- - - - - -- ----- - - - - -- - - - - -- - — — — -------------- - -- -- --- ----- — — — — — — — — — — — — — — — — — — — — — — — — Q \ REFERENCE NOTES: ! 5 Tn W N /O CLEANOUT ALL LOOSE MATERIAL UNDER THE EXIST. GABION. O USE ROCK AS FRONT FACE OF FORM WORK. 1 I u O3 USE STANDARD FORMING FOR THE VERTICAL FACES 1 'I 9 O PLACE 3" THICK BASE OF TOP COURSE KEYSTONE 9 1 AS FOUNDATION FOR NEW CONCRETE ABUTMENT. 1 I ! 1 (5 HAND EXCAVATE AS REQUIRED TO CLEAN OUT AREA ROAD WIDTH DISTANCE - t-UH t-UU/ING I g I ABUTMENT 1 I VARIES ! VARIES 1 I i �, I I i I NTS D INLET MIN. 6" - 8" QUARRY SPALLS ROADWAY 10-2 GRATING 2`-6" MIN. COVER (SEE PLANS FOR SURFACE IMPROVEMENTS) 6" (TYP.) CHANNEL BANK STABILIZATION EXISTING o �-�•�- K- ^;r :-,: a -•[ -w- (WHERE SHOWN) GROUND .~-.. S _ `a WATER SURFACE EXIST. (ELEV.VARIES) — _ _ _ _ CHANNEL INVERT - -, _ 15" CPEP 15 "CPEP EXTEND SPALLS INTO TYPE l CATCH BASIN (LENGTH AS REO'D) STREAM CHANNEL — — - S = 0.0300 (MIN) p---------------- NATIVE (IF SUITABLE) EXTEND CULVERT THROUGH BANK STABILIZATION OR IMPORTED TED GRANULAR NULAR BORROW CUT -OFF TO MATCH SLOPE OF BANK SECTION NTS NOTES.' 1. PROVIDE ENERGY DISSIPATION AT CULVERT OUTFALLS (I.E. LARGE COBBLE OR SMALL BOULDER). ALSO. TO PREVENT "SHOT-GUN" EFFECT ON OPPOSITE BANK. LARGE BOULDER CLUSTERS SHOULD BE PLACED IN CHANNEL AS NEEDED. 2. INSTALL 15" CPEP 6" ABOVE INVERT OF TYPE l CATCH BASIN. 3. TOTAL DEPTH OF TYPE 1 CATCH BASIN IS 3' -61: 4. WHERE DIRECTED ANGLE CROSS CULVERTS DOWNSTREAM A CULVERT (TO AVOID IMPACT TO THE OPPOSITE BANK). VAR W/ CATCH BASIN lUBMITTED WARNING O VZ I PROJECT ENGINEER R. C. E. NO. DA -.E IF THIS BAR DOES NOT MEASURE IS 4 -CEfiC OFT THEN DRAWING MONTGOMERY WATSON NOT TO SCALE. NATIVE z $ACKFILL EXCAVATION LIMIT 2 zz- zs BASEROCK 10 l2 "(MIN THICKNESS) VAR I REPAIR 2' 4' (MIN) EXIST. WOODEN BRIDGE NON- SHRINK GROUT 12" #5 a 12" O.C. E.F_ 3 #4 @ 12" O.C. #5 DOWEL CENTERBULB WATERSTOP N (CONT. AROUND FOOTING) k - - CHANNELFLOWL — / � N #5 E.W. #5 DOWEL 24 "L 3' -0" (MIN) LIGHT LOOSE RIPRAP TOPSOIL 4" (MIN. THICKNESS) ROCK GROIN (MADE W/ 3 MAN TO 5 MAN ROCK) 3 VARIES WATER SURFACE - NORMAL HIGH WATER ( V. VARIES) (ELEV. , QUARRY SPALLS (6" - 8") IN FRONT AND UNDER ROCK GROIN -------- O�A\ \Vii QUARRY SPALLS NOTES (2" - 4") SECTION /. EACH ROCK GROIN INCLUDES APPROX.80 TONS OF ROCK. NTS 2. THE BASE DIMENSIONS OF THE ROCK GROIN SHALL BE APPROVED ROCK GROIN BY THE ENGINEER PRIOR TO CONSTRUCTING THE ROCK GROIN. C CITY OF REN T ON VAR DEPARTMENTS OF PUBLIC WORKS W HONEY CREEK INTERIM REPAIRS RECORD DRAWING REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS WWP -22 -2029 CIVIL DETAILS - 2 SEE ORIGINAL CONTRACT DRAWINGS FOR SEAL AND SIGNATURES R A PLN EVIEW DATE DESIGNED: DATE: 5/93 FILE NAME: 9-24-93 DRAWN: WASTEWATER UTILITY DATE RD RECORD DRAWING DPA JEB 9 -2e -93 CHECKED: SCALE: AS NOTED FIEF BOOK: PAGE: NO. I REVISION I BY I APPR. DATE SHEET: C -IS OF:-